Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096A730 + (ML20096A730)
- ML20096A737 + (ML20096A737)
- ML20096A740 + (ML20096A740)
- ML20096A741 + (ML20096A741)
- W3P84-2362, Responds to Request for Addl Info Re Shutdown Cooling Sys Relief Valve Operability.Valves Will Operate Correctly, Providing Required Pressure Relief Capacity & Reclosing Under Actual Svc Conditions + (ML20096A742)
- ML20096A747 + (ML20096A747)
- ML20096A749 + (ML20096A749)
- ML20096A759 + (ML20096A759)
- ML20096A770 + (ML20096A770)
- ML20096A778 + (ML20096A778)
- ML20096A808 + (ML20096A808)
- ML20096A817 + (ML20096A817)
- FVY-84-103, Requests That NRC Make Listed Change to List Copies Re License DPR-28.JB Sinclair Should Be Deleted from Lists & RW Capstick Added + (ML20096A819)
- ML20096A823 + (ML20096A823)
- ML20096A833 + (ML20096A833)
- 05000265/LER-1992-011-01, :on 920402,reserve Auxiliary Transformer Tripped,Causing Loss of Normal Ac Power to Unit & Trip of Shutdown Cooling.Caused by Inadvertent Deluge Actuation. Tailgate Training Emphasized + (ML20096A835)
- ML20096A863 + (ML20096A863)
- ML20096A867 + (ML20096A867)
- ML20096A875 + (ML20096A875)
- ML20096A876 + (ML20096A876)
- 05000313/LER-1992-001-02, :on 920408,deficiency W/Circuit Breaker Coordination Discovered.Caused by Inadequacies in Original design.D01 & D02 Circuit Breakers Supplying Panels D11,D21, RA1 & RA2 Replaced W/Fuses + (ML20096A877)
- 05000370/LER-1992-006, :on 920409,Unit 2 Experienced a Turbine/Reactor Trip.Caused by Equipment Failure.Personnel Manually Exercised Reactor Trip Breakers + (ML20096A882)
- PY-CEI-NRR-1491, Forwards Rev 0 to Evaluation of Flaw Indication(S) in Perry Feedwater Nozzle to Safe-End Welds, Summary Technical Rept,Per Generic Ltr 88-01 + (ML20096A883)
- ML20096A887 + (ML20096A887)
- ML20096A892 + (ML20096A892)
- ML20096A905 + (ML20096A905)
- ML20096A912 + (ML20096A912)
- NRC-95-0111, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/95-13.Corrective Action:Completed Engineering Design Change Package Showing as-built Configuration of Refueling Floor + (ML20096A939)
- 05000446/LER-1995-004-01, :on 951205,ESFA Was Initiated Due to Failed MFW Pump Speed Controller.Reworked & Repaired MFW Pump Controller + (ML20096A947)
- ULNRC-03311, Advises That Amend 105 to License NPF-30,approving TS Changes to TS 4.1.3.1.2,4.4.6.2.2.b,4.4.3.2,4.6.2.1.d, 4.6.4.2 & TS Table 4.3-3 to Implement Recommendations of NRC GL 93-05 Implemented + (ML20096A948)
- 05000285/LER-1995-008, :on 951204,inadequate Trisodium Phosphate Was in Containment Due to Calculation Error.Revised Appropriate Calculations for Future Operating Cycles + (ML20096A967)
- ML20096A997 + (ML20096A997)
- ML20096B018 + (ML20096B018)
- ML20096B026 + (ML20096B026)
- ML20096B031 + (ML20096B031)
- TXX-9529, Submits Suppl to Util W/Respect to Evaluations Performed for in 92-018, Potential for Loss of Remote Shutdown Capability During CR Fire + (ML20096B050)
- ML20096B051 + (ML20096B051)
- ML20096B052 + (ML20096B052)
- ML20096B060 + (ML20096B060)
- 05000354/LER-1995-039, :on 951208,operation in Excess of 100% Rated Core Thermal Power Occurred Due to Core Thermal Power Calculation Methodology Error.Calculations Revised + (ML20096B079)
- ML20096B085 + (ML20096B085)
- ML20096B087 + (ML20096B087)
- ML20096B098 + (ML20096B098)
- ML20096B101 + (ML20096B101)
- RC-96-0005, Monthly Operating Rept for Dec 1995 for VC Summer Nuclear Station + (ML20096B108)
- ML20096B117 + (ML20096B117)
- ML20096B121 + (ML20096B121)
- ML20096B126 + (ML20096B126)
- 05000271/LER-1995-021, :on 951208,plant Scram Occurred Due to Turbine Trip That Resulted from High Rwl.Caused by FW Regulating Valve Failure.Repaired Valves & Retested Satisfactory + (ML20096B153)
- ML20096B161 + (ML20096B161)
- PY-CEI-NRR-0136, Responds to SER Confirmatory Issue 11 on Fuel Rod Mechanical Fracturing & Confirmatory Issue 12 on Fuel Assembly Structural Damage from External Sources.Results from Analysis of Issues Encl + (ML20096B165)