Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078S889 + (ML20078S889)
- ML20078S892 + (ML20078S892)
- ML20078S902 + (ML20078S902)
- ML20078S903 + (ML20078S903)
- 05000282/LER-1994-012-01, :on 941202,unplanned Closure of Containment Isolation Valve Because Breaker Did Not Adequately Compensate for Increase in Ambient Temp.Standby Charging Pump Was Started Immediately + (ML20078S907)
- RBG-41123, Forwards Response to NRC follow-up to RAI Re GL 92-08, Requesting Addl Info for Section Ii.B, Important Barrier Parameters & Section Iii.B, Thermo-Lag Fire Barriers Outside Scope of NUMARC Program + (ML20078S915)
- ML20078S939 + (ML20078S939)
- ML20078S950 + (ML20078S950)
- ML20078S957 + (ML20078S957)
- ML20078S961 + (ML20078S961)
- ML20078S968 + (ML20078S968)
- 05000298/LER-1994-027, :on 941116,non-environmentally Qualified Relay, MS-REL-52XCP Discovered.Caused by Inadequate Procedure to Ensure Proper Identification & Classification of Component. Unqualified Relay MS-REL-52XCP Replaced + (ML20078S977)
- NG-94-4690, Forwards Correction to Notary Signature Date on Licensee Ltr to WT Russell on 941213 (NG-94-4401).Notary Dtd Incorrectly & Rectified on Attached Sheet + (ML20078S979)
- NG-94-4691, Forwards Correction to Notary Signature Date on Licensee Ltr to WT Russell on 941212 (NG-94-4452).Notary Dtd Incorrectly & Rectified on Attached Sheet + (ML20078S982)
- GO2-94-282, Forwards Rev 27 to Nuclear Plant 2 License NPF-21 WNP-2 Physical Security Plan.W/O Encl (Ref 10CFR73.21) + (ML20078T004)
- ML20078T047 + (ML20078T047)
- BSEP-94-0520, Forwards NUREG-0619 FW Nozzle & Safe End Exam Results & Engineering Evaluation Rept 94-0182, Unit 2 FW Sparger Evaluation Following Iviv Exams + (ML20078T054)
- ML20078T064 + (ML20078T064)
- ML20079A020 + (ML20079A020)
- ML20079A024 + (ML20079A024)
- ML20079A039 + (ML20079A039)
- ML20079A045 + (ML20079A045)
- ML20079A054 + (ML20079A054)
- ML20079A059 + (ML20079A059)
- ML20079A069 + (ML20079A069)
- ML20079A077 + (ML20079A077)
- ML20079A091 + (ML20079A091)
- ML20079A099 + (ML20079A099)
- ML20079A107 + (ML20079A107)
- ML20079A121 + (ML20079A121)
- ML20079A126 + (ML20079A126)
- ML20079A128 + (ML20079A128)
- ML20079A134 + (ML20079A134)
- ML20079A138 + (ML20079A138)
- ML20079A149 + (ML20079A149)
- ML20079A158 + (ML20079A158)
- ML20079A163 + (ML20079A163)
- RC-95-0046, Requests Discontinuation of Seismic Monitoring Network Around Plant,On Basis That Min Requirements of OL Condition 2.C (24) Have Been Satisfied + (ML20079A165)
- ML20079A166 + (ML20079A166)
- ML20079A178 + (ML20079A178)
- AECM-90-0179, Responds to NRC Re Violations Noted in Insp Rept 50-416/90-15.Corrective Actions:Procedure 02-S-01-5 Changed to Require Control Power Fuses & Fuse Replacements Be Recorded in Log Book + (ML20079A179)
- BECO-90-116, Submits Commitment to Change Procedure 1.2.1, Operations Review Committee, Per 900809 Proposed Amend to Tech Spec Section 6 + (ML20079A182)
- ML20079A185 + (ML20079A185)
- BECO-90-115, Responds to Generic Ltr 90-03 Re Vendor Interface for safety-related Components,Per 840427 & s.Vendor Program Based on Vendor Equipment Technical Info Program,Per Nuclear Util Task Action Committee Rept INPO 80-010 + (ML20079A188)
- ML20079A193 + (ML20079A193)
- ML20079A214 + (ML20079A214)
- ML20079A223 + (ML20079A223)
- ML20079A229 + (ML20079A229)
- ML20079A230 + (ML20079A230)
- ML20079A235 + (ML20079A235)
- ML20079A238 + (ML20079A238)