ML20091C626
| ML20091C626 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/31/1991 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19302E976 | List: |
| References | |
| LIC-91-198R, NUDOCS 9108070029 | |
| Download: ML20091C626 (2) | |
Text
_.. _ _.. _..
~.
(
' ~. 3
=
Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102 2247 402/636 2000 July 31, 1991 LIC 91-;98R U. S. Nuclear Regulatory Commission Attn: Documert Control Desk Mail Station Pl-137 i
Washington, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from OPPD (W. G, Gates) to NRC (Document Control Desk) dated April 19, 1991 (LIC-91-0126R) 3.
Letter from 0 PPD (W. G. Gates) to NRC (Document Control Desk) cated July 26, 1991 (LIC-91-140R)
Gentlemen:
SUBJECT:
Westinghouse LOCA/ECCS Methodology Topical Reports and Control Element Assembly Ejection Analysis Report for fort'Calhoun Station Omaha Puolic Power District (0 PPD) is enclosir,g twenty-three (23) copies each
-of the proprietary (WCAP-13027) and nonproprietary (WCAP-13028) versions of the lopical Report titled " Westinghouse ECCS Evaluation Model for AnSysis of CE-NSSS," dated July 1991.
Pursuant to 10 CFR 2.790, Westinghouse-has determined that Topical Report WCAP-13027 contains proprietary information to be withheld from public disclosure and has provided the enclosed documentation justifying this determination, i
Also enclosed is a report ti!. led " Fort Calhoun Unit 1 Control Element Assembly Ejection Analysis Report." OPPD committed to provide these reports in items 1
-and 3 of Reference 2.
As Mr. T. G. Therkildsen (OPPD) indicated to Mr. W. C. Walker (NRL Project Manager) in a telephone conversation on July 30, 1991, OPPD discovcred input errors in the Cycle 14 Small/Large. Break LOCA Analysis (item 2 of Reference 2) and must delay submittal of that report until September 1991.
sk (f L
'6Cf a b
lon dz i IM E W 288 3a8 L
,My i #
P PDR Emsw = g y g y au w 4ssiza J
U. ' S.L Nuclear Regulatory Commission LIC 91-198R Page 2 If you should have any questions, please contact me.
Sincerely, W. G. Catesje Division Mafiager Nuclear Operations WGG/sel Enclosures c:
LeBoeuf, Lamb, Leiby &'MacRae (w/o Enclosures)
R. D. Martin, NRC Regional Administrator, Region IV (w/o Enclosures)
W. C. Walker, NRC Project Manager (w/o Enclosures)
R. P. Mullikin, NRC Senior Resident inspector (w/o Enclosures)
H.- Borchert, Director - Division of Radiological Health, Nebraska Department of Health (w/o Enclosures)
. ~... _.. -..-.....-- -..., _.. _... _ _ _..,...__,,,.,....., _
, _. ~, _., _
m.
.