Responds to NRC Re Violations Noted in IE Insp Repts 50-424/83-16 & 50-425/83-16.Violation Re Weld Radiography Disputed
ML20083J489
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/30/1983
From: Foster D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20083J472 List:
References
GN-263, NUDOCS 8401050264
Download: ML20083J489 (2)


Text

',

i

'I r

c.,

b 1

a L

e 3 Ei13 P 4 : 12 Georgia Power D 0 Foster

.f.

September 30, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 File:

X7BG10 101 Marietta Street Log:

GN-263 Atlanta, Georgia 30303

Reference:

50-424/83-16 50-425/83-16 Attention:

R.

C.

Lewis Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violation discussed in your inspection report 50-424/83-16 and 50-425/83-16.

We do not concur with the finding identified concerning "Pailure to Establish Adequate Radiography Procedure" nor do we concur with the interpretation of the ASME Boiler and Pressure Vessel Code, 1974 Edition through Summer 1975 Addenda (hereafter referred to as the " Code"), that the " area of interest", used primarily in Section V of the Code to define the area of a weld to be shown on a radiograph, includes the heat-affected zone.

Our position is based on the following information gathered by our code experts:

1.

Paragraph T-282 of Article 2,Section V of the Code gives the minimum requirements for radiography procedures.

This paragraph contains no requirement for including the heat affected zone in the area of interest and specifying this in the procedure.

2.

Paragraph UW-52 of Section VIII of the Code requires spot radiography of vessels that have butt-welded joints that are not radiographed for their full length.

UW-52 refers to paragraph UW-51 for standards relative to radiographic examination of welded joints.

Neither of these paragraphs require that the heat-affected zone be included in the area of interest.

Paragraph UW-51 requires that radiographs be examined in accordance with Article 2,Section V of the Code.

8401050264 831222 PDR ADOCK 05000424 a

PDR

United States Nuclear Regulatory Commission September 30, 1983 Page 2 3.

Appendix A of Section V of the Code gives the follow-ing definition:

Area of Interest - This includes the portion of the object in the radiograph that is to be interpreted.

4.

Code Interpretation III-82-27 dated April 9,

1983, File No. NI-81-162, reads:

Question:

What extent of area beyond the we]d metal is to be included in the radiographing of welds when required by NX-5200?

Reply:

The radiography requirement of NX-5200 is limited to the width of the weld metcl.

Since Section III of the Code is more restrictive than Sections V or VIII, we hold that this interpretation is also valid for those sections.

The Georgia Power Company is committed to meeting the require-ments of the Code in the examination of welds at Plant Vogtle.

While we do not deny that the heat-affected zone of a weld should l

be given proper consideration during welding inspections, it remains our position that failure to designate the heat-affected zone as part of the area of interest in radiography procedures and failure to maintain film density of 3.80 over the entire heat-affected zone of a radiograph do not constitute violations of the Code.

To l

further clarify this question, we have addressed the following l

question to the ASME Boiler and Pressure Vessel Code Committee for Section VIII:

To what extent of area beyond weld metal is to be included in the radiographing of welds when required by UW-52 and required for interpretation by UN-51(b), (1) through (4) ?

When a reply to this question is received, the Georgia Power Company will take whatever actions that are necessary to ensure we are in full compliance with Code requirements.

This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

Yo s tru y, j

a D.

O.

Fos er REF/DOF/cc xc:

U.

S.

Nuclear Regulatory Commission Attn:

Victor J.

Stello, Jr.,

Director Office of Inspection and Enforcement Washington, D.

C.

20555 xc:

R.

J.

Kelly D.

E.

Dutton J.

A.

Bailey L.

T.

Gucwa R.

E.

Conway W.

F.

Sanders O.

Batum M. Malcom G.

F.

Head R.

H.

Pinson H.

H.

Gregory III G.

Bockhold J.

T.

Beckham, Jr.

B.

M.

Guthrie R.

E.

Folker P.

D.

Rico D.

N.

MacLemore R.

A.

Thomas E.

D.

Groover J.

L.

Vota

_ _ _ _ _ _ _ _ _ _ _ _ _