Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085L931 + (ML20085L931)
- ML20085L936 + (ML20085L936)
- ML20085L941 + (ML20085L941)
- ML20085L943 + (ML20085L943)
- ML20085L946 + (ML20085L946)
- ML20085L950 + (ML20085L950)
- ML20085L955 + (ML20085L955)
- 05000267/LER-1976-009, :on 761116,inconsistency Discovered Between Accident Analysis Assumptions Used in Tech Specs & Fsar. Caused by Oversight in Original Analyses of Tech Spec Bases. Further Analyses Continuings + (ML20085L961)
- ML20085L964 + (ML20085L964)
- ML20085L968 + (ML20085L968)
- ML20085L969 + (ML20085L969)
- ML20085L972 + (ML20085L972)
- ML20085L976 + (ML20085L976)
- ML20085L979 + (ML20085L979)
- ML20085L987 + (ML20085L987)
- ML20085L992 + (ML20085L992)
- ML20085L998 + (ML20085L998)
- LIC-95-0120, Forwards Response to Anomalies Noted in SER for Third 10-yr Interval IST Program for Fcs,Ist Selection Philosophy & Rev 2 to ISI Program Plan for 1993-2003 Interval + (ML20085M001)
- ML20085M004 + (ML20085M004)
- ML20085M007 + (ML20085M007)
- ML20085M008 + (ML20085M008)
- 3F0695-06, Submits Request for Exemption from 10CFR73.55(d)(5) for Use of Hand Geometry Devices.Physical Security Plan Will Be Revised to Allow Licensee Employees & Contractors to Take Badges Offsite + (ML20085M012)
- ML20085M017 + (ML20085M017)
- ML20085M021 + (ML20085M021)
- ML20085M025 + (ML20085M025)
- ML20085M030 + (ML20085M030)
- ML20085M035 + (ML20085M035)
- ML20085M041 + (ML20085M041)
- ML20085M046 + (ML20085M046)
- ML20085M053 + (ML20085M053)
- 05000267/LER-1976-009-01, During Reactor Shutdown, Bearing Water Pump Suction Valve Stroked W/Circulator Operating.Caused by Failure of Test Crew & Shift Supervisor to Check Work Prerequisite.Personnel Counseled + (ML20085M059)
- 05000267/LER-1976-008, :on 761101,analysis of Low Temp Absorbers Indicated Inadequate Heat Removal Capacity for Loss of Forced Cooling Accident.Caused by Design Error.Emergency Procedures Changeds + (ML20085M070)
- 05000267/LER-1976-008-01, :on 760322,during Shutdown,Helium Circulator 1A Tripped.Caused by Loss of Bearing Water Due to Instrument Bypass Valve Being Closed Too Quickly.Four Drain Level Indicating Switches Added + (ML20085M076)
- 05000267/LER-1976-007, A:On 760310,during Isolation of Helium Circulator 1D,static Seal Actuation Line Could Not Be Pressurized. Caused by Component Failure.Circulator Replaced W/Spare + (ML20085M082)
- 05000267/LER-1976-006, :on 760804,hand Valve HV-2246 Appeared Not to Close Fully When Actuated.Cause Undetermined.Investigation Continuing + (ML20085M087)
- 05000267/LER-1976-006-01, :on 761219,during Rise to Full Power Testing, Primary Coolant Moisture Level Exceeded Limits of Tech Specs.Caused by Evolution of Water from Pcrv.Purification Sys Removed Excess Water + (ML20085M094)
- 05000267/LER-1976-006-02, :on 760227-0302,during Cold Shutdown,Seven Helium Circulator Trips Occurred.Caused by Water Accumulation in Instrument Sensing Lines & Operator Error.Sense Lines Cleared of Water.Operators Counseled + (ML20085M104)
- ML20085M108 + (ML20085M108)
- 05000267/LER-1975-005, C:On 761011,while Establishing Backup Bldg Water Sys,Circulator C-2102 Tripped.Caused by Procedure Deficiency.Sys Operating Procedure Changed.Operator Cautioned + (ML20085M121)
- ML20085M135 + (ML20085M135)
- ML20085M138 + (ML20085M138)
- ML20085M143 + (ML20085M143)
- 05000263/LER-1993-008, :on 930731,RPS Trip Occurred.Caused by Reduction in Reactor FW Flow Due to Ground Fault Relay Trip of Main Condensate Pump.Motor Replaced During 1994 Refueling Outage + (ML20085M150)
- ML20085M151 + (ML20085M151)
- ML20085M157 + (ML20085M157)
- ML20085M158 + (ML20085M158)
- ML20085M160 + (ML20085M160)
- ML20085M161 + (ML20085M161)
- ML20085M165 + (ML20085M165)
- ML20085M168 + (ML20085M168)
- ML20085M171 + (ML20085M171)