Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000311/LER-1982-088-03, /03L-0:on 820824,containment Fan Coil Unit 25 Declared Inoperable After Low Svc Water Flow Observed.Caused by Air Regulator Being Out of Adjustment.Air Regulator Adjusted & Fan Coil Unit Satisfactorily Tested + (ML20065F766)
- ML20065F779 + (ML20065F779)
- ML20065F811 + (ML20065F811)
- PLA-1296, Forwards Description of Actions to Be Taken to Correct Deficiencies in Physical Security Plan,Per 820901-02 Discussions.Revised Plan Forthcoming.Encl Withheld (Ref 10CFR73.21) + (ML20065F814)
- WBL-20-007, 10 CFR 50.46 - 30-Day and Annual Report for Watts Bar Nuclear Plant Units 1 and 2 + (ML20065F821)
- 05000311/LER-1982-093, Forwards LER 82-093/01T-0.Detailed Event Analysis Encl + (ML20065F827)
- ML20065F837 + (ML20065F837)
- ML20065F842 + (ML20065F842)
- ML20065F856 + (ML20065F856)
- ML20065F863 + (ML20065F863)
- 05000311/LER-1982-093-01, /01T-0:on 820910,containment Fan Coil Unit 21 Declared Inoperable When Svc Water Leak Discovered.Caused by Erosion of Cooling Coil.Leaking Coil Blanked Off.Design Change Submitted to Replace Coils W/Erosion Resistant Matl + (ML20065F866)
- ML20065F873 + (ML20065F873)
- ML20065F877 + (ML20065F877)
- ML20065F884 + (ML20065F884)
- ML20065F887 + (ML20065F887)
- ML20065F896 + (ML20065F896)
- ST-HL-AE-4744, Responds to Violations Noted in Insp Rept 50-498/94-05 & 50-499/94-05.Corrective Actions:Procedure 0PGP03-ZR-0039 Revised to Direct Issuance of Station Problem Rept If Anomalous Measurements Obtained on Monitoring Program + (ML20065F903)
- ML20065F913 + (ML20065F913)
- ML20065F917 + (ML20065F917)
- 05000277/LER-1993-013, Forwards LER 93-013-00.LER Originally Distributed to All Individuals & Organizations Except DCD Due to Administrative Oversight + (ML20065F925)
- ST-HL-AE-3583, Revises Response to Violations Noted in Insp Repts 50-498/90-05 & 50-499/90-05,changing Completion Date for Corrective Action So That Actions May Be Completed as Part of Overall Emergency Preparedness Enhancement Program + (ML20065F926)
- ML20065F949 + (ML20065F949)
- 05000311/LER-1982-102, Forwards LER 82-102/03L-0.Detailed Event Analysis Encl + (ML20065F956)
- ML20065F960 + (ML20065F960)
- ML20065F965 + (ML20065F965)
- ML20065F975 + (ML20065F975)
- 05000311/LER-1982-102-03, /03L-0:on 820823,130-ft Elevation Containment Air Lock Declared Inoperable After Excessive Leakage Discovered Past Inner Door Seals.Caused by Closing Door W/Excessive Force.Seal Replaced.Installation of Snubbers Proposed + (ML20065F979)
- 05000282/LER-1990-013, :on 900830,inadvertent Mispositioning of Control Switch of 11 Shield Bldg Ventilation Heater Controls Identified.Caused by Workman Unknowingly Moving Switch. Protective Covers Installed Over Switches + (ML20065F980)
- ML20065F984 + (ML20065F984)
- ML20065F988 + (ML20065F988)
- ML20065F990 + (ML20065F990)
- ML20065F999 + (ML20065F999)
- ML20065G004 + (ML20065G004)
- LD-90-075, Forwards Amend H to CESSAR - Design Certification + (ML20065G011)
- ML20065G014 + (ML20065G014)
- ML20065G028 + (ML20065G028)
- ML20065G032 + (ML20065G032)
- ML20065G034 + (ML20065G034)
- HL-4550, Informs That in Response to Listed Items from SE for 18 Responses Provided in Util ,Util Has Revised Relief Requests RR-P-6 & RR-P-7 of Second 10-yr Insp Interval IST Program.Revised Relief Requests Encl + (ML20065G044)
- RBG-33864, Discusses Progress of Evaluation & Procurement Activities to Meet Reg Guide 1.97 Neutron Monitoring Requirements + (ML20065G056)
- ML20065G067 + (ML20065G067)
- ML20065G102 + (ML20065G102)
- ML20065G105 + (ML20065G105)
- 05000353/LER-1990-014-02, :on 900906,ESF Actuation of Primary Containment & Reactor Vessel Isolation Control Sys Occurred.Caused by Lack of Attention to Detail Resulting in Procedural Noncompliance.Personnel Counseled + (ML20065G107)
- ML20065G110 + (ML20065G110)
- 05000317/LER-1990-025, :on 900911,power Lost to Sample Pump for Gaseous Effluent Monitoring.Caused by Inadequate Design & Personnel Error.Power Promptly Restored to Sampling Equipment from Designated Receptacle + (ML20065G112)
- ML20065G113 + (ML20065G113)
- ML20065G115 + (ML20065G115)
- ML20065G121 + (ML20065G121)
- ML20065G126 + (ML20065G126)
- ML20065G133 + (ML20065G133)