Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093J698 + (ML20093J698)
- NLS8400201, Forwards Rev 2 to Updated FSAR for Cooper Nuclear Station.Qa Program Removed from FSAR & Radwaste Components Reclassified + (ML20093J699)
- ML20093J704 + (ML20093J704)
- ML20093J732 + (ML20093J732)
- ML20093J745 + (ML20093J745)
- ML20093J752 + (ML20093J752)
- 05000339/LER-1995-001-01, :on 950403,MS Pressurizer Safety Valve Setpoints Out of Tolerance Due to Setpoint Drift.Repaired MSSVs + (ML20093J754)
- ML20093J761 + (ML20093J761)
- ML20093J763 + (ML20093J763)
- 05000374/LER-1984-057, :on 840830,differential Flow Isolation on Reactor Water Cleanup Sys Occurred During Hot Shutdown. Caused by Density Differences Detected by Flow Instruments. Instrument Calibr Range Changes Investigated + (ML20093J766)
- ML20093J773 + (ML20093J773)
- 05000249/LER-1984-014-05, :on 840904,ECCS Surveillances Not Completed Prior to Rendering Loop a Inoperable.Caused by Personnel Error While Taking LPCI Component Cooling Svc Water HX Delta P Valve Out of Svc + (ML20093J776)
- ML20093J783 + (ML20093J783)
- RBG-19073, Interim Deficiency Rept DR-241 Re Malfunctioning Voltage Regulator on Standby Diesel Generator.Initially Reported on 840831.Faulty Unit Replaced W/Part from Secondary Generator. Next Rept Expected by 841101 + (ML20093J787)
- ML20093J790 + (ML20093J790)
- ML20093J792 + (ML20093J792)
- ML20093J795 + (ML20093J795)
- RBG-19070, Interim Deficiency Rept DR-191 Re Improperly Sized Gould-supplied Buchanan Stacking Type Terminal Blocks for Power Cables Feeding Loads from 125-volt Dc Motor Control Ctr.Initially Reported on 840829.Next Rept by 841116 + (ML20093J802)
- ML20093J808 + (ML20093J808)
- ML20093J812 + (ML20093J812)
- B15395, Forwards Nusco ISI Rept Class,1,2,Sys & Iwf - Supports Millstone Nuclear Power Station Unit 2 for 1995.Insps Covered by Rept Performed Between 941001 & 950802 + (ML20093J814)
- W3P84-2740, Fifth Interim Deficiency Rept of Significant Const Deficiency 108 Re Potential Failure to Comply W/Fsar Safe Shutdown Commitment.Seven Addl Cables Identified as Needing Rerouting.Final Rept Expected by 841031 + (ML20093J815)
- ML20093J818 + (ML20093J818)
- ML20093J820 + (ML20093J820)
- ML20093J825 + (ML20093J825)
- ML20093J829 + (ML20093J829)
- ML20093J831 + (ML20093J831)
- ML20093J834 + (ML20093J834)
- GO2-84-528, RO Re Use of Fan Motor W/O Performing Seismic Qualification. Caused by Motor Failure on Fan WWA-FN-53A.Motor to Be Reinstalled,Qualification Obtained & Spare Motor Ordered + (ML20093J842)
- ML20093J845 + (ML20093J845)
- NLS8400251, Application to Amend License DPR-46,changing Tech Specs to Incorporate Mods to Snubbers & 4-inch Recirculation Bypass Lines.Fee Paid + (ML20093J848)
- ST-HL-AE-1106, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-07 & 50-499/84-07.Corrective Actions:Amend Recording Errors Corrected,Records Reviewed & Distribution Matrices Reviewed Against Station Files + (ML20093J861)
- ML20093J862 + (ML20093J862)
- GO2-84-533, Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification + (ML20093J888)
- ML20093J891 + (ML20093J891)
- ML20093J911 + (ML20093J911)
- ML20093J945 + (ML20093J945)
- 0CAN109509, Provides Sixty Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (ML20093J956)
- ML20093J958 + (ML20093J958)
- 05000446/LER-1995-003-01, :on 950914,discovered Incomplete Surveillance to Confirm Turbine Driven AFW Pump Steam Admission Valves Open Stroke for Black Out Signal.Caused by Less than Adequate Procedures.Procedures Revised + (ML20093J973)
- ML20093J978 + (ML20093J978)
- ML20093J987 + (ML20093J987)
- ML20093J991 + (ML20093J991)
- ML20093J999 + (ML20093J999)
- ML20093K002 + (ML20093K002)
- ML20093K019 + (ML20093K019)
- ML20093K020 + (ML20093K020)
- ML20093K032 + (ML20093K032)
- ML20093K035 + (ML20093K035)
- ML20093K047 + (ML20093K047)
- ST-HL-AE-5180, Provides Schedule for Completion of Actions Requested in GL 95-07 for South Tx Project Units 1 & 2 + (ML20093K061)