Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000220/LER-1976-036, :on 761015,lo-lo-lo Reactor Water Level Switch RE-18A Failed to Provide Trip at Indicated Inches.Caused by Apparent Setpoint Drift.Switch Inspected & Recalibr.W/ + (ML20084B438)
- IR 05000254/1972010 + (ML20084B442)
- ML20084B442 + (ML20084B442)
- 05000220/LER-1976-035, :on 761012,benthos Bimonthly Collection for Aug 1976 Not Performed Unitl 760904.Caused by Recent OSHA Regulations Imposed on Prof Divers + (ML20084B445)
- ML20084B448 + (ML20084B448)
- ML20084B450 + (ML20084B450)
- 05000220/LER-1976-034, :on 761012,milk Samples Collected on 760920 Not Counted Until 760928-30.Caused by Delay in Shipping.W/ + (ML20084B455)
- ML20084B456 + (ML20084B456)
- RBG-17599, Interim Deficiency Rept DR-173 Re Elbows,Supplied by Ge,For Main Steam Sys.Investigation Incomplete.Next Rept Will Be Submitted by 840608 + (ML20084B460)
- ML20084B463 + (ML20084B463)
- 05000220/LER-1976-033, :on 760908,Tech Spec Required Surveillance on Vacuum Breaker Exercising Following Relief Valve Discharge to Torus Not Performed Following Scrams on 760806 & 23. Caused by Not Posting Requirements on Checkoff Sheets + (ML20084B467)
- L-95-013, Forwards Corrected Monthly Operating Repts for Apr 1995 for Point Beach Nuclear Plant,Units 1 & 2.Ltr Did Not Take Into Account for Daylight Saving Time.Requests That Encl Data for Apr 1995 Be Used + (ML20084B479)
- 05000220/LER-1976-032, :on 760827,RE-22A Tripped Higher than Required Psig Value During Surveillance Testing of Main Steam Line Break Instrumentation.Caused by Setpoint drift.RE-22A Recalibr + (ML20084B482)
- ML20084B484 + (ML20084B484)
- ML20084B487 + (ML20084B487)
- SNRC-1022, Responds to NRC Re Violations Noted in IE Insp Rept 50-322/84-01.Corrective Actions:Damaged Components on Diesel Generator 101 Repaired & Rocker Arm Shaft hold-down Bolts for Diesel Generators Checked for Torque + (ML20084B489)
- 05000220/LER-1976-031, :on 760809,feedwater Pump 11 Failed to Start When Manually Initiated.Cause by Agastat Time Delay Model 2462 PD Failure + (ML20084B491)
- ML20084B493 + (ML20084B493)
- RBG-17585, Final Deficiency Rept DR-112 Re Class IE Battery Chargers Supplied by Power Conversion Products,Inc.Initially Reported on 830809.Vendor Revised QA Program to Include Better Training + (ML20084B498)
- 05000220/LER-1976-030, :on 760805,review Revealed That Condenser Delta Temp & Discharge Canal Temp Not Recorded Hourly During 760717-22.Caused by Computer Typers Being Down Due to New Instrumentation Installation.Data Through 760731 Invalid + (ML20084B501)
- 05000220/LER-1976-029, :on 760805,milk Sample Not Analyzed for I-131 within 8 Days of Collection.Caused by Mail Backlog Due to Holiday Weekend + (ML20084B505)
- ML20084B508 + (ML20084B508)
- ML20084B513 + (ML20084B513)
- ML20084B519 + (ML20084B519)
- 05000220/LER-1976-025, :on 760627,average Power Range Monitors 11 & 15 Failed to Produce Scram Signal at Required Flow Bias Setpoint.Caused by Setpoint Drift.Instruments Calibr to Required Specs + (ML20084B529)
- ML20084B533 + (ML20084B533)
- 05000220/LER-1976-024, :on 760613,average Power Range Monitors 17 & 18 Failed to Produce Scram Signal at Required Flow Bias Setpoint.Caused by Setpoint Drift.Instrument Recalibr to Required Specs + (ML20084B534)
- 05000220/LER-1976-023, :on 760625,smoke Observed from Relay 4-112 B/40. Caused by Apparently Shorted Coil,Resulting in Blown Fuse. Relay Replaced + (ML20084B546)
- B15247, Requests NRC to Terminate Senior Operator License SOP-10060-3 for DM Emborsky,Effective 950501 + (ML20084B552)
- 05000220/LER-1976-022, :on 760527,review Revealed That Fish Impinged Exceeded ETS Limits During Routine Sampling on 760519-27. Cause Not Related to Station Operation.Species of Fish Involved Migrate Inshore in Spring + (ML20084B557)
- 05000220/LER-1976-020, :on 760423,switch 1B05C,indicating Emergency Cooling High Flow & Isolating Sys,Actuated Higher than Required 19 Psid.Caused by Setpoint Drift + (ML20084B561)
- ML20084B566 + (ML20084B566)
- 05000220/LER-1976-021, :on 760515,shutdown Cooling Sys dc-operated Instrumentation Valve 38-02 Failed to Function.Caused by Open in in Motor Windings.Motor Rewound + (ML20084B570)
- ML20084B573 + (ML20084B573)
- 05000336/LER-1995-016, :on 950428,operator W/Inactive SRO License Assumed Position of Fuel Handling SRO for Movement of Upper Guide Structure Into Rv.Caused by Failure to Recognize Inactive Status.Briefing Conducted + (ML20084B578)
- 05000220/LER-1976-019, :on 760423,turbine Anticipatory Trip Bypass Reactor Scram Switch Actuated Higher than Required Psig During Surveillance Testing.Caused by Setpoint Drift.Switch Recalibr & Returned to Svc + (ML20084B579)
- ML20084B593 + (ML20084B593)
- ML20084B606 + (ML20084B606)
- ML20084B611 + (ML20084B611)
- ML20084B612 + (ML20084B612)
- ML20084B619 + (ML20084B619)
- ML20084B632 + (ML20084B632)
- ML20084B646 + (ML20084B646)
- 05000361/LER-1995-004, :on 941114,valve Release Weight Stuck & Did Not Drop Upon Electronic Actuation & Valve Did Not Open as Required.Replaced Incorrectly Mfg Weight Switch on 950126 & Ensured Correct Positioning + (ML20084B647)
- ML20084B653 + (ML20084B653)
- 3F0595-12, Delay in Performance of Surveillance Resulting in Violation of TSs + (ML20084B668)
- ML20084B670 + (ML20084B670)
- ML20084B676 + (ML20084B676)
- ML20084B677 + (ML20084B677)
- 05000244/LER-1977-002-01, /01T-0:on 770217,Westinghouse Notified That Reactivity Insertion Curve Used for Safety Analyses Not Sufficiently Conservative.Caused by Westinghouse Error + (ML20084B680)
- ML20084B687 + (ML20084B687)