- 05000370/LER-1983-001, Forwards LER 83-001/03L-0 + (ML20073D210)
- 05000327/LER-1983-038, Forwards LER 83-038/01T-0 + (ML20073D228)
- ML20073D230 + (ML20073D230)
- 05000370/LER-1983-001-03, /03L-0:on 830305,Train a of Control Area Ventilation Sys Inoperable for Approx 8 H.Caused by Scheduling Delays.Test Restarted & Successfully Completed + (ML20073D234)
- ML20073D238 + (ML20073D238)
- ML20073D254 + (ML20073D254)
- ML20073D262 + (ML20073D262)
- 05000327/LER-1983-038-01, /01T-0:on 830325,Nonconformance Rept SQNNEB8212 Reissued to Indicate That Diesel Generators Would Become Inoperable When Outside Temp Is Greater than 88 F. Ventilation in Diesel Generator Rooms Inadequate + (ML20073D272)
- 2CAN099402, Forwards Comparison of RCS Leak Detection to Reg Guide 1.45 in Support of Permanent Reactor Pressure Vessel Seal Plate Installation + (ML20073D285)
- ML20073D288 + (ML20073D288)
- AECM-83-0221, RO 83-016/O:on 830302,Fire Door 1A202 Blocked Open to Allow Routing of Supply Hose Used in Hydrostatic Test of RHR Sys. Hourly Firewatch Conducted for Event Duration.Fire Door Closed on 830314 + (ML20073D289)
- ML20073D300 + (ML20073D300)
- 05000321/LER-1983-032, Forwards LER 83-032/03L-0 + (ML20073D306)
- ML20073D307 + (ML20073D307)
- HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions + (ML20073D308)
- ML20073D311 + (ML20073D311)
- ML20073D323 + (ML20073D323)
- ML20073D325 + (ML20073D325)
- SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-87 + (ML20073D328)
- ML20073D330 + (ML20073D330)
- 05000321/LER-1983-032-03, /03L-0:on 830308,600-volt Motor Control Ctr 1R24-S001 Component 3A Tripped 1A Standby Gas Treatment Sys During Drywell Venting.Caused by Loose Wire Resulting in Blown Fuse in Sys Fan Starter Control Circuit + (ML20073D341)
- ML20073D345 + (ML20073D345)
- HL-4678, Requests Relief from Liquid PT Examination Requirements & Ultrasonic Examination Schedule Contained in NUREG-0619,as Modified by GL 88-11 + (ML20073D347)
- ML20073D350 + (ML20073D350)
- PY-CEI-NRR-1852, Forwards Changes to Emergency Response Data System Dpl for Perry Nuclear Power Plant,Unit 1 + (ML20073D353)
- ML20073D354 + (ML20073D354)
- HL-4698, Responds to Violations Noted in Insp Rept 50-321/96-16. Corrective Actions:Main Steam Line High Flow Isolation Analytical Limits Reviewed & Correct Limits Calculated + (ML20073D356)
- 0CAN099406, Forwards Summary of Four Resolved Commitments,Including Procurement Restrictions on Cardinal Industrial Products, Tagging Voltmeters to Require Operations Supervisor Approval Prior to Removal from Svc & Radioiodine Measurements + (ML20073D357)
- ML20073D367 + (ML20073D367)
- ML20073D371 + (ML20073D371)
- ML20073D376 + (ML20073D376)
- BSEP-83-1102, Ro:On 830221,fire Barrier Penetration Limiting Conditions for Operation 1-83-115 Issued to Permit Work on 20-ft Elevation of Svc Water Bldg Required for Installation of Plant Mod.Due to Work complexity,7-day Time Frame Exceeded + (ML20073D377)
- ML20073D383 + (ML20073D383)
- 05000259/LER-1983-015, Forwards LER 83-015/03L-0 + (ML20073D387)
- RC-94-0245, Forwards IST Relief Request NRR 940001,Suppl 1,per 940914 Telcon.Relief Request Pertains to Bolting Exams (VT-3) Following Bolted Connection Leakage Occurring During Sys Pressure Test + (ML20073D391)
- ML20073D393 + (ML20073D393)
- 05000296/LER-1983-019, Forwards LER 83-019/03L-0 + (ML20073D395)
- RC-94-0244, Forwards TS Pages Due to Discovery of Missing Page (Page 6-16a) from TS Change TSP 940003,Suppl 1 Request for Administrative Changes, + (ML20073D399)
- 05000259/LER-1983-015-03, /03L-0:on 830310,temp Switch TS-71-2L Operated at 2049F,exceeding Tech Spec Requirements.Caused by Temp Switch Calibr Drift.Switch Replaced,Functionally Tested & Returned to Svc + (ML20073D402)
- 05000254/LER-1994-008-07, :on 940820,unit 1 Reactor Was Manually Scrammed by Procedure to Achieve Shutdown Condition Required by Tss. Caused by Work Practices Associated W/Crimping Terminal Lug. Wire Terminal Lugs Were Replaced W/New Parts + (ML20073D403)
- ML20073D404 + (ML20073D404)
- ML20073D405 + (ML20073D405)
- ML20073D408 + (ML20073D408)
- ML20073D409 + (ML20073D409)
- ML20073D411 + (ML20073D411)
- 05000296/LER-1983-019-03, /03L-0:on 830312,while Performing Surveillance Instruction SI 4.3.C (Scram Timing),Control Rod Drive 38-31 Failed to Scram Upon Signal.Caused by O-ring on Valve Out of Position.Valve Rebuilt + (ML20073D413)
- ML20073D418 + (ML20073D418)
- ML20073D422 + (ML20073D422)
- 05000348/LER-1994-004, :on 940602,valve Actuator Spacer Bolts Found to Be of Incorrect Matl.Bolts of Correct Matl Installed in Actuator & Turbine Steam Admission Valve + (ML20073D424)