Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079A964 + (ML20079A964)
- ML20079A967 + (ML20079A967)
- 05000333/LER-1991-006-01, :on 910507,manual Reactor Shutdown Occurred Due to Inoperability of Both Low Pressure Coolant Injection Subsystems.Caused Mechancial Failure of One Valve in Each of Two Sys.Root Cause Investigation Started + (ML20079A971)
- 05000482/LER-1991-006, :on 910512,auxiliary Feedwater Actuation & Control Room Ventilation Isolation Occurred When Power Supply in ESF Actuation Sys Failed.Caused by Faulty 15 Volt Power Supply.Power Supply Replaced + (ML20079A974)
- 05000334/LER-1991-013, :on 910510,pressurizer Code Safety Valve Lift Setting Discovered Less than Tech Spec Limits.Caused by Failure of Valves to Lift within Setpoint.Beaver Valley Test Procedure Criteria Reevaluated + (ML20079A976)
- ML20079A979 + (ML20079A979)
- B13834, Application for Amend 47 to License NPF-49,modifying Tech Spec 4.6.4.2.b.4, Electric Hydrogen Recombiners, to Provide Variable Acceptance Criteria for Flow Testing Containment Pressures + (ML20079A999)
- ML20079B003 + (ML20079B003)
- 05000382/LER-1991-007-01, :on 910510,review of Calculation EC-E89-007 Revealed That Electronic Sensor Current Transformer Rating on 480-volt safety-related Bus Incorrect.Caused by Failure to Verify Amperage Rating.New Bus Installed + (ML20079B006)
- B15067, Application for Amend to License NPF-49,modifying SR 4.8.1.1.2.g.3 That Will Permit DG Full Load Rejection Tests to Be Performed at Realistic Plant Conditions Using Power Factor to Envelope Calculated Power Factor + (ML20079B013)
- 05000368/LER-1991-013-01, :on 910512,fire Watches Released from Inoperable Fire Barriers Prematurely.Caused by Inadequate Documentation Re Posting Requirements.Approval by Fire Protection Required Prior to Release in Future + (ML20079B017)
- DCL-91-152, Forwards Substitution Page for Change 3 to Rev 17 for Physical Security Plan,Submitted 901019.Encl Withheld (Ref 10CFR73.21) + (ML20079B022)
- BSEP-94-0517, Transmits 1993 Annual Rept Per 10CFR50.59(b)(2), for Brunswick Nuclear Plant + (ML20079B023)
- ML20079B029 + (ML20079B029)
- ML20079B032 + (ML20079B032)
- 05000333/LER-1994-009-01, :on 941129,partial Invalid Primary Containment Isolation as Result of Personnel Error During Electrical Bus Power Source Transfer.Operations Personnel Restored Sys to Normal in Accordance W/Plant Procedures + (ML20079B038)
- ML20079B046 + (ML20079B046)
- HL-4760, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/94-27 & 50-366/94-27.Corrective Actions: Event Was Investigated Per Requirements of Plant Administrative Control Procedure 10AC-MGR-004-0S + (ML20079B061)
- ML20079B063 + (ML20079B063)
- BSEP-94-0513, Forwards Brunswick Nuclear Plant Three-Yr Business Plan Performance Improvement Initiatives & Projects + (ML20079B077)
- ML20079B081 + (ML20079B081)
- ML20079B091 + (ML20079B091)
- ML20079B098 + (ML20079B098)
- ML20079B102 + (ML20079B102)
- 05000298/LER-1991-005, :on 910511,unplanned Startup of Diesel Generator Number 2 Occurred Due to Equipment Deficiency During Plant Startup.Caused by Insufficent Action of Breaker.Breaker Shimmed & Reinstalled + (ML20079B105)
- ML20079B106 + (ML20079B106)
- 05000457/LER-1991-002-12, :on 910510,excessive Containment Purge Valve Leakage Discovered During Local Leakage Rate Testing Causing Reactor Shutdown.Caused by Seal Degradation.Resilient Matl Seals Replaced + (ML20079B107)
- ML20079B112 + (ML20079B112)
- ML20079B113 + (ML20079B113)
- ML20079B116 + (ML20079B116)
- ML20079B117 + (ML20079B117)
- 05000338/LER-1991-011, :on 910511,source of Leakage Identified Between B Cold Leg Loop Stop Valve & Isolation Valve for 3/4 Inch Upper Disc Pressurization Line.Caused by High Cycle Fatigue. Action Statement of Tech Spec 3.4.6.2 Entered + (ML20079B119)
- ML20079B120 + (ML20079B120)
- ML20079B121 + (ML20079B121)
- 05000339/LER-1991-003-03, :on 910522,determined Surveillance Test on Four Safety Injection Sys Accumulator Nitrogen Sypply & Vent Valves Missed.Caused by Personnel Error.Affected Valves Successfully Tested + (ML20079B122)
- ML20079B124 + (ML20079B124)
- ML20079B128 + (ML20079B128)
- ML20079B129 + (ML20079B129)
- ML20079B134 + (ML20079B134)
- ML20079B135 + (ML20079B135)
- ML20079B137 + (ML20079B137)
- ML20079B142 + (ML20079B142)
- ML20079B145 + (ML20079B145)
- ML20079B147 + (ML20079B147)
- ML20079B149 + (ML20079B149)
- ML20079B150 + (ML20079B150)
- ML20079B152 + (ML20079B152)
- ML20079B153 + (ML20079B153)
- BSEP-94-0521, Notifies NRC of Completion of Activities Associated W/Action 1 of GL 94-02, Long-Term Solutions & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Bwr + (ML20079B154)
- ML20079B155 + (ML20079B155)
- ML20079B157 + (ML20079B157)