ML20084B611
| ML20084B611 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/22/1995 |
| From: | Krieger R SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20084B615 | List: |
| References | |
| NUDOCS 9505310286 | |
| Download: ML20084B611 (1) | |
Text
E p,. '-
fCl?
Southem Calihmia Edison Company P O sox t28 S AN CLEM ENTE, CALIFORNIA 92674 0128 m w MRIEGER TELEPMoht
.,u........,
.......n.
May 22, 1995 u........r.
U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Subject:
Docket No. 50-361 30-Day Report Licensee Event Report No.95-004 San Onofre Nuclear Generating Station, Unit 2 Pursuant to 10 CFR 50.73(d), this submittal provides the required 30-day written Licensee Event Report ( LER )'
for the discovery of an inoperable non-safety related fire sprinkler system.
Neither the health nor the safety of plant personnel or the public was affected by this occurrence.
If you require any additional information, please so advise.
Sincerely, t
/
h hh@
\\
)
Enclosure:
LER No.95-004 cc:
L.
J.
Callan, Regional Administrator, USNRC Region IV A.
B.
Beach, Director, Division of Reactor Projects, NRC Region IV K.
E.
- Perkins, Jr.,
Director, USNRC Region IV Walnut Creek Field Office J.
Sloan, USNRC Senior Resident Inspector, Units 2 & 3 M. B.
Fields, NRC Project Manager, San Onofre Units 2 & 3 Institute of Nuclear Power Operations (INPO) 9505310286 950522 PDR ADOCK 05000361 S
%