Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066B377 + (ML20066B377)
- ML20066B394 + (ML20066B394)
- W3P90-1917, Responds to Violations Noted in Insp Rept 50-382/90-24. Corrective actions:MD-007-002 Revised,Technicians Counseled & Equipment out-of-svc Checklist Initiated + (ML20066B397)
- ML20066B399 + (ML20066B399)
- ML20066B400 + (ML20066B400)
- ML20066B415 + (ML20066B415)
- ML20066B419 + (ML20066B419)
- ML20066B436 + (ML20066B436)
- ML20066B442 + (ML20066B442)
- LIC-90-0999, Informs of Progress Towards Increasing Number of on-shift Licensed Operators Since Aug 1989.Current Class W/Six Initial Reactor Operator License Candidates in Progress & Senior Reactor Operator Class to Begin in Jan 1991 + (ML20066B449)
- ML20066B454 + (ML20066B454)
- ML20066B458 + (ML20066B458)
- ML20066B459 + (ML20066B459)
- ML20066B464 + (ML20066B464)
- ML20066B465 + (ML20066B465)
- ML20066B466 + (ML20066B466)
- ML20066B469 + (ML20066B469)
- ML20066B470 + (ML20066B470)
- ML20066B471 + (ML20066B471)
- ML20066B475 + (ML20066B475)
- ML20066B476 + (ML20066B476)
- ML20066B478 + (ML20066B478)
- ML20066B480 + (ML20066B480)
- ML20066B493 + (ML20066B493)
- ML20066B500 + (ML20066B500)
- ML20066B525 + (ML20066B525)
- ML20066B535 + (ML20066B535)
- ML20066B541 + (ML20066B541)
- ML20066B544 + (ML20066B544)
- ML20066B547 + (ML20066B547)
- ML20066B556 + (ML20066B556)
- ML20066B563 + (ML20066B563)
- LIC-90-1009, Forwards Application for Amend to License DPR-40,adding Hydrogen Purge Sys to Tech Specs + (ML20066B565)
- ML20066B572 + (ML20066B572)
- ML20066B578 + (ML20066B578)
- 0CAN118203, Submits Addl Info Re 821005 Response to App R,Item 6, High/Low Pressure Interfaces, Per NRC 821029 Telcon. Isolation Device Will Be Provided Locally to Permit Control of Pressurizer ERV Block Valve + (ML20066B595)
- ML20066B599 + (ML20066B599)
- ML20066B601 + (ML20066B601)
- 0CAN118201, Confirms Implementation of Overtime Guidelines,Per Generic Ltr 82-12, Nuclear Power Plant Staff Working Hours. Procedures Revised to Incorporate Guidelines for Shift Operating Engineering & Technical Support Personnel + (ML20066B603)
- ML20066B604 + (ML20066B604)
- ML20066B606 + (ML20066B606)
- 0CAN129010, Submits Action Plan to Address Improvements to Fire Barrier Penetration Insp Program,Per Listed Lers.Training Program to Clarify Procedural Guidelines for Insp/Surveillance of Each Type of Penetration Seal Will Be Completed by 910901 + (ML20066B607)
- ML20066B614 + (ML20066B614)
- ML20066B619 + (ML20066B619)
- ML20066B635 + (ML20066B635)
- ML20066B640 + (ML20066B640)
- ML20066B644 + (ML20066B644)
- 05000251/LER-1982-014, Forwards LER 82-014/03L-0 + (ML20066B648)
- ST-HL-AE-3611, Forwards Annual 10CFR50.59 Summary Rept Which Describes Changes,Tests & Experiments Re Plant & Required Safety Evaluations.Rept Also Includes Summaries of Jcos + (ML20066B653)
- ML20066B654 + (ML20066B654)
- 05000251/LER-1982-014-03, /03L-0:on 821003,boron Injection Tank Circuit Found Below Tech Spec Limit of 145 F.Plant supervisor- Nuclear Not Promptly Notified.Caused by Inadequate Training & Info Dissemination to Personnel + (ML20066B655)