- 05000370/LER-1992-006, :on 920409,Unit 2 Experienced a Turbine/Reactor Trip.Caused by Equipment Failure.Personnel Manually Exercised Reactor Trip Breakers + (ML20096A882)
- PY-CEI-NRR-1491, Forwards Rev 0 to Evaluation of Flaw Indication(S) in Perry Feedwater Nozzle to Safe-End Welds, Summary Technical Rept,Per Generic Ltr 88-01 + (ML20096A883)
- ML20096A887 + (ML20096A887)
- ML20096A892 + (ML20096A892)
- ML20096A905 + (ML20096A905)
- ML20096A912 + (ML20096A912)
- NRC-95-0111, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/95-13.Corrective Action:Completed Engineering Design Change Package Showing as-built Configuration of Refueling Floor + (ML20096A939)
- 05000446/LER-1995-004-01, :on 951205,ESFA Was Initiated Due to Failed MFW Pump Speed Controller.Reworked & Repaired MFW Pump Controller + (ML20096A947)
- ULNRC-03311, Advises That Amend 105 to License NPF-30,approving TS Changes to TS 4.1.3.1.2,4.4.6.2.2.b,4.4.3.2,4.6.2.1.d, 4.6.4.2 & TS Table 4.3-3 to Implement Recommendations of NRC GL 93-05 Implemented + (ML20096A948)
- 05000285/LER-1995-008, :on 951204,inadequate Trisodium Phosphate Was in Containment Due to Calculation Error.Revised Appropriate Calculations for Future Operating Cycles + (ML20096A967)
- ML20096A997 + (ML20096A997)
- ML20096B018 + (ML20096B018)
- ML20096B026 + (ML20096B026)
- ML20096B031 + (ML20096B031)
- TXX-9529, Submits Suppl to Util W/Respect to Evaluations Performed for in 92-018, Potential for Loss of Remote Shutdown Capability During CR Fire + (ML20096B050)
- ML20096B051 + (ML20096B051)
- ML20096B052 + (ML20096B052)
- ML20096B060 + (ML20096B060)
- 05000354/LER-1995-039, :on 951208,operation in Excess of 100% Rated Core Thermal Power Occurred Due to Core Thermal Power Calculation Methodology Error.Calculations Revised + (ML20096B079)
- ML20096B085 + (ML20096B085)
- ML20096B087 + (ML20096B087)
- ML20096B098 + (ML20096B098)
- ML20096B101 + (ML20096B101)
- RC-96-0005, Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station + (ML20096B108)
- ML20096B117 + (ML20096B117)
- ML20096B121 + (ML20096B121)
- ML20096B126 + (ML20096B126)
- 05000271/LER-1995-021, :on 951208,plant Scram Occurred Due to Turbine Trip That Resulted from High Rwl.Caused by FW Regulating Valve Failure.Repaired Valves & Retested Satisfactory + (ML20096B153)
- ML20096B161 + (ML20096B161)
- PY-CEI-NRR-0136, Responds to SER Confirmatory Issue 11 on Fuel Rod Mechanical Fracturing & Confirmatory Issue 12 on Fuel Assembly Structural Damage from External Sources.Results from Analysis of Issues Encl + (ML20096B165)
- ML20096B168 + (ML20096B168)
- 05000456/LER-1995-019-03, :on 951207,manual Reactor Trip Initiated During Rod Drop Testing Due to Failed Testing Relays.Reactor Trip Breakers Opened + (ML20096B176)
- 05000361/LER-1995-017, :on 951207,toxic Gas Isolation Sys Monitor Setpoint & Propane Trip Setpoint Was Less than 193 Ppm. Because Personnel Did Not Establish Appropriate Butane Setpoint to Envelope Propane TS Limit + (ML20096B180)
- ML20096B181 + (ML20096B181)
- ML20096B184 + (ML20096B184)
- ML20096B189 + (ML20096B189)
- ML20096B191 + (ML20096B191)
- ML20096B194 + (ML20096B194)
- ML20096B199 + (ML20096B199)
- ML20096B203 + (ML20096B203)
- ML20096B205 + (ML20096B205)
- ML20096B218 + (ML20096B218)
- ML20096B229 + (ML20096B229)
- ML20096B231 + (ML20096B231)
- ML20096B232 + (ML20096B232)
- ML20096B234 + (ML20096B234)
- ML20096B239 + (ML20096B239)
- ML20096B247 + (ML20096B247)
- ML20096B253 + (ML20096B253)
- ML20096B258 + (ML20096B258)
- ML20096B259 + (ML20096B259)