" Log # TXX 91150 4
File # 10010.2 3
3 Ref.
- 10CFR50,36 1UELECTRIC-Ap ri l.12, 1991 :
William J. Cabal. Jr.
Luccutive Vke hnidem I
Director, Office of Resource Management
~!
U. S. Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM: ELECTRIC. STATION-:(CPSES)-UNIT 1 DOCKET NO.-50 445 HONTHLY OPERATING REPORT FOR'HARCH 1991.
-Gentlemen:
Attached is the Monthly Operating Report for-March 1991 prepared and submitted-pursuant to Specification.6.9.1.5 of Appendix A (Technical 1 Specifications) to-
[
the Comanche Peak Unit 1 Steam Electric Station Operating. License, NPF-87..
1
~
-Sincerely, xW1111am,J. Cahill,EJri Byi CN)[
'l
,RogerID. Walker-Hanager of< Nuclear-Licensing-~
M slarp M Lochment=
c - Mr'. R. D. Hartin,- Region IV' Resident Inspectors, CPSES-(3)i Hr,LJ..W. Clifford.-NRR
.i
'.t I(
i-g;6 ge,,. 4 pg42ggg;[ogggg;3.
wa., so.g.m p,,,,,,,,,,, moi
fI i
Attachment to TXX.91150 l
1, Page 1 of 4 COMANCHE PEAK STEAM ELECTFilC STATION,~ UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO:
50-445 UNIT:
CPSES 1 DATE:
Acril 8.1991 COMPLETED BY:
G.W. Thatcher
. TELEPHONE:
817 897-8223-OPERATING STATUS 1.
Reporting Period: MARCH 1991 Gross hours in reporting period: 214 2.
Currently authorized power level (MWt): liL1. Max _ depend. capacity (MWe Net): 11.5r Design Electrical Rating (MWe. Net): 115D 3.
Power level to.which restricted (if any) (MWe Net): None 4.
Reasons for restriction (if any):
THIS MONTH-YRTO DATE CUMULATIVE 5.
Number of hours reactor was critical 445.3 1908.2 L
-4734.6 6.
Reactor reserve shutdown hours 298.7 351.8 624.7-7.
Hours generator on line 437.2 1787.7-4653.4 8.
Unit reserve shutdown hours 0
0
~0-9.
Gross thermal energy generated (MWH) 1,375,315
'5,689,547 13,846,475 10'.
Gross electrical energy generated (MWH) 459,846 1,907,386-4,572,38ts
- 11. Net electrical energy generated-(MWH) 434,571
< 1,823,178 4,336,692-
- 12. Reactor Service factor 59.9 83,7 85.5-
- 13. Reactor availability factor.
100 100:
96.8
- 14. Unit service factor 58.8 82.8 84.0
- 15. Unit availability factor 58.8
.82.8 84'0
- 16. -Unit capacity factor (Using MDC) 50.8 73.4 68.1
- 17. Unit capacity factor (Using Design MWe) 50.8 73.4 68.1
- 18. Unit forced outage rato 14.4-7.2 17.6
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duration of each): a) Maintenance /
. Surveillance, 910322; 6 weeks.
- 20. If shutdown at end of report period, estimated date of 'startup: 910504
- 21. Units in test status (prior to commercial operation):
ACHIEVED Commercial Operation 900813 Estimated
l e
g 4, Attachment to TXX 91150 Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL-DOCKETNO:
60-445 UNIT:-
CPSES 1-DATE:
Aotil 8.1991 COMPLETED BY:
G.W. Thatcher TELEPHONE:
817 897 8223 MONTH: MARCH 1991 DAY AVERAGE DAILY POWER LEVEL CAY
- AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net)u 1
1044 17 492-2 950 18 76 ~
3 1050 19 722 4
1050 20 162 4
5 1059 21 0
6 1065 22 0
i 7
1065 23 0-8 1062 24-0-
9 1062 25 0
l 10 1063 26 11 1065 27 -
0 12 1066 28 0
-13 1065
. 29
'O l
14 1062
= 30 0
l 15 1055 31 0
l 16 1017 i
(
y n
p y
+
d s
e
~ v
.w-
i.;_ Attachment to TXX 91150 Page 3 of 4
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH -
DOCKETNO:
50-445 UNIT:
CPSES 1 DATE:.
Antil 8.1991 COMPLETED BY:
G.W. Thatcher h
TELEPHONE:
817-897-8223 MONTH: MARCH 1991 3/1-0000 Unit started month in MODE 1.
3/17 1131 Reactor Trip, Unit entered MODE 3.
Reactor trip caused by operator error during surveillance testing.. LER 91 007 to follow.
3/18 0541 Unit entered MODE 2.
0735 Unit entered MODE 1.
~
3/20 0140 Steam generator chemistry at action level 3 due to high sodium, caused by tube failure in the main condenser. Began power reduction / shutdown to correct problem.
0653 Unit entered MODE 2.-
0728 Unit entered MODE 3.
l 1948 Unit entered MODE 4.
2310 Unit entered MODE 5.
3/28 2253 Loss of preferred power to safeguards bus' caused an auto start of train "A" l
diesel generator. (Parker breaker tripped) :LER 91012 to follow.
l 3/29 0020 Loss of preferred power to safeguards bus caused an auto start of. train."A" diesel generator. (Parker breaker tripped again) LER 91012 to follow.
l l.
3/31 2400 Unit ended month in MODE 5.
-j i
l I
. ~.. -.. -
. ~ ~
' Attachm::nt to TXX-91150
' Page 4 of 4 '
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO-50-445 UNIT:
CPSES1
'~
DATE:
__ Aori! 8.1991 COMPLETED BY:
G.W. Thatcher TELEPHONE:
817-897-8223 REPORT MONTH MARCH 1991 I-NETHODOF TYPE SHUTTINGDOWN Ff0RCED DURATION TI-EREACTOROR M
DATE SSCHEDUl FO (HOURS)
REASDN REDUCING POWER CORHEciiVE ACTIOFSCOMMENTS l
f-003 910317 F
,25.7
'G 3
Reactor Trip caused by personnel error.. See previous page. LER 91-OC7 to follow.
004 910320
'F 48.1 A
1 S.G. chernistry at action level 3 caused by condenser tube shear.'
005 910322 S
233 B/F 1
Planned outage.
I-i I-1)
FEASCN 2 ) METHOD
- A : EQUIPMENT FAILURE (EXPLAIN)
E.. OPERATORTRAINING ANDUCENSEEXAMINATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAM
' C: 'REFUEUNG G OPERATIONALERROR(EXPLAIN) 3: AUTOMATICSCRAM D: REGULATORYRESTRICTION H:. OTHER (EXPLAIN) 4: OTHER (EXPLAIN) l
-3
,