Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100K312 + (ML20100K312)
- ML20100K316 + (ML20100K316)
- ML20100K322 + (ML20100K322)
- BSEP-96-0076, Semiannual Radioactive Effluent Release Rept, for BSEP Units 1 & 2,covering Period from 950701-1231 + (ML20100K327)
- ML20100K332 + (ML20100K332)
- ML20100K334 + (ML20100K334)
- ML20100K340 + (ML20100K340)
- ML20100K341 + (ML20100K341)
- ML20100K346 + (ML20100K346)
- ML20100K347 + (ML20100K347)
- LD-84-071, Forwards CESSAR Changes Re Reduced HPSI Pump Flow.Reanalysis of Most Limiting Small Break LOCA Demonstrates That Sys Performance Is within Acceptance Criteria of 10CFR50.46 + (ML20100K350)
- ML20100K351 + (ML20100K351)
- ML20100K358 + (ML20100K358)
- ML20100K360 + (ML20100K360)
- ML20100K373 + (ML20100K373)
- ML20100K377 + (ML20100K377)
- ML20100K401 + (ML20100K401)
- 05000220/LER-1985-003, On 850304,reactor Scram Initiated.Caused by Technicians Trying to Rectify Error Condition in Transmitter During Monthly Surveillance.Procedure Revised to Caution Technicians on Effects of Errors + (ML20100K412)
- 1CAN128402, Notifies That Lifetime Accumulated Batch Average Burnup of Fuel to Be Discharged at End of Cycle 7 Will Be Less than 36,000 MW-days Per Metric Ton,Per Request + (ML20100K423)
- 05000352/LER-1984-003-02, :on 841031,prior to Initial criticality,CO2 Pilot Gas Supply Valve to Control Valve for Control Room Low Pressure CO2 Hose Racks OHR601 & OHR602 Found Closed Rendering Equipment Inoperable.Valve Opened + (ML20100K435)
- LD-84-070, Forwards Proposed Changes to CESSAR Re Startup Testing for Review.Changes Currently in FSAR Change Process & Will Be Incorporated in CESSAR Amend 10 + (ML20100K444)
- W3P84-3231, Revised Final Significant Const Deficiency Rept 78 Re Breakdown in American Bridge Structural Steel Erection Program.Nonconforming Items Evaluated & Corrective Action Initiated.All Connections Accepted + (ML20100K488)
- FVY-84-143, Informs That 1985 Emergency Plan Exercise Scheduled for 850417.Because New Emergency Operations Facility (EOF) Will Not Be Complete Before 851101,exercise Will Utilize Existing EOF Location + (ML20100K490)
- LD-84-069, Forwards marked-up CESSAR FSAR Pages Reflecting Review of Tech Specs Re First Sys 80 Plant.Rev Involves Interface Requirements for MSIV & Main Feedwater Isolation Valve Closure Time + (ML20100K493)
- 05000454/LER-1985-029, :on 850305,reactor Trip Occurred Due to Trouble Shooting by Instrument Maint Personnel.Caused by Personnel Error.Training Class for Technicians Re Reactor Trip Logic Will Be Conducted + (ML20100K496)
- ML20100K499 + (ML20100K499)
- ML20100K513 + (ML20100K513)
- ML20100K519 + (ML20100K519)
- ML20100K526 + (ML20100K526)
- ML20100K529 + (ML20100K529)
- ML20100K530 + (ML20100K530)
- ML20100K532 + (ML20100K532)
- ML20100K533 + (ML20100K533)
- ML20100K535 + (ML20100K535)
- 05000352/LER-1984-002-02, :on 841031,during Fuel Loading W/Reactor at 0% Power & Control Rods Fully Inserted,Full Scram Occurred W/Audible Alarm Indicating Upscale Trip of IRM Channel B. Caused by Personnel Error.Technician Counseled + (ML20100K537)
- 0CAN118405, Summarizes 841017 Meeting W/Technology for Energy Corp & NRC in Bethesda,Md to Discuss 840830 Final Rept for Phase I of Inadequate Core Cooling Monitoring Sys Confirmatory Test Program & Obtain NRC Concurrence + (ML20100K550)
- ML20100K572 + (ML20100K572)
- ML20100K576 + (ML20100K576)
- ML20100K579 + (ML20100K579)
- ML20100K581 + (ML20100K581)
- ML20100K594 + (ML20100K594)
- ML20100K600 + (ML20100K600)
- ML20100K602 + (ML20100K602)
- BSEP-84-1954, Monthly Operating Repts for Aug 1984 + (ML20100K613)
- ML20100K620 + (ML20100K620)
- ML20100K627 + (ML20100K627)
- ML20100K634 + (ML20100K634)
- ML20100K652 + (ML20100K652)
- 05000368/LER-1984-027, :on 841031,automatic Reactor Trip Occurred. Caused by out-of-range Axial Shape Index.Plant Startup Procedures Modified to Include Guidance for Axial Shape Index Control Considering Core Life + (ML20100K658)
- JAFP-96-0080, Advises That During Cy 95,no Challenges to SRV from Automatic Control Circuits or Pressure Transients Occurred. Total of 30 Operator Demand Challenges Occurred + (ML20100K665)
- ML20100K666 + (ML20100K666)