Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000321/LER-1978-073, Forwards LER 78-073/03L-0 + (ML20062A925)
- ML20062A929 + (ML20062A929)
- 05000321/LER-1978-073-03, /03L-0:on 780912,fire Seals in Reactor Protection Sys Vertical Cable Found Breached at 130 & 147 Elevations. Caused by Failure of Const Crew to Repair Fire Seals After Installing Two Cables Through Reactor Protection Sys Roo + (ML20062A930)
- IR 05000219/1990009 + (ML20062A931)
- ML20062A934 + (ML20062A934)
- ML20062A936 + (ML20062A936)
- ML20062A937 + (ML20062A937)
- ML20062A939 + (ML20062A939)
- ML20062A941 + (ML20062A941)
- 05000302/LER-1978-047, Forwards LER 78-047/03L-0 + (ML20062A947)
- ML20062A949 + (ML20062A949)
- ML20062A950 + (ML20062A950)
- 05000302/LER-1978-047-03, /03L-0:on 780918,in Mode 1,while Performing RCS Total Gas Surveillance Procedure SP-710,gas Chromatograph Found Inoperable.Caused by Failure of Separation Column + (ML20062A951)
- ML20062A952 + (ML20062A952)
- ML20062A953 + (ML20062A953)
- ML20062A954 + (ML20062A954)
- ML20062A955 + (ML20062A955)
- 05000302/LER-1978-049, Forwards LER 78-049/03L-0 + (ML20062A956)
- ML20062A958 + (ML20062A958)
- ML20062A960 + (ML20062A960)
- 05000302/LER-1978-049-03, /03L-0:on 780915,relative Position Indication for Group 7,Rod 8 Found Inoperable.Caused by Improper Termination of Reactimeter to Relative Position Indicator Module for Group 7,Rod 1.Procedure Will Be Revised + (ML20062A962)
- ML20062A964 + (ML20062A964)
- ML20062A965 + (ML20062A965)
- ML20062A966 + (ML20062A966)
- ML20062A967 + (ML20062A967)
- ML20062A968 + (ML20062A968)
- ML20062A969 + (ML20062A969)
- ST-HL-AE-3599, Discusses Operational Readiness Insp Observation 24 Re Method for cross-referencing Surveillance Procedures + (ML20062A970)
- ML20062A971 + (ML20062A971)
- ML20062A972 + (ML20062A972)
- ML20062A973 + (ML20062A973)
- ML20062A974 + (ML20062A974)
- ML20062A975 + (ML20062A975)
- NRC-90-0154, Forwards Relief Request PR-10-R3 Re Mod of HPCI Main & Booster Pump Vibration Acceptance Criteria.Approval of Request Will Allow Reinstatement of Quarterly Testing of HPCI Main & Booster Pump & Eliminate Unnecessary Testing + (ML20062A976)
- ML20062A977 + (ML20062A977)
- ML20062A978 + (ML20062A978)
- ML20062A979 + (ML20062A979)
- ML20062A980 + (ML20062A980)
- 05000344/LER-1990-015-01, Forwards Rev 1 to LER 90-015-01 on 901015 Presenting Results of Preliminary Calculations + (ML20062A981)
- IR 05000397/1978009 + (ML20062A982)
- 05000341/LER-1990-010, :on 900718,during Performance of Surveillance 24.137.001, Main Steam Line Isolation Channel Functional Test, Operator Incorrectly Depressed Close Pushbutton Instead of Test Pushbutton,As Required + (ML20062A984)
- ML20062A985 + (ML20062A985)
- ML20062A987 + (ML20062A987)
- ML20062A988 + (ML20062A988)
- ML20062A989 + (ML20062A989)
- ML20062A990 + (ML20062A990)
- ML20062A995 + (ML20062A995)
- ML20062A997 + (ML20062A997)
- ML20062A999 + (ML20062A999)
- ML20062B000 + (ML20062B000)
- ML20062B001 + (ML20062B001)