Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083J362 + (ML20083J362)
- ML20083J368 + (ML20083J368)
- ML20083J369 + (ML20083J369)
- ML20083J372 + (ML20083J372)
- ML20083J373 + (ML20083J373)
- 05000362/LER-1983-112-03, /03L-0:on 831130,regulating Group 6 Control Element Assemblies Exceeded Time Allowed Below long-term steady-state Insertion Limit.Caused by Need to Control Axial Shape Index Oscillations + (ML20083J374)
- 05000275/LER-1983-033-03, /03L-0:on 831202,source Range Instrumentation Channels Deenergized for 2 Minutes During Surveillance Test. Caused by I&C Technician Failing to Follow Written Procedure.I&C Personnel Instructed + (ML20083J376)
- ML20083J377 + (ML20083J377)
- 3F0184-11, NPDES Noncompliance Notification:On 831226 & 27,temp Limits Exceeded.Caused by Massive Influx of Dead & Stunned Fish as Result of Rapidly Declining Cooling Water Temp Accompanied by High Winds.Intake Structures Cleaned + (ML20083J381)
- ML20083J382 + (ML20083J382)
- ML20083J383 + (ML20083J383)
- 05000346/LER-1982-053-03, Alarm Trip Received on Steam & Feedwater Rupture Control Sys Channel 2 Due to Failure of Steam Generator Instrument Channel 2 Power Supply.Failure Caused Power Supply Trip + (ML20083J384)
- ML20083J385 + (ML20083J385)
- 05000362/LER-1983-110-03, /03L-0:on 831202 & 22,subj Control Element Assemblies Slipped & Became Misaligned from Other Assemblies in Group.Caused by Sluggish Operation of Assemblies,Causing Upper & Lower Grippers to Sequence Improperly + (ML20083J386)
- ML20083J387 + (ML20083J387)
- ML20083J395 + (ML20083J395)
- ML20083J397 + (ML20083J397)
- ML20083J398 + (ML20083J398)
- ML20083J405 + (ML20083J405)
- ML20083J408 + (ML20083J408)
- ML20083J409 + (ML20083J409)
- ML20083J413 + (ML20083J413)
- ML20083J415 + (ML20083J415)
- BECO-83-250, Responds to NRC SALP Rept for Jul 1982 - June 1983, Discussing Plant Operations,Radiological Controls,Maint, Housekeeping/Fire Protection,Security,Surveillance,Emergency Preparedness & Licensing Activities + (ML20083J417)
- ML20083J421 + (ML20083J421)
- ML20083J423 + (ML20083J423)
- ML20083J424 + (ML20083J424)
- ML20083J425 + (ML20083J425)
- ML20083J426 + (ML20083J426)
- ML20083J429 + (ML20083J429)
- 05000346/LER-1981-061, Revised LER 81-061/03X-2:on 811003 & 20,absolute Position Indication on Group 4,rod 7 Became Erratic,Fluctuating 5-10% of Full Range.Caused by Loss of Electrical Penetration Module Signal.Module Replaced + (ML20083J431)
- ML20083J433 + (ML20083J433)
- ML20083J435 + (ML20083J435)
- ML20083J442 + (ML20083J442)
- ML20083J448 + (ML20083J448)
- ML20083J451 + (ML20083J451)
- ML20083J459 + (ML20083J459)
- ML20083J468 + (ML20083J468)
- ML20083J475 + (ML20083J475)
- ML20083J477 + (ML20083J477)
- ML20083J479 + (ML20083J479)
- BSEP-83-4055, Ro:On 831122,limiting Conditions for Operation Implemented When Fire Doors 112,117,103,105,108 & 123 Declared Inoperable.Caused by High Differential Air Pressure Preventing Automatic self-closure + (ML20083J482)
- ML20083J484 + (ML20083J484)
- ML20083J487 + (ML20083J487)
- ML20083J489 + (ML20083J489)
- B10982, Forwards Completed Staffing Level Survey Expected to Be in Place When OL Issued.Anticipated Yrs of Experience for Reactor Operators at Time of Issuance Noted + (ML20083J493)
- ML20083J497 + (ML20083J497)
- ML20083J501 + (ML20083J501)
- ML20083J504 + (ML20083J504)
- RBG-16-622, Suppls 820219 Responses to NRC 810805 & 1217 Ltrs on GDC 51 Re Fracture Prevention of Containment Pressure Boundary Matls + (ML20083J505)
- B10973, Forwards Addl Geologic Zone Matrices Prepared by R Mcguire of Dames & Moore,Per 831129 Meeting Request + (ML20083J512)