Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092A751 + (ML20092A751)
- ML20092A752 + (ML20092A752)
- ML20092A754 + (ML20092A754)
- ML20092A755 + (ML20092A755)
- ML20092A757 + (ML20092A757)
- ML20092A761 + (ML20092A761)
- ML20092A762 + (ML20092A762)
- 05000269/LER-1984-002-03, :on 840512,reactor Trip Initiated by Reactor Protection Sys When High RCS Pressure Setpoint Reached. Caused by Key Selector Switch & Reactor Coolant Outlet Temp Relay Failure.Relay Replaced + (ML20092A764)
- 05000338/LER-1992-002-01, :on 920110, as Found Set Pressure for a Pressurizer Safety Valve Found Outside Setpoint Tolerence Due to Setpoint Drift.Safetyvalves Will Be Repaired & Readjusted as Necessary + (ML20092A767)
- ML20092A770 + (ML20092A770)
- ML20092A775 + (ML20092A775)
- ML20092A776 + (ML20092A776)
- 0CAN029204, Forwards Endorsement 96 to Nelia Policy NF-0210,Endorsement 85 to Maelu Policy MF-0074,Endorsement 10 to Nelia Policy NW-0116,Endorsement 10 to Maelu Policy MW-0047 & Endorsement 23 to Nelia Policies N-0048 & N-0068 + (ML20092A777)
- 05000334/LER-1992-001, :on 911208,operations Personnel Noted That Procedure Only Required Timing Valve to Open Position.Caused by Procedural Deficiencies.Series Isolation Valve for Involved Valves Verified + (ML20092A780)
- ML20092A782 + (ML20092A782)
- ML20092A783 + (ML20092A783)
- 05000321/LER-1992-001-01, :on 920113,area Radiation Monitor Tripped, Resulting in Main Control Room Environ Control Sys to Transfer to Pressurization Mode.Caused by Drift in 24-volt Dc Module.Power Supply Replaced + (ML20092A784)
- ML20092A792 + (ML20092A792)
- ML20092A804 + (ML20092A804)
- ML20092A808 + (ML20092A808)
- ML20092A809 + (ML20092A809)
- ML20092A813 + (ML20092A813)
- ML20092A817 + (ML20092A817)
- ML20092A821 + (ML20092A821)
- ML20092A826 + (ML20092A826)
- ML20092A827 + (ML20092A827)
- 0CAN029201, Responds to Generic Ltr 91-11, Resolution of Generic Issue 48, LCOs for Class 1E Vital Instrument Buses & 49, Interlocks & LCOs for Class 1E Tie Breakers + (ML20092A837)
- 05000259/LER-1984-023-01, :on 840518,internal Panel Wire Supplying Power to Primary Containment Isolation Sys Valves Came Loose Giving Intermittent Signals.Caused by Incorrectly Terminated Wire.Wire Reterminated + (ML20092A840)
- ML20092A847 + (ML20092A847)
- ML20092A849 + (ML20092A849)
- ML20092A852 + (ML20092A852)
- ML20092A871 + (ML20092A871)
- ML20092A876 + (ML20092A876)
- BVY-92-009, Forwards Supplemental Response to Insp Rept 50-271/91-80. Corrective Actions:Differential Pressure Testing of motor- Operated Valves,Which Represent 12% of Generic Ltr 89-10 Population,Will Be Performed + (ML20092A892)
- ML20092A895 + (ML20092A895)
- ML20092A899 + (ML20092A899)
- ML20092A902 + (ML20092A902)
- ML20092A929 + (ML20092A929)
- HL-2035, Responds to NRC Re Violations Noted in Insp Repts 50-321/91-31 & 50-366/91-31.Corrective Actions:Supports W/ Questionable Documentation Will Be Reanalyzed & Calculations Retained + (ML20092A938)
- ML20092A943 + (ML20092A943)
- ML20092A952 + (ML20092A952)
- ML20092A965 + (ML20092A965)
- ML20092A973 + (ML20092A973)
- ML20092A974 + (ML20092A974)
- ML20092A999 + (ML20092A999)
- ST-HL-AE-4794, Confirms 940509 Telcon Which Requested Mgt Meeting W/Nrc on 940517.Purpose of Meeting to Discuss Status & Readiness for Return to Power Operation of Plant + (ML20092B001)
- ML20092B006 + (ML20092B006)
- ML20092B026 + (ML20092B026)
- ML20092B027 + (ML20092B027)
- ML20092B029 + (ML20092B029)
- ML20092B043 + (ML20092B043)