Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000220/LER-1983-031-04, /04L-0:on 831102,differential Temp Outputs at 200 & 100 Ft Discovered Out of Calibr.Cause Unknown.Outputs Readjusted,Procedures Modified & Frequency of Testing Increased + (ML20082R390)
- 05000321/LER-1983-111-03, /03L-0:on 831105,during Scram,Operating Personnel Determined That RCIC Could Not Be Controlled Manually.Caused by Separated Soldered Joint on Manual Amplified Circuit Board.Joint Resoldered + (ML20082R399)
- AECM-83-0747, Responds to Re Potentially Reportable Deficiency Repts 80/56 & 82/13 Re Reactor Controls,Inc.No Changes to Original Repts Warranted + (ML20082R402)
- 05000259/LER-1983-065-03, /03L-0:on 831107,high Water Level Surveillance in Scram Discharge Tank Not Performed in Compliance W/Tech Spec Table 3.1.A.Caused by Failure to Include Surveillance Instruction in Master Schedule + (ML20082R404)
- 05000272/LER-1983-055-03, /03L-0:on 831110,RCS Unidentified Leakage Exceeded Tech Spec Limit.Caused by Change in Containment Fan Coil Unit Configuration & Speed.Unit Shut Down to Identify & Repair Leaks in Containment + (ML20082R406)
- ML20082R412 + (ML20082R412)
- SNRC-1831, Advises That Emergency Response Data Sys Final Rule Inapplicable to Facility Since possession-only License Issued on 910720.Util Will Not Establish Schedule for Implementation of Emergency Response Data Sys Program + (ML20082R441)
- ML20082R442 + (ML20082R442)
- TXX-4083, Forwards post-accident Sampling Sys Summary Procedure for Estimating Core Damage,Per NRC 830913 Request to Complete TMI Action Item II.B.3.Westinghouse Generic Procedure Scheduled for Completion by Feb 1984 + (ML20082R446)
- ML20082R453 + (ML20082R453)
- ML20082R457 + (ML20082R457)
- ML20082R460 + (ML20082R460)
- ML20082R461 + (ML20082R461)
- ML20082R466 + (ML20082R466)
- RBG-16-360, Interim Deficiency Rept DR-108 Re Bergen Paterson Supplied Pipe Support Components.Investigation Incomplete.Next Rept Will Be Provided by 831219 + (ML20082R467)
- ML20082R468 + (ML20082R468)
- 05000395/LER-1983-126-03, /03L-0:on 831105,during Installation of Electrical Panel Cover,Power Lead Shorted Out,Causing Plus/Minus Rate Trip & Hi Flux Trip on N-44.Caused by Wiring Routed Near Front of Panel.Shorted Lead Repaired + (ML20082R475)
- ML20082R482 + (ML20082R482)
- ML20082R502 + (ML20082R502)
- ML20082R505 + (ML20082R505)
- ML20082R506 + (ML20082R506)
- 05000272/LER-1983-050-03, /03L-0:on 831031,130-ft Elevation Airlock Interior Door Failed Surveillance Test & Declared Inoperable.Caused by Improperly Seated Seal.Personnel Will Be Trained in Proper Airlock Operation + (ML20082R507)
- ML20082R509 + (ML20082R509)
- ML20082R513 + (ML20082R513)
- ML20082R514 + (ML20082R514)
- ML20082R516 + (ML20082R516)
- ML20082R520 + (ML20082R520)
- 05000327/LER-1983-154-03, /03L-0:on 831106,waste Gas Decay Tanks J & H Discovered to Have High Oxygen Concentrations.Caused by Rupture of Boric Acid Evaporator Diaphragm B,Allowing Air to Enter Tank J + (ML20082R522)
- ML20082R523 + (ML20082R523)
- ML20082R526 + (ML20082R526)
- ML20082R535 + (ML20082R535)
- 05000318/LER-1983-061-03, /03L-0:on 831107,during Surveillance Test of ESF Actuation Sys Logic,Lpsi Pump 22 Could Not Be Restarted After Being Stopped on RAS Signal.Caused by Trip Latch Wipe Out of Adjustment + (ML20082R536)
- ML20082R553 + (ML20082R553)
- 05000289/LER-1983-044, Forwards LER 83-044/01T-1.Info Potentially Relevant to Plant Design & Procedures Phase of Proceeding.Svc List Encl + (ML20082R555)
- 0CAN128301, Clarifies 830415 Reponse to NUREG-0737,Suppl 1 Re Evacuation of Secondary Technical Support Ctr.Ctr Will Only Be Evacuated When Warranted for Protection of Personnel + (ML20082R556)
- 05000272/LER-1983-054-03, /03L-0:on 831112,intermediate Range Channel N35 High Flux Bistable Trip Did Not Occur When Power Reached 25%.Caused by Setpoint Drifting Out of Calibr.Channel Recalibr + (ML20082R562)
- ML20082R565 + (ML20082R565)
- ML20082R569 + (ML20082R569)
- ML20082R570 + (ML20082R570)
- 05000416/LER-1983-176-03, /03L-0:on 831031,flow from Reactor Water Cleanup Sys to Reactor Water Sample Station Cut Off for Maint, Preventing Continuous Recording of Reactor Coolant Conductivity.Caused by Procedural Error + (ML20082R577)
- 05000368/LER-1983-048-03, /03L-0:on 831114,no Response Observed on Startup Channel 1 of Nuclear Instrumentation When Fuel Assembly, Containing Neutron Source,Inserted Into Core.Caused by Problems in Mother Board.Board Replaced + (ML20082R579)
- ML20082R583 + (ML20082R583)
- 05000324/LER-1983-094-03, /03L-0:on 831102,control Rod 38-23 Did Not Have RTGB Position Indication at 12 & Control Rod 30-39 Did Not Have RTGB Position Indication at 04.Caused by Problems on Indication Reed Switch of Each Rod + (ML20082R586)
- 05000272/LER-1983-052-03, /03L-0:on 831104,containment Fan Coil Unit 11 Tripped While Starting in Fast Speed for Daily Surveillance. Caused by Shorted & Grounded Motor Stator Windings.Motor Replaced + (ML20082R589)
- 05000247/LER-1983-041-03, /03L-0:on 831029,following Maint Outage,Reactor Coolant Chemical Analysis Indicated Chloride Concentration of 200 Ppb.Caused by Unflushed Anion Demineralizer Placed in Svc.Chloride Concentration Restored + (ML20082R591)
- ML20082R592 + (ML20082R592)
- ML20082R593 + (ML20082R593)
- ML20082R594 + (ML20082R594)
- ML20082R609 + (ML20082R609)
- 05000293/LER-1995-003, :on 950324,manually Initiated RPS Scram Signal & Scram Occurred.Caused by Deliberate Movement of Reactor Mode Selector Switch from Run Position.Controller & Linkage Being Replaced + (ML20082R620)
- ML20082R625 + (ML20082R625)