Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000388/LER-1984-016-01, :on 840809,31-day Surveillance Test Completed Late.Caused by Verbal Miscommunication Between Instrumentation & Controls (I&C) Assistant Foreman & Scheduler.I&C Shop Instruction Implemented + (ML20097F760)
- 05000416/LER-1992-007, :on 920511,determined That TOL Settings for Certain Motors May Not Be Conservative for Extended Operation Undervoltage Conditions.Caused by Applied Voltage. TOL Settings Were Optimized + (ML20097F770)
- ML20097F772 + (ML20097F772)
- 05000424/LER-1992-004-03, :on 920514,reactor Shutdown Due to Excessive Unidentified Leakage.Valve Assembly Removed & Weldolet Plugged + (ML20097F773)
- ML20097F776 + (ML20097F776)
- 0CAN069202, Requests Extension for Submittal of Conceptual Design for Station Blackout Mod to Independent Alternate Ac Power Source from Spring 1992 to 920814.Feasibility of Relocating Existing Combustion Engines Analyzed + (ML20097F780)
- ML20097F786 + (ML20097F786)
- PY-CEI-NRR-2021, Submits Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097F793)
- ML20097F803 + (ML20097F803)
- ML20097F806 + (ML20097F806)
- ML20097F807 + (ML20097F807)
- ML20097F816 + (ML20097F816)
- NSD-NRC-96-4640, Provides Response to Sample Problem for Computer Validation Re Containment Vessel Design for AP600.Differences in Modeling Features Mainly Due to Differences in Analytical Uses within Programs + (ML20097F826)
- ML20097F830 + (ML20097F830)
- NSD-NRC-96-4641, Forwards Response to Request for Addl Info for Use of ASME Boiler & Pressure Vessel Code Case N-284,Rev 1 on AP600 Design + (ML20097F831)
- NSD-NRC-96-4645, Forwards Comparison of Use of ASME Code,Section Viii Criteria Versus ASME Code,Section III for Const of Air Storage Tanks for Main Control Room Habitability Sys + (ML20097F835)
- ML20097F838 + (ML20097F838)
- ML20097F843 + (ML20097F843)
- ML20097F844 + (ML20097F844)
- ML20097F858 + (ML20097F858)
- ML20097F861 + (ML20097F861)
- ML20097F875 + (ML20097F875)
- ML20097F887 + (ML20097F887)
- ML20097F889 + (ML20097F889)
- ML20097F897 + (ML20097F897)
- ML20097F899 + (ML20097F899)
- ML20097F909 + (ML20097F909)
- ML20097F914 + (ML20097F914)
- ML20097F915 + (ML20097F915)
- ML20097F919 + (ML20097F919)
- ML20097F936 + (ML20097F936)
- ML20097F940 + (ML20097F940)
- ML20097F949 + (ML20097F949)
- ML20097F956 + (ML20097F956)
- ML20097F960 + (ML20097F960)
- L-95-050, Technical Evaluation Rept on Second 10-Yr Interval ISI Program Plan:Sce,San Onofre Nuclear Generating Station, Units 2 & 3,Docket Numbers 50-361 & 50-362 + (ML20097F968)
- 05000364/LER-1992-006, :on 920515,reactor Trip Occurred When Control Power Fuses in Two of Four Power Range Nuclear Instruments Blew.Caused by Procedural Inadequacy.All Control Power Fuses Were Replaced & Procedure Revised + (ML20097F971)
- ML20097F984 + (ML20097F984)
- ML20097F987 + (ML20097F987)
- ML20097F991 + (ML20097F991)
- ML20097F993 + (ML20097F993)
- BVY-96-009, Monthly Operating Rept for Jan 1996 for Vermont Yankee Nuclear Power Station + (ML20097F995)
- ML20097F998 + (ML20097F998)
- ML20097G001 + (ML20097G001)
- ML20097G006 + (ML20097G006)
- BSEP-96-0051, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G007)
- 0CAN029605, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G010)
- LIC-96-0012, Forwards Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (ML20097G014)
- ML20097G020 + (ML20097G020)
- NRC-96-0007, Provides Response to Requested 180-day Actions Required by GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves + (ML20097G022)
- ML20097G023 + (ML20097G023)