r Commonw ealth 1:dison Company

'a g

t Quad Cities Generating Station 22710 206th Avenue North

+

Cordova, IL 61212-9740 Tel.40%5 i-22 iI LWP-96-008 January 30, 1996 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Quad Cities Nuclear Power Station Unit 2 Summary Status of Fuel Performance NRC Docket Number 50-265 Enclosed is the Special Report, " Quad-Cities Nuclear Power Station, Unit 2, Summary Status of Fuel Performance, End of Cycle 13, January,1996" 1

letter.

This report is submitted to you in accordance with the Special Report Requirements of Table 6.6-1, Docket Number 50-265, DPR-30.

Respectfully, 1

Y'l dd Y cact L. W. Pearce Station Manager LWP/MSC/sm1 Enclosure cc:

H. Miller, Regional Administrator C. Miller, Senior Resident inspector E. Kraft, Commonwealth Edison T. Rieck, Ceco Letterbook 200048 9602200196 960130 PDR ADOCK 05000265 P

PDR l00{

STMGR\\008%.LWP A Unicom Compan)

/g

l l

l QUAD-CITIES NUCLEAR POWER STATION l

UNIT TWO

SUMMARY

STATUS OF FUEL PERFORMANCE END OF CYCLE THIRTEEN JANUARY, 1996 Quad-Cities Unit Two has completed Thirteen Reactor cycles of operation.

During that time, 2811 fuel assemblies had seen duty in the Unit Two core.

No sipping was performed on reload fuel assemblies at the end of cycle thirteen.

This decision was based on chemical and radiochemical data collected during cycle twelve, which showed no indication of leakage or fuel failure.

For Unit Two Cycle 14, 16 YJ8-GE10B and 128 YJA-GE10B new (barrier clad) assemblies were visually inspected and loaded into the Unit Two Reactor.