Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20091C440 + (ML20091C440)
- PLA-2218, Ro:On 840323,results of Filtration Sys Test,Following Painting in Reactor Bldg,Revealed Charcoal in Equipment Compartment Exhaust Charcoal Absorbers 2F257A & B Required Replacement.Work Authorization Issued + (ML20091C442)
- ML20091C445 + (ML20091C445)
- ML20091C454 + (ML20091C454)
- ML20091C464 + (ML20091C464)
- ST-HL-AE-3826, Forwards Endorsements 3,8,9,10,11 & 12 to Maelu Policy M-113,Endorsements 1-5 & 7-12 to Maelu Policy M-116, Endorsements 2,3,7,8,9 & 10 to Nelia Policy N-113 & Endorsements 1-10 to Nelia Policy N-116 + (ML20091C465)
- ML20091C467 + (ML20091C467)
- ML20091C468 + (ML20091C468)
- AECM-84-0261, Responds to NRC Re Violations Noted in IE Insp Rept 50-416/84-07.Corrective Actions:Matrix/Punchlist Developed to Track Correct Status of Emergency Preparedness Training of Plant Personnel,Per Procedure 01-S-04-21 + (ML20091C470)
- ML20091C472 + (ML20091C472)
- ML20091C476 + (ML20091C476)
- ML20091C482 + (ML20091C482)
- ML20091C498 + (ML20091C498)
- ML20091C501 + (ML20091C501)
- ML20091C502 + (ML20091C502)
- 1CAN058405, Submits Info Re Reactor Trip Breaker Shunt Trip Installation,In Response to NRC 840124 & 27 Ltrs.Shunt Trip Operable from Automatic Reactor Protection Signal & Tested on Monthly Basis Using safety-related Procedures + (ML20091C513)
- ML20091C516 + (ML20091C516)
- ML20091C522 + (ML20091C522)
- RBG-35-397, Requests Permission to Operate Facility Addl 5000 Hours Until Fourth Refueling Outage W/O Reperforming Exam of N4A-2 Feedwater Nozzle to safe-end Weld & That NRC Amend Safety Evaluation Reflecting Info Contained in Encl Rept + (ML20091C526)
- 3F0484-22, Forwards Revised Response to NRC Re Violations Noted in IE Insp Rept 50-302/84-02.Corrective Actions: Personnel Counseled on Importance of Procedural Adherence & Procedure CH-338 Revised + (ML20091C533)
- ML20091C539 + (ML20091C539)
- ML20091C540 + (ML20091C540)
- AECM-84-0283, Forwards Application for Amend to License NPF-13,changing Tech Specs to Revise Various Administrative Controls Reflecting Changes in Offsite Organization Chart + (ML20091C550)
- 3F0384-11, Forwards Response to Violations Noted in IE Insp Rept 50-302/84-02.Corrective Actions:Personnel Instructed on Requirements of Radiation Procedure RP-101 & Adherence to Procedures Reinforced + (ML20091C558)
- ML20091C569 + (ML20091C569)
- ML20091C579 + (ML20091C579)
- ML20091C614 + (ML20091C614)
- ML20091C626 + (ML20091C626)
- ML20091C628 + (ML20091C628)
- ML20091C658 + (ML20091C658)
- 05000311/LER-1984-011, :on 840428,during Testing Resulting from Two Reactor Trips,Steam Generator 23 Feedwater Flow Indication Channels Unresponsive.Both Channels Declared Inoperable. Feedwater Flow Nozzle Replaced + (ML20091C670)
- ML20091C671 + (ML20091C671)
- ML20091C687 + (ML20091C687)
- ML20091C690 + (ML20091C690)
- ML20091C695 + (ML20091C695)
- ML20091C701 + (ML20091C701)
- ML20091C702 + (ML20091C702)
- ML20091C715 + (ML20091C715)
- ML20091C728 + (ML20091C728)
- ML20091C754 + (ML20091C754)
- ML20091C768 + (ML20091C768)
- ML20091C770 + (ML20091C770)
- JPN-91-039, Responds to Request for Addl Info Re Generic Ltr 89-10, Suppl 3, Consideration of Results of NRC-Sponsored Tests of Motor-Operated Valves, Per + (ML20091C773)
- ML20091C774 + (ML20091C774)
- ML20091C809 + (ML20091C809)
- ML20091C812 + (ML20091C812)
- U-601956, Suppls 900719 Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount, Per 911223 Telcon W/Nrc.List of Replaced/Suspect Transmitters Used in ESF or Reactor Protection Sys Applications Encl + (ML20091C813)
- ML20091C816 + (ML20091C816)
- ML20091C821 + (ML20091C821)
- ML20091C824 + (ML20091C824)
- ML20091C830 + (ML20091C830)