Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20062F942 + (ML20062F942)
- ML20062F943 + (ML20062F943)
- ML20062F944 + (ML20062F944)
- ML20062F945 + (ML20062F945)
- IR 05000206/1990035 + (ML20062F947)
- ML20062F949 + (ML20062F949)
- ML20062F951 + (ML20062F951)
- ML20062F952 + (ML20062F952)
- ML20062F954 + (ML20062F954)
- ML20062F955 + (ML20062F955)
- ML20062F956 + (ML20062F956)
- ML20062F957 + (ML20062F957)
- ML20062F959 + (ML20062F959)
- ML20062F960 + (ML20062F960)
- 05000498/LER-1990-024, :on 901018,failed to Take Tech Spec Actions When One Channel of Subcooling Margin Became Inoperable + (ML20062F964)
- ML20062F965 + (ML20062F965)
- ML20062F966 + (ML20062F966)
- ML20062F967 + (ML20062F967)
- ML20062F968 + (ML20062F968)
- 05000302/LER-1978-063, Forwards LER 78-063/03L-0 + (ML20062F969)
- ML20062F970 + (ML20062F970)
- IR 05000317/1990028 + (ML20062F972)
- 05000302/LER-1978-063-03, /03L-0:on 781123,start-up Transformer Disabled, Causing Loss of Power in Cable Tunnel Sump Pumps.Operability Restored Shortly.Engineering Evaluation of Power Sys Initiated + (ML20062F974)
- ML20062F975 + (ML20062F975)
- ML20062F976 + (ML20062F976)
- 05000302/LER-1978-062, Forwards LER 78-062/03L-0 + (ML20062F977)
- ML20062F978 + (ML20062F978)
- ML20062F979 + (ML20062F979)
- 05000302/LER-1978-062-03, /03L-0:on 781121,during Control Rod Exercise Procedure SP-333,absolute Position Indication for Rod 4 Group 3 Not Observed as Rod Was Moved.Caused by Sticking Reed Switch + (ML20062F982)
- ML20062F983 + (ML20062F983)
- ML20062F985 + (ML20062F985)
- ML20062F986 + (ML20062F986)
- ML20062F988 + (ML20062F988)
- ML20062F989 + (ML20062F989)
- ML20062F991 + (ML20062F991)
- ML20062F994 + (ML20062F994)
- ML20062F995 + (ML20062F995)
- RBG-34031, Requests Termination of Senior Operator License SOP-43489 for Js Carlson + (ML20062F996)
- L-90-392, Responds to Violations Noted in Insp Repts 50-335/90-23 & 50-389/90-23.Corrective Actions:Instructions Reviewed W/Maint Personnel to Ensure Compliance & Work Control Procedure Revised + (ML20062F997)
- ML20062F998 + (ML20062F998)
- ML20062F999 + (ML20062F999)
- ML20062G000 + (ML20062G000)
- ML20062G001 + (ML20062G001)
- AECM-82-461, Application to Amend License NPF-13,delaying Control Room Leak Tightness Testing Until Unit Exceeds 5% Power. Technical Justification Encl + (ML20062G003)
- ML20062G004 + (ML20062G004)
- ML20062G005 + (ML20062G005)
- ML20062G006 + (ML20062G006)
- ML20062G007 + (ML20062G007)
- ML20062G011 + (ML20062G011)
- ST-HL-AE-3628, Requests Waiver from Tech Spec 4.4.6.2.2d,extending 24 H Time Requirement to 72 H for Pressure Isolation Valve Leak Testing + (ML20062G012)
- ML20062G013 + (ML20062G013)