Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067A090 + (ML20067A090)
- ML20067A092 + (ML20067A092)
- ML20067A098 + (ML20067A098)
- ML20067A100 + (ML20067A100)
- ML20067A102 + (ML20067A102)
- ML20067A106 + (ML20067A106)
- ML20067A111 + (ML20067A111)
- ML20067A113 + (ML20067A113)
- ML20067A143 + (ML20067A143)
- ML20067A156 + (ML20067A156)
- ML20067A157 + (ML20067A157)
- ML20067A161 + (ML20067A161)
- ML20067A164 + (ML20067A164)
- ML20067A167 + (ML20067A167)
- ML20067A170 + (ML20067A170)
- ML20067A175 + (ML20067A175)
- 0CAN019103, Responds to Violations Noted in Insp Repts 50-313/90-38 & 50-368/90-38 & Forwards Payment of Civil Penalty in Amount of $50,000,per EA-90-175.Corrective Actions:Piping Joints & Threaded Connections Repaired + (ML20067A186)
- ML20067A187 + (ML20067A187)
- ML20067A223 + (ML20067A223)
- ML20067A224 + (ML20067A224)
- ML20067A228 + (ML20067A228)
- ML20067A231 + (ML20067A231)
- ML20067A242 + (ML20067A242)
- ML20067A250 + (ML20067A250)
- ML20067A253 + (ML20067A253)
- ML20067A254 + (ML20067A254)
- ML20067A258 + (ML20067A258)
- LIC-94-0037, Forwards Reactor Containment Building Integrated Leakage Rate Test Rept,Nov 1993,Sixth Periodic Test for Fort Calhoun Station Unit 1 + (ML20067A259)
- ML20067A264 + (ML20067A264)
- 05000325/LER-1994-002-01, :on 940117,common Control Bldg Heating Ventilation & Air Conditioning Air Conditioners Tripped. Caused by Gradual Decrease in Refrigerant Charge Pressure During Yrs of Svc.Pressure Range Established + (ML20067A269)
- ML20067A270 + (ML20067A270)
- ML20067A271 + (ML20067A271)
- ML20067A275 + (ML20067A275)
- 05000278/LER-1994-001, :on 940124,HPCI Sys Declared Inoperable During Performance of Quarterly Surveillance Test.Caused by Leak on HPCI Sys Hydraulic Control Line.Hydraulic Control Line Repaired & HPCI Sys Tested + (ML20067A280)
- ML20067A281 + (ML20067A281)
- ML20067A283 + (ML20067A283)
- ML20067A292 + (ML20067A292)
- ML20067A294 + (ML20067A294)
- ML20067A298 + (ML20067A298)
- ML20067A299 + (ML20067A299)
- ML20067A304 + (ML20067A304)
- ML20067A309 + (ML20067A309)
- ML20067A316 + (ML20067A316)
- 05000414/LER-1991-002, :on 910106,work Completed on Valve 2NM-197B & Valve Declared Operable Although Surveillance Expired on 901218.Caused by Inappropriate Action.Valve Stroke Time Tested & Printouts Will Be Reviewed + (ML20067A320)
- ML20067A326 + (ML20067A326)
- ML20067A327 + (ML20067A327)
- 05000259/LER-1990-020, :on 901214,shutdown Board 1B Deenergized When Normal Feeder Breaker to Board Tripped During Time Delay Relay Test Resulting in ESF Actuation.Caused by Procedure Inadequacy.Maint Procedures Revised + (ML20067A337)
- ML20067A366 + (ML20067A366)
- ML20067A371 + (ML20067A371)
- ML20067A376 + (ML20067A376)
- ML20067A385 + (ML20067A385)