ML20066B458

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re Removal of RHR Head Spray Flow Transmitter
ML20066B458
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/27/1990
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20066B456 List:
References
NUDOCS 9101070171
Download: ML20066B458 (2)


Text

_ _ . - _ _ _ . _ _ ._ . _ _ . _ _ _ . . _ _ . _ _ _ . . . _.. _._ _ ____. .. __ _ .._ _ _ _ . _ _ _ . _ . .. _. __ _

4 1

TABLE 3.3.5.2-1 REMOTE SHUTDOWN MONITORINC INSTRUMENTATION MINIMUM READOUT CllANNELS FUNCTIONAL UNIT LOCATION OPERABLE

1. Reactor Vessel Pressure RSP I8) 1
2. Reactor Vessel Water Level RSP(a) g
3. Suppression Chamber Water Level RSP(a) g
4. Suppression Chamber Water Temperature RSP(a) 3
5. Drywell Pressure RSP(a) g
6. Drywell Temperature RSP I8) 1
7. Residual Heat Removal System Flow RSPI ") 1 (a) Remote Shutdown Panel, Reactor Building 20' Elevation BRUNSWICK - UNIT 2 3/4 3-57 Amendment No.

9101070171 901227 PDR ADOCK 05000324 P PDR

.1 TABLE 4.3.5.2-1 REMOTE SHUTDOVN MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS CHANNEL CilANNEL FUNCTIONAL UNIT CHECK 9ALIBRATION

1. Reactor Vessel Pressure H Q
2. Reactor Vessel Water Level N017 Instrument Loopt NA Q Remaining Instruments: M Q
3. Suppression Chamber Water Level H R
4. Suppression Chamber Water Temperature H R
5. Drywell Pressure M Q
6. Drywell Temperature M R
7. Residual Heat Removal System flow H Q i

l l

i BRUNSWICK - UNIT 2 3/4 3-58 Amendment No.

l.