Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078L178 + (ML20078L178)
- ML20078L180 + (ML20078L180)
- 05000333/LER-1983-029-03, /03L-0:on 830829,hydraulic Snubber H12-94 (12-1-S-20) Failed to Lockup in Compression When Tested. Caused by Poppet Spring Lodged Between Compression Poppet & Seat.Modified Valve Assembly Installed + (ML20078L186)
- 05000278/LER-1983-009-01, /01T-0:on 830908,during Surveillance Testing W/One Diesel Generator Inoperable,Breaker Between Diesel Generator E-1 & Emergency Bus E-13 Failed to Close Manually.Cause Unknown.Breaker Tested Successfully + (ML20078L191)
- ML20078L198 + (ML20078L198)
- WO 20-0020, Response to NRC Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations + (ML20078L199)
- ML20078L202 + (ML20078L202)
- ML20078L204 + (ML20078L204)
- 05000458/LER-1994-028, :on 941028,manual Reactor Scram Occurred Due to Turbine Vibration.Caused by Temp Sensitive Rotor.Expanded Limitations Which MSRs Can Be Placed in or Removed from Svc to Allow Decrease in Temp Step Changes + (ML20078L213)
- TXX-4060, Forwards Affidavit of Svc of Amend 44 to FSAR + (ML20078L214)
- ML20078L215 + (ML20078L215)
- 05000318/LER-1983-048-03, /03L-0:on 830901,hydrogen Recombiner 21 Found Inoperable.Caused by Loose Hex Nut Allowing Terminals on Back of Potentiometer to Be Twisted & Pulled.Potentiometer Replaced + (ML20078L222)
- ML20078L235 + (ML20078L235)
- ML20078L245 + (ML20078L245)
- ML20078L262 + (ML20078L262)
- ML20078L263 + (ML20078L263)
- BVY-94-116, Forwards Annual Cashflow Statements for Plant & Nine Sponsor Companies for Yr 1994 + (ML20078L268)
- ML20078L276 + (ML20078L276)
- ML20078L281 + (ML20078L281)
- ML20078L295 + (ML20078L295)
- ML20078L303 + (ML20078L303)
- ML20078L308 + (ML20078L308)
- ML20078L325 + (ML20078L325)
- ML20078L328 + (ML20078L328)
- ML20078L329 + (ML20078L329)
- ML20078L336 + (ML20078L336)
- ML20078L337 + (ML20078L337)
- ML20078L340 + (ML20078L340)
- ML20078L343 + (ML20078L343)
- ML20078L369 + (ML20078L369)
- ML20078L379 + (ML20078L379)
- ML20078L380 + (ML20078L380)
- ML20078L385 + (ML20078L385)
- ML20078L386 + (ML20078L386)
- ML20078L394 + (ML20078L394)
- PY-CEI-NRR-1907, Forwards Color Transparencies from Aerial Remote Sensing Programs Conducted at Plant in 1987,1988,1990 & 1992 Per Section 4.2.2.1 of Environ Protection Plan,App B to License NPF-58 + (ML20078L395)
- ML20078L415 + (ML20078L415)
- BSEP-95-0014, Requests NRC Concurrence W/Cp&L Plans for Future Insps of FW Spargers for Bsep,Units 1 & 2.As Described in Encl,Cp&L Plans to Perform Visual Exam of FW Spargers in Lieu of Liquid Penetrant Testing Reqired by NRC + (ML20078L420)
- ML20078L432 + (ML20078L432)
- ML20078L438 + (ML20078L438)
- NG-94-4196, Confirms Completion of Operator Training in Response to Generic Ltr 94-02 + (ML20078L444)
- 05000237/LER-1983-066-03, /03L-0:on 830918,MSIV 2D 2.5 Closure Time Exceeded Tech Spec Requirement of 3 to 5 S.Caused by Timing Mechanism Out of Adjustment.Mechanism Adjusted + (ML20078L447)
- ML20078L448 + (ML20078L448)
- NRC-94-0122, Provides Addl Info Re Confirmatory Action Ltr on 931225 Turbine Event.List of Areas Covered by Turbine Sys Plant Walkdown Encl + (ML20078L450)
- NRC-94-0124, Comments on NRC SE of Fermi 2 Restart Action Plan Issues Closeout Per Confirmatory Action Ltr on 931225 Turbine Event + (ML20078L451)
- ML20078L454 + (ML20078L454)
- ML20078L456 + (ML20078L456)
- ML20078L466 + (ML20078L466)
- ML20078L470 + (ML20078L470)
- 05000282/LER-1994-009-01, :on 941029,design Basis Reconstitution Effort Uncovered Design Deficiency in Containment Isolation Function.Caused by Oversight During Original Plant Design. Procedures Revised + (ML20078L476)
- ML20078L478 + (ML20078L478)