Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080F798 + (ML20080F798)
- TXX-4105, Responds to NRC Requesting Util to Perform Major Study of All safety-related Mechanical Equipment Located in Areas of Potentially Harsh Environs.Request Unwarranted & Technically Unjustified.Meeting W/Nrc Requested + (ML20080F799)
- ML20080F801 + (ML20080F801)
- ML20080F802 + (ML20080F802)
- ML20080F804 + (ML20080F804)
- ML20080F805 + (ML20080F805)
- ML20080F808 + (ML20080F808)
- ML20080F809 + (ML20080F809)
- ML20080F811 + (ML20080F811)
- 05000364/LER-1994-004-01, :on 941225,reactor Tripped Due to Loss of Turbine DEHC Overspeed Protection.Root Cause Investigation Was Performed,Resulting in Replacement of Six Cards Associated W/Sehc Sys + (ML20080F813)
- ML20080F814 + (ML20080F814)
- ML20080F816 + (ML20080F816)
- ML20080F820 + (ML20080F820)
- 05000321/LER-1983-077-03, /03L-0:on 830815,P-1 Computer Programs Calculated Core Max Fraction of Limiting Power Density to Be 1.014 & Cmapr to Be 1.000 Contrary to Tech Spec Requirements.Caused by Inaccurate P-1 Base Distribution Program + (ML20080F821)
- ML20080F831 + (ML20080F831)
- 05000362/LER-1984-005, :on 840106,following Reactor Trip for Testing, RCS Sample Analysis Indicated That RCS Specific Activity Exceeded 1.0 Uci/G Dose Equivalent.Cause Indicative of Iodine Spiking Following Power Change + (ML20080F836)
- 05000362/LER-1984-002, :on 840107,penetration Bldg Airborne Iodine of Noble Gas Concentrations Increased Above Precautionary Level.Cause Under Investigation.Engineering Evaluation Will Determine Corrective Actions + (ML20080F844)
- ML20080F845 + (ML20080F845)
- ML20080F846 + (ML20080F846)
- ML20080F847 + (ML20080F847)
- ML20080F848 + (ML20080F848)
- ML20080F849 + (ML20080F849)
- ML20080F851 + (ML20080F851)
- ML20080F853 + (ML20080F853)
- ML20080F857 + (ML20080F857)
- ML20080F862 + (ML20080F862)
- ML20080F864 + (ML20080F864)
- ML20080F867 + (ML20080F867)
- ML20080F870 + (ML20080F870)
- 05000416/LER-1982-138-99, While Performing Maint Work on Control Room Floor Grid Seals & Duct Covers,Several Ducts Not Installed Due to Cables Extending Through Duct. Caused by Design Error + (ML20080F871)
- ML20080F878 + (ML20080F878)
- ML20080F889 + (ML20080F889)
- ML20080F893 + (ML20080F893)
- ML20080F899 + (ML20080F899)
- AECM-83-0547, Updated RO 83-033/1:on 830411,fire-rated Penetrations Opened to Implement Design Change Packages.Hourly Fire Watches Established within 1 H & Maintained for Duration of Maint.Completion Expected by 831015 + (ML20080F905)
- 0CAN088301, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-14 & 50-368/83-14.Corrective Actions:Plant Operating Procedure 1015.01 Revised to Clarify Methods for Locking T-handled Valves + (ML20080F907)
- ML20080F914 + (ML20080F914)
- ML20080F915 + (ML20080F915)
- AECM-83-0560, Updated RO 83-040/1:on 830424,fire-rated Penetrations,Listed in Encl,Opened to Implement Design Change Packages & Restored on Dates Listed.Last Fire Barrier Restored on 830906 + (ML20080F916)
- AECM-83-0544, RO 83-019/1:on 830317 & 19,several Fire Barriers in Control Bldg & Auxiliary Bldg Opened to Support Design Change Packages.Hourly Fire Watch Established.Penetrations Will Be Restored by 831015 + (ML20080F917)
- ML20080F921 + (ML20080F921)
- 0CAN028404, Forwards Endorsement 5 to Nelia Certificates N-48 & N-68 & Endorsement 5 to Maelu Certificates M-48 & M-68 + (ML20080F923)
- ML20080F925 + (ML20080F925)
- ML20080F926 + (ML20080F926)
- ML20080F935 + (ML20080F935)
- ML20080F936 + (ML20080F936)
- AECM-83-0576, RO 83-076/0:on 830817 & 26,control Room Ambient Air Temp Periodically Exceeded Area Temp Limit of Tech Specs.Caused by Small Leak Resulting in Low Freon in Available Control Room HVAC Subsystem B + (ML20080F938)
- ML20080F941 + (ML20080F941)
- ML20080F943 + (ML20080F943)
- ML20080F947 + (ML20080F947)
- ML20080F948 + (ML20080F948)