Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093J812 + (ML20093J812)
- B15395, Forwards Nusco ISI Rept Class,1,2,Sys & Iwf - Supports Millstone Nuclear Power Station Unit 2 for 1995.Insps Covered by Rept Performed Between 941001 & 950802 + (ML20093J814)
- W3P84-2740, Fifth Interim Deficiency Rept of Significant Const Deficiency 108 Re Potential Failure to Comply W/Fsar Safe Shutdown Commitment.Seven Addl Cables Identified as Needing Rerouting.Final Rept Expected by 841031 + (ML20093J815)
- ML20093J818 + (ML20093J818)
- ML20093J820 + (ML20093J820)
- ML20093J825 + (ML20093J825)
- ML20093J829 + (ML20093J829)
- ML20093J831 + (ML20093J831)
- ML20093J834 + (ML20093J834)
- GO2-84-528, RO Re Use of Fan Motor W/O Performing Seismic Qualification. Caused by Motor Failure on Fan WWA-FN-53A.Motor to Be Reinstalled,Qualification Obtained & Spare Motor Ordered + (ML20093J842)
- ML20093J845 + (ML20093J845)
- NLS8400251, Application to Amend License DPR-46,changing Tech Specs to Incorporate Mods to Snubbers & 4-inch Recirculation Bypass Lines.Fee Paid + (ML20093J848)
- ST-HL-AE-1106, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-07 & 50-499/84-07.Corrective Actions:Amend Recording Errors Corrected,Records Reviewed & Distribution Matrices Reviewed Against Station Files + (ML20093J861)
- ML20093J862 + (ML20093J862)
- GO2-84-533, Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification + (ML20093J888)
- ML20093J891 + (ML20093J891)
- ML20093J911 + (ML20093J911)
- ML20093J945 + (ML20093J945)
- 0CAN109509, Provides Sixty Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (ML20093J956)
- ML20093J958 + (ML20093J958)
- 05000446/LER-1995-003-01, :on 950914,discovered Incomplete Surveillance to Confirm Turbine Driven AFW Pump Steam Admission Valves Open Stroke for Black Out Signal.Caused by Less than Adequate Procedures.Procedures Revised + (ML20093J973)
- ML20093J978 + (ML20093J978)
- ML20093J987 + (ML20093J987)
- ML20093J991 + (ML20093J991)
- ML20093J999 + (ML20093J999)
- ML20093K002 + (ML20093K002)
- ML20093K019 + (ML20093K019)
- ML20093K020 + (ML20093K020)
- ML20093K032 + (ML20093K032)
- ML20093K035 + (ML20093K035)
- ML20093K047 + (ML20093K047)
- ST-HL-AE-5180, Provides Schedule for Completion of Actions Requested in GL 95-07 for South Tx Project Units 1 & 2 + (ML20093K061)
- ML20093K062 + (ML20093K062)
- RBG-18235, Interim Deficiency Rept DR-123 Re HVAC Duct Work Supplied by Mccroskey Sheet Metal.Next Rept Expected by 840919 + (ML20093K065)
- ML20093K069 + (ML20093K069)
- ML20093K075 + (ML20093K075)
- ML20093K081 + (ML20093K081)
- ML20093K083 + (ML20093K083)
- 05000395/LER-1984-038, :on 840907,second Position Indication Channel for PORV Declared Inoperable.Caused by Procedural Inadequacies in Surveillance Test Procedures 135.001 & 506.010.Channel Calibr + (ML20093K084)
- ML20093K090 + (ML20093K090)
- ML20093K093 + (ML20093K093)
- ML20093K095 + (ML20093K095)
- 05000255/LER-1984-020, :on 840906,review Determined Surveillance Testing Not Performed on Seven Valves in Hot Leg Injection Sys.Caused by Valves Not Being Included in Testing Program Due to Personnel Error.Valves Tested + (ML20093K098)
- ML20093K101 + (ML20093K101)
- RBG-18234, Final Deficiency Rept DR-159 Re Fuses in Explosive Valve Circuits of Standby Liquid Control Sys.Evaluation Indicated 2-ampere Fuse Correct.Item Not Reportable Per 10CFR50.55(e) + (ML20093K104)
- ML20093K105 + (ML20093K105)
- ML20093K106 + (ML20093K106)
- BVY-95-107, Transmits 60 Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gates Valves + (ML20093K107)
- ML20093K109 + (ML20093K109)
- RBG-18223, Interim Deficiency Rept DR-175 Re HPCS Diesel Batteries Supplied by Ge.Next Rept Expected by 841010 + (ML20093K115)
- ML20093K116 + (ML20093K116)