MONTHYEARML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re RT Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20217A8181997-09-16016 September 1997 Application for Amends to Licenses NPF-10 & NPF-15.Amends Consist of Proposed TS Changes to TS 3.4.13,5.5.2.11,5.7.2 & Affected Bases,Allowing SG Tube Repair Using Asea Brown/Boveri/Combusting Engineering Leak Tight Sleeving ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS ML20141B4421997-06-18018 June 1997 Applications 168 & 154 for Amends to Licenses NPF-10 & NPF-15,respectively,requesting Revision to TS 3.8.1, AC Sources - Operating & Applicable Bases ML20137V2251997-04-15015 April 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Rev of SR 3.8.1.8 & Applicable Bases to TS 3.8.1, AC Sources - Operating. Proposed Change Allows Credit Overlap Testing ML20134P9841997-02-21021 February 1997 Application for Amend to License NPF-15,which Would Clarify in Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation ML20138L1011997-02-18018 February 1997 Application for Amend to License NPF-15,to Defer Implementation of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation, for 30 Subgroup Relays Until Next Refueling Outage on Songs,Unit 3 ML20134J6921997-02-0707 February 1997 Application for Amend to License NPF-15,consisting of PCN-479,revising TS SR 3.1.5.4, CEA Alignment ML20134A9861997-01-24024 January 1997 Application for Amends to Licenses NPF-10 & NPF-15,to Revise SR 3.8.1.9 to TS 3.8.1, AC Sources - Operating, Which Will More Accurately Reflect Safety Analysis Conditions ML20133G9061997-01-14014 January 1997 Application for Amends to License NPF-15,requesting Rev to TSs 3.8.1.14 & 3.8.1.15, AC Sources - Operating, Surveillance Requirements ML20128P3441996-10-11011 October 1996 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Change to Reinstate Provisions of SONGS Unit 2 & 3 TS Revised as Part of NRC Amendment 127 & 116 ML20117K9851996-08-30030 August 1996 Application for Amends 153 & 137 to Licenses NPF-10 & NPF-15,respectively,clarifying Figures 3.7.18-1 & 3.7.18-2 by Adding Line at 4.8 Weight % Initial U-235 Enrichment to Show Acceptable Zone of Operation Ends Maximum 4.8 W/O ML20116C6741996-07-29029 July 1996 Application for Amends 146 & 130 to Licenses NPF-10 & NPF-15 Consisting of Change Request 443,permitting Increase in Licensed Storage Capacity of Spent Fuel Pools,By Allowing Fuel to Be Consolidated After Required Time in SFP ML20113C2541996-06-25025 June 1996 Application for Amends 159 & 143 to Licenses NPF-10 & NPF-15 Revising TS 3.3.11, Pami, & TS 5.5.2.13, Diesel Fuel Oil Testing Program ML20112D4511996-06-0303 June 1996 Applications 159 & 143 for Amend to Licenses NPF-10 & NPF-15,consisting of Change Number 466,reinstating Provisions of Current SONGS TS Revised as Part of NRC Amends 127 & 116 ML20117J8371996-05-30030 May 1996 Applications for Amends 161 & 145 to Licenses NPF-10 & NPF-15,consisting of Change Number 468,requesting Changes to SR 3.6.1.1,SR 3.6.2.1 & SR 3.6.3.6 Which Allows Implementation of Option B to 10CFR50,App J ML20117J4431996-05-29029 May 1996 Amends 162 & 146 to Licenses NPF-10 & NPF-15,respectively, Consisting of Proposed Change Number 465,changing Unit 2 Amend 127 & Unit 3 Amend 116 Approved TS 3.5.1, Safety Injection Tanks ML20112D0231996-05-29029 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of PCN-454,revising Acceptance Criteria for Agastat Time Delay Relays Used in ESF Load Sequencer in TS 3.8.1.18, A.C. Sources - Operating ML20117D7991996-05-0909 May 1996 Amend Applications 160 & 144 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 467,adding Section 5.5.2.14, Barrier Control Program ML20108E3251996-05-0808 May 1996 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Change Number 458,revising Unit 2 Amend 127 & Unit 3 Amend 116 Changing TS 3.9.4 & 3.9.5 1999-08-11
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217B4401999-10-0707 October 1999 Amends 159 & 150 to Licenses NPF-10 & NPF-15,revising License Condition 2.C(19) for Unit 2 & 2.C(17)d for Unit 3 & TS 3.3.11 Re Hydrogen Monitoring Requirements ML20211R0411999-09-0909 September 1999 Amends 158 & 149 to Licenses NPF-10 & NPF-15,respectively, Modifying TS Surveillance Requirements Re Diesel Generator Testing ML20212A2321999-09-0707 September 1999 Amends 157 & 148 to Licenses NPF-10 & NPF-15,respectively, Consisting of Changes to TS 3.3.5, ESFAS Instrumentation, in Response to 981231 Application & Suppl ML20211E9281999-08-19019 August 1999 Amends 156 & 147 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.4.10, Pressurizer Safety Valves, to Increase as-found Pressurizer Safety Valve Setpoint Tolerances ML20211F1921999-08-19019 August 1999 Amends 155 & 146 to Licenses NPF-10 & NPF-15,respectively, Changing TS in Response to Application ML20210P5931999-08-11011 August 1999 Amend Application Number 189 for License NPF-10 & Amend Application Number 174 for License NPF-15,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098 ML20209G3331999-07-12012 July 1999 Amends 154 & 145 to Licenses NPF-10 & NPF-15,respectively, Authorizing Changes to UFSAR to Permit Installation of Digital Radiation Monitors for Both Containment Purge Isolation & Control Room Isolation Signals ML20195E5061999-06-0808 June 1999 Application for Amends to Licenses NPF-10 & NPF-15, Consisting of Proposed Change Number 495,which Revises TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A0151999-05-13013 May 1999 Amends 153 & 144 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Allow Refueling Operation with 20 Ft of Water Level in Refueling Cavity for Many Operating Conditions & at 12 Ft of Water Level for Certain Conditions ML20205T2841999-04-24024 April 1999 Amend Application 187 to License NPF-10,consisting of Proposed Change Number 504,requesting NRC Approval to Repair Degraded But Operable Shutdown Cooling Sys Check Valves at Unit 2 in Normal Operation (Mode 1) ML20205N2601999-04-0909 April 1999 Amends 151 & 143 to Licenses NPF-10 & NPF-15,respectively, Revise SR 3.8.1.9 to TS 3.8.1, AC Sources-Operating, to More Accurately Reflect Test Conditions & Plant Design Requirements ML20204B9731999-03-12012 March 1999 Application for Amends to Licenses DPR-13,NPF-1 & NPF-15, Revising SONGS Physical Security Plan & Safeguards Contingency Plan Tactical Response Plan for Defending Site Against Safeguards Emergencies.Details of Amend Withheld ML20203J1771999-02-12012 February 1999 Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively, Modifying TS to Reduce Min RCS Cold Leg Temp,Convert Specified RCS Flow from Mass Units to Volumetric Units & Eliminate Max RCS Flow Rate Limit from TS ML20199D0331999-01-13013 January 1999 Suppl 1 to Amend Applications 157 & 141 to Licenses NPF-10 & NPF-15,respectively,restricting Required Action Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2761999-01-11011 January 1999 Amends Applications 185 & 171 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change Number 499,requesting Rev to TS 3.7.6 & Associated Bases to Increase Required Water Volume in CST T-120 from 280,000 to 360,000 Gallons ML20198L6131998-12-31031 December 1998 Amend Applications 184 & 170 to Licenses NPF-10 & NPF-15, Consisting of Proposed Change 501,requesting Rev of TS 3.3.5, ESFAS Instrumentation ML20198G3741998-12-22022 December 1998 Proposed TS Change Number 489 to Amend Applications 176 & 162 to Licenses NPF-10 & NPF-15,changing TS 5.5.2.11, SG Tube Surveillance Program ML20198H5151998-12-21021 December 1998 Amends 146 & 138 to Licenses NPF-10 & NPF-15,respectively, Revising Licensing Basis to Incorporate New Turbine Missile Protection Calculation Methodology ML20206N6141998-12-16016 December 1998 Amends 145 & 137 to Licenses NPF-10 & NPF-15,respectively, Revising Reference for Obtaining Thyroid Dose Conversion Factors Used in Definition of Dose Equivalent I-131 in TS Section 1.1, Definitions, for Plant ML20196J1681998-12-0808 December 1998 PCN-493 to Amends 183 & 169 to Licenses NPF-10 & NPF-15, Revising Units 2 & 3 Tech Specs 3.4.10, Pressurizer Safety Valves, Consistent with Certain UFSAR Chapter 15 Events Recently Reanalyzed ML20195J8961998-11-23023 November 1998 Amends 182 & 168 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Spec Change Number 498,revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9461998-11-23023 November 1998 Amends 178 & 164 to Licenses NPF-10 & NPF-15,consisting of Proposed Tech Specs Change Number (PCN-494),revising UFSAR Pages Necessary to Identify Programs Which Govern Test Intervals for Turbine ML20155B9511998-10-26026 October 1998 Amends 143 & 134 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Eliminate Ref to Shutdown Cooling Sys Isolation Bypass Valve Inverters ML20155B8631998-10-20020 October 1998 Application for Amends to Licenses NPF-10 & NPF-15, Respectively.Proposed Change Number 485 Adds SR to TS 3.3.9, CR Isolation Signal ML20154B9331998-09-25025 September 1998 Amend 142 to License NPF-10,revising TS to Change Operative Parameter for Setting & Removing Operating Bypass Bistables. Operative Parameter in TS Changed from Thermal Power to Logarithmic Power ML20153G7471998-09-22022 September 1998 Amends 181 & 167 to Licenses NPF-10 & NPF-15,respectively, Revising TS 3.3.1, RPS Instrumentation - Operating, Re RT Operating Bypass Removal Process Variable ML20151W6751998-09-10010 September 1998 Application for Amends 180 & 166 to Licenses NPF-10 & NPF-15,eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Condition 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6521998-09-0404 September 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising TS 3.4.10 by Increasing as-found Psv Setpoint Tolerances ML20239A1401998-08-26026 August 1998 Amends 140 & 132 to Licenses NPF-10 & NPF-15,respectively, Allowing Sleeving of SG Tubes W/Sleeves Designed by Vendor, ABB-CE ML20236S6221998-07-22022 July 1998 Suppl 2 to Applications for Amend to Licenses NPF-10 & NPF-15,revising TS 3.8.1 by Extending Offsite Circuit Completion Time from 72 Hr & 6 Days from Discovery of Failure to Meet LCO ML20249B4271998-06-19019 June 1998 Application for Amends to Licenses NPF-10 & NPF-15,reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels & Eliminating Max RCS Flow Rate Limit ML20249C7331998-06-19019 June 1998 Amends 139 & 131 to Licenses NPF-10 & NPF-15,respectively, Modifying TSs to Extend Allowed Outage Times for Single Inoperable SIT from 1 H to 24 H ML20249A6511998-06-12012 June 1998 Application for Amends 178 & 164 to Licenses DPR-10 & DPR-15,revising Turbine Missile Protection Calculation Methodology,Per UFSAR Section,3.5, Missile Protection. Rev 1 to GEC-Alsthom Analysis Rept Encl.Subj Rept Withheld ML20216B6051998-05-11011 May 1998 Suppl 1 to Application for Amends 161 & 145 to Licenses NPF-10 & NPF-15,respectively,requesting Changes to Surveillance Requirements (Srs) 3.6.1.1,3.6.2.1 & 3.6.3.6 & Creating New TS 5.5.2.14 ML20216B4031998-05-0707 May 1998 Applications for Amend to Licenses NPF-10 & NPF-15,revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8391998-04-0606 April 1998 Application for Amends to Licenses NPF-10 & NPF-15,revising Containment Isolation Valves Completion Times ML20216B9991998-03-0606 March 1998 Application for Amends 175 & 161 to Licenses NPF-10 & Proposed Change 490,eliminating Ref to Inverters in TS 3.4.12.1 ML20199K6371998-01-0909 January 1998 Corrected Suppl 1 to Application for Amends 152 & 136 to Licenses NPF-10 & NPF-15,respectively ML20198H8381998-01-0909 January 1998 Suppl 1 to Application for Amends 151 & 135 to Licenses NPF-10 & NPF-15,revising TS 3.5.2, ECCS-Operating, to Extend Allowed Outage Time from 72 H to 7 Days for Single Low Pressure Safety Injection Train ML20198H6651998-01-0909 January 1998 Suppl 1 to Application to Amends 152 & 136 to Licenses NPF-10 & NPF-15,revising TS 3.5.1, Safety Injection Tanks, to Extend,In General,Completion Time for Single Inoperable Safety Injection Tank from 1 H to 24 H ML20198H7441998-01-0909 January 1998 Suppl 1 to Application for Amends 150 & 134 to Licenses NPF-10 & NPF-15,revising TS 3.8.1, AC Sources - Operating, to Extend Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days ML20198E5941998-01-0505 January 1998 Proposed Change Number 482 to Application for Amends 174 & 160 to Licenses NPF-10 & NPF-15.Amends Revise TS 3.7.5, AFW Sys & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Shutdowns & Testing ML20197C7001997-12-19019 December 1997 Application for Amends to Licenses NPF-10 & NPF-15,reducing Pressurizer Water Level Required for Operability to Be Consistent W/Certain Updated FSAR Chapter 15 Events Which Were Recently Reanalyzed ML20198A2351997-12-16016 December 1997 Amends 138 & 130 to Licenses NPF-10 & NPF-15,respectively, Deleting Physical Protection Program Reporting Requirement from License Condition 2.G & Clarifying License Condition 2.E ML20202J1051997-12-0303 December 1997 Amends 137 & 129 to Licenses NPF-10 & NPF-15,respectively, Deleting License Condition 2.C(26) for Unit 2 & Condtion 2.C(27) for Unit 3 ML20199H9441997-11-25025 November 1997 Supplemental Application for Amend to Licenses NPF-10 & NPF-15,respectively,revising License Condition 2G to Replace Region V W/Region IV ML20199C6191997-11-14014 November 1997 Suppl 1 to Application for Amends 138 & 122 to Licenses NPF-10 & NPF-15,revising Ufsar,Section 3.5 to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20217J9491997-10-17017 October 1997 Application for Amends to Licenses NPF-10 & NPF-15, Requesting Permission of Radiation Monitoring Sys Upgrade ML20217A8181997-09-16016 September 1997 Application for Amends to Licenses NPF-10 & NPF-15.Amends Consist of Proposed TS Changes to TS 3.4.13,5.5.2.11,5.7.2 & Affected Bases,Allowing SG Tube Repair Using Asea Brown/Boveri/Combusting Engineering Leak Tight Sleeving ML20148R3751997-06-30030 June 1997 Applications 165 & 149 to Licenses NPF-10 & NPF-15, Consisting of Proposed TS Change NPF-10/15-475 (PCN-475),to Delete SONGS Unit 2 License Condition 2.C.(19)b & Revise SONGS Units 2 & 3 TS 1999-09-09
[Table view] |
Text
<;G' ns Southem Calibmia Edison Company 23 PARMER STREET BRVINE CALIFORNIA 92768
" '* * * " ",;,," f ',," * "' "
January 3, 1995
/,7/[.I'.".*o U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.20555 Gentlemen:
Subject:
Docket Numbers 50-361 and 50-362 Amendment Application Numbers 137 and 121 Supplement 3 Technical Specification Improvement Program San Onofre Nuclear Generating Station, Units 2 and 3 Enclosed is Supplement 3 to Amendment Application No. 137 and Amendment Application No.121 to Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively. The amer.d...e:1t applications, which were submitted December 30, 1993, consist of Proposed Change Number NPF-10/15-299 (PCN-299) for SONGS Units 2 and 3.
Supplement 3 consists primarily of resolution of comments made during the Proof and Review Meeting held September 12 and 13,1994. Additionally, Supplement 3 includes a description of changes, with the following attachments:
Attachment A: Marked up Proposed Specifications for Unit 2 Attachment B: Marked up Proposed Specifications for Unit 3 Attachment C: Marked up Proposed Bases for Unit 2 Attachment D: Marked up Proposed Bases for Unit 3 In addition, Supplement 3 will remove changes proposed under PCN-405, PCN-418, and PCN-431 which had previously been incorporated into PCN-299. These changes will continue to be pursued as separate license amendment applications.
If you have any questions regarding these changes, please let me know.
Sincerely.
}\\IM } &)/
3 3
Enclosures i
t\\\\
esososoies ese m ADOCK 0500 g1 PDR P
fdL??
Document Control Desk cc:
L. J. Callan, Regional Administrator, NRC Region IV A. B. Beach, Director, Division of Reactor Projects, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 1, 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 C. I. Grimes, Chief, NRC Technical Specifications Branch T. R. Tjader, Review Coordinator - CEOG STS, NRC Technical i
Specifications Branch R. Rurski, Combustion Engineering Owners Group
Description of Changes (Revised Proposed SONGS Technical Specifications) l i
Marked-up ProDosed Specification:
Unit 2:
See Attachment "A" Unit 3:
See Attachment "B" l
Marked-up Proposed Bases:
l Unit 2:
See Attachment "C" l
Unit 3:
See Attachment "D" The following is a description of the changes to the proposed SONGS Technical Specifications included in Proposed Change Number NPF-10/15-299, including Supplements 1 and 2.
Section 1.0 1.
NUREG-1432 Example 1.3-3, of Section 1.3, Completion Times, will be reinstated in the proposed SONGS Technical Specifications. This example illustrates the " Flip-Flop" aspect of the revised standard technical specifications.
l The subsequent examples in Section 1.3 have been renumbered.
[
Section 2.0 Not affected.
Section 3.0 Not affected.
i Section 3.1 1.
Delete from LCO 3.1.10 "and capable cT Deing powered from an OPERABLE emergency power source" and delete ' -
- ondition A, "or capable of being powered from an OPERABLE emergency power source." Specification of an operable emergency power supply is not required with consideration of the definition of operability.
In addition, the. note modifying SR 3.1.10.1 is moved to precede the surveillance statement.
2.
In LCO 3.1.13, delete the extraneous line from the bottom of page 3.1-
- 28. Additionally, revise the wording of LC0 3.1.13.a to replace the phrase "does not exceed," with "less than or equal to," and in Condition A, replace the phrase " exceeds," with " greater than."
3.
Revise the title of LCO 3.1.14 from "Special Test Exceptions (STE) - Center CEA Misalignment and Regulating CEA Insertion i
Limits," to "Special Test Exceptions (STE) Reactivity Coefficient Testing." This is consistent with the proposed Bases changes submitted in Supplement 2.
Section 3.2 Not affected.
Section 3.3 1.
SR 3.3.1.12 has been revised consistent with the LCO.
LCO 3.3.1 requires operability of the " operating" bypasses.
SR 3.3.1.12 requires a channel functional test of the operating bypass.
2.
Table 3.3.1-1, " Reactor Protective Instrumentation," Note a, has been revised.
The "<" will be revised to "s."
3.
Table 3.3.1-1, " Reactor Protective Instrumentation," Note c, has been revised.
This note will be restored to indicate the pressurizer pressure setpoints identified in the current SONGS Units 2 and 3 Technical Specifications.
PCN-431 will address the proposed changes to the setpoints separately from PCN-299.
1 4.
Condition C and Condition D of LC0 3.3.2 have been revised consistent
[
with the LCO.
LC0 3.3.2 requires operability of the " operating" bypasses.
Conditions C and D specify the situation where one or two operating bypasses, respectively, are inoperable.
t 5.
SR 3.3.2.3 has been revised consistent with the LCO.
LC0 3.3.2 requires
[
operability of the " operating" bypasses.
SR 3.3.1.2.3 requires a channel functional test of the operating bypass.
6.
Similar to the above change, Table 3.3.5-1, " Engineered Safety Features Actuation System Instrumentation," Note b, has been revised. This note will also be restored to indicate the pressurizer pressure setpoints identified in the current SONGS Units 2 and 3 Technical Specifications.
PCN-431 will address the proposed changes to the setpoints separately from PCN-299.
7.
Not used. -.
i
.i 8.
The note modifying the Applicability of LCO 3.3.8 has been clarified.
The note will be revised to state " appropriate" rather than "at least one" isolation device.
An editorial correction will also be made to align the word
" containment" with the rest of the Applicability statement.
9.
This change returns the particulate / iodine channels back to proposed LC0 l
3.3.9.
i l
PCN-405 is the request to delete the particulate / iodine channels from the Control Room Isolation Signal.
t 10.
A typographical error will be corrected in Action A.2 of LCO 3.3.13.
I The referenced surveillance requirements are currently misordered.
Section 3.4 1.
In LC0 3.4.1, "RCS DNB (Pressure, Temperature, and Flow) Limits," change f
the wording of the LC0 3.4.1.b statement to:
"1.
For THERMAL POWER less than or equal to 30% RTP, 522*F s T e
s 558'F 2.
For THERMAL POWER less than 70% RTP and greater than 30%
RTP, 535'F s T, s 558'F 3.
For THERMAL POWER greater than or equal to 70% RTP, 544*F s i
T, s 558'F. "
j This change ir.corporates revisions made to the total loop uncertainties calculations for these instruments.
2.
In LC0 3.4.1, "RCS DNB (Pressure, Temperature, and Flow) Limits," change the wording of the surveillance requirement SR 3.4.1.2 to:
l
" Verify RCS cold leg temperature:
)
1.
For THERMAL POWER less than or equal to 30% RTP, 522*F s T, s 558'F i
2.
For THERMAL POWER less than 70% RTP and greater than 30%
RTP, 535* F s T, s 558'F 3.
For THERMAL POWER greater than or equal to 70% RTP, 544*F s T s 558'F.
c This change incorporates revisions made to the total loop uncertainties calculations for these instruments. __
i 3.
In LC0 3.4.1, "RCS DNB (Pressure, Temperature, and Flow) Limits," change the wording of the LC0 3.4.1.c statement to "RCS total flow rate a 148E6 lbm/hr and s 177.6E6 lbm/hr." This change is made per NRC request to strictly adhere to the NUREG-1432.
4.
In LC0 3.4.1, "RCS DNB (Pressure, Temperature, and Flow) Limits," change the wording of the surveillance requirements SR 3.4.1.3 statement to
" Verify RCS total flow rate a 148E6 lbm/hr and 5 177.6E6 lbm/hr." This change is made per NRC request to strictly adhere to NUREG-1432.
5.
In LC0 3.4.2, "RCS Minimum Temperature for Criticality," change the temperature value in LC0 3.4.2 to "522*F."
Also, the temperature value in the SR 3.4.2.1 was changed to "522aF."
The Applicability will be changed to " Mode 1, THERMAL POWER 5 30% RTP and T, < 535aF, and."
This change incorporates revisions made to the total loop uncertainties calculations for these instruments.
6.
In LC0 3.4.15, "RCS Leak Detection Instrumentation," in the Required Action column, include the new Required Action A.1 " Perform SR 3.4.13.1."
The Completion Time for this Required Action A.1 is "Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />." The existing Required Action A.1 will be renumbered to "A.2."
A logical connector "AND" will be inserted in the Required Action column between Required Action A.1 and Required Action A.2.
This change is made for consistency with NUREG-1432.
Section 3.5 1.
Not affected.
Section 3.6 1.
An exception to the requirements of LC0 3.0.4 is currently in the SONGS Specifications and this exception is carried forth here in LC0 3.6.2.
However, as discussed with Mr. T. R. Tjader the note has been moved to SR 3.c.2.2 where it is more appropriately located. Therefore, the note would now read, "SR 3.0.4 is not applicable."
Due to the addition of the note, editorial changes are made to the existing note.
2.
An exception to the requirements of LC0 3.0.4 is currently in the SONGS Specifications and this exception is carried forth here in LC0 3.6.2.
However, as discussed with Mr. T. R. Tjader the note has been moved to SRs 3.6.3.3, 3.6.3.4, and 3.6.3.7 where it is more appropriately located.
Therefore, the note would now read, "SR 3.0.4 is n-t applicable."
3.
A number of editorial corrections are also made. They are as follows:
Spelling out LCS on first usage, Deleting the number "1" from the note modifying the SRs, and correcting a typographical error in the frequency column of SR 3.6.3.7.
4.
As a result of reinstating NUREG-1432 Example 1.3-3, of Section 1.3,
" Completion Times," LC0 3.6.6.1, " Containment Spray and Cooling System,"
has been revised. As previously discussed, Example 1.3-3 addresses the
" Flip-Flop" aspect of the Technical Specifications.
Specifically, the Completion Time for Action A.1 and Action C.1 would include the additional completion time of "AND 10 days from discovery of failure to meet the LC0."
This Completion Time is consistent with NUREG-1432.
Section 3.7 1.
In LC0 3.7.1, " Main Steam Safety Valves (MSSVs)," change the wording of the LCO statement to, "The MSSVs shall be OPERABLE as specified in Table 3.7.1-1 and Table 3.7.1-2."
This change is consistent with NUREG-1432, versus use of the SAVOR Licensee Controlled Specification.
The inclusion of Table 3.7.1-1 and Table 3.7.1-2, restores information pertaining to the maximum allowable linear power level--high trip setpoints versus operable MSSVs, and the MSSVs and their setpoints.
2.
In LC0 3.7.1, " Main Steam Safety Valves (MSSVs)," change the words in Required Action A.1 from "the SAVOR" to " Table 3.7.1-1."
Also, delete the words "or equal to" from the Required Action A.1 statement. This incorporates a comment from the NRC Review Coordinator.
3.
In LC0 3.7.1, " Main Steam Safety Valves (MSSVs)," change the words in Required Action A.2 from "as specified in the SAVOR" to "in accordance with Table 3.7.1-1."
This change is cons,istent with:
restoration of this specification to NUREG 1432, ver sus use of -the SAVOR Licensee Controlled Specification.
The following mt:difications were made to the NUREG version during the September 12-13 Proof and Review Meeting:
In LC0 3.7.1, " Main Steam Safety Valves (MSSVs)," delete the column " Maximum Allowable Steady State Power Level (% RTP)" from the Table 3.7.1-1, " Maximum Allowable Linear Power Level-High Trip 1
Setpoints versus OPERABLE MSSVs." The current San Onofre Technical Specifications do not include this data; this power reduction is controlled in accordance with plant specific 1
instructions. l l
In LC0 3.7.1, " Main Steam Safety Valves'(MSSVs)," delete the column " Allowable Range" from the Table 3.7.1-2, " Main Steam Safety Valves Lift Settings." The current San Onofre Technical Specifications do not include this data; this is redundant with specification of the setpoint and tolerances.
4.
In LC0 3.7.1, " Main Steam Safety Valves (MSSVs)," change the wording of SR 3.7.1.1 to " Verify each required MSSV lift setpoint within limits per Table 3.7.1-2 in accordance with the inservice testing program." This is an editorial change only.
5.
In LC0 3.7.4, " Atmospheric Dump Valves (ADV)," change the words of Condition C to " Backup nitrogen gas supply system capacity s 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for one or more required ADV(s)." This incorporates a comment from the NRC Review Coordinator.
j 6.
In LC0 3.7.4, " Atmospheric Dum) Valves (ADV)," change the words of Required Action C to " Restore )ackup nitrogen gas supply system capacity for one or more required ADV(s)." This incorporates a comment from the NRC Review Coordinator.
7.
In LC0 3.7.5, " Auxiliary Feedwater (AFW) System," insert the words "AND 10 days from discovery of failure to meet the LC0" in the Completion Time statements for Condition A and Condition B.
This change restores the " flip-flop" aspect of NUREG-1432.
8.
Delete LC0 3.7.7.1, " Component Cooling Water (CCW) Safety Related Makeup System," from the proposed SONGS Units 2 and 3 Technical Specifications.
Substitute the deleted pages with pages with the statement " Deleted i
Intentionally."
PCN-418 will address the proposed addition of this; LCO separately from PCN-299.
9.
Surveillance Requirements 3.7.2.1 and 3.7.3.1 are being revised. The words, "...on an actual or simulated actuation signal," should be deleted. These test requirements do not require actuating valve closure from an actual or simulated actuation signal.
SONGS Units 2 and 3 existing Surveillance Requirement 4.7.1.5 specifies that "Each main steam isolation valve shall be demonstrated OPERABLE by verifying full closure within 8.0 seconds when tested pursuant to Specification 4.0.5."
The proposed change described above is consistent with SONGS requirements.
10.
Surveillance Requirement 3.7.11.1 has been revised to delete the words "on a STAGGERED TEST BASIS," to be consistent with NUREG-1432 and the existing SONGS Technical Specifications.
j '
t s
Section 3.8 1.
In the Actions for LC0 3.8.1, "AC Sources-Operating," add the Second Completion Time for Required Actions A.2 and B.4.
This change makes the Completion Times consistent with NUREG-1432.
2.
In the Conditions for LC0 3.8.7 (For Unit 3 only), change Condition "C,"
as submitted in Supplement 2, to Condition "B."
Additionally, in the same Condition for Unit 2 only, restore the letter "B" which was inadvertently deleted in supplement 2.
These changes correct editorial errors.
3.
In LC0 3.8.8, change " Inverters" to " Required inverters." This change is in response to the September 12-13, 1994 NRC proof and review comment.
4.
In Condition A for LC0 3.8.9, add the second Completion Time for Required Action A.I.
This change makes the Completion Times consistent 3
with NUREG-1432.
5.
In Condition B for LC0 3.8.9, change "One AC vital bus inoperable" to "One or more AC vital bus inoperable." This change is in response to the September 12-13, 1994 NRC proof and review comment. Add the Second Completion Time for Required Action B.1.
This change makes the Completion Times consistent with NUREG-1432.
6.
In Condition C for LC0 3.8.9, change "One DC electrical power distribution subsystem inoperable" to "One or more DC electrical power distribution subsystem inoperable." This change is in response to the September 12-13, 1994 NRC proof and review comment. Add the Second Comp'etion Time for Required Action C.I.
This change makes the Completion Times consistent with NUREG-1432.
Section 3.9 1.
In LC0 3.9.3, " Containment Penetrations," modify the wording of LC0 3.9.3.b.
The proposed LC0 3.9.3.b statement reads:
"b.
One door in each air lock closed
NOTE---------------------------------
Both doors of the containment personnel airlock may be open provided:
- a. one personnel airlock door is OPERABLE
- b. the plant is in MODE 6 or defueled configuration, and
- c. with 23 feet of water above the fuel.
__..._______..___...__________..____.___________________________..___a This change is made for clarity. -
2.
In LC0 3.9.4, " Shutdown Cooling (SDC) and Coolant Circulation-High Water Level," combine the two Notes in one box and number them sequentially.
This is an editorial change only.
Section 4.0 1.
In Section 4.2.1, " Fuel Assemblies," delete the bracket after the word i
" components" in the fourth sentence. This is an editorial change only, i
Section 5.0 1.
In Section 5.4, " Technical Specifications (TS) Bases Control," change the reference to the Code of Federal Regulation to "10 CFR 50.71.(e)."
This is a correction of a typographical error.
2.
In Section 5.7.2, "Special Reports," include the paragraph 5.7.2.a concerning preparation of the )ost-accident monitoring instrumentation inoperability report. Also, c1ange the alphanumeric numbering of the subsection 5.7.2.a to 5.7.2.b, subsection 5.7.2.b to 5.7.2.c.
This incorporates a comment from the NRC Review Coordinator.