Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20046B510 + (ML20046B510)
- ML20046B511 + (ML20046B511)
- B14551, Application for Amend to License NPF-49,revising TS to Clarify Locations Where Negative Pressure of 0.25 Inch Wg Must Be Obtained & Delineating Equipment Required to Comprise Operable Slcrs,In Response to in 88-076 + (ML20046B512)
- ML20046B514 + (ML20046B514)
- ML20046B515 + (ML20046B515)
- ML20046B519 + (ML20046B519)
- ML20046B520 + (ML20046B520)
- ML20046B522 + (ML20046B522)
- ML20046B523 + (ML20046B523)
- 05000293/LER-1993-007-01, :on 930317,automatic Closing of RCIC Sys Turbine Steam Supply Isolation Valves Occurred Due to High Steam Flow Signal.Increased Frequency of Valve Testing from Monthly to Weekly + (ML20046B524)
- 05000369/LER-1993-007-01, :on 930705,TS Required Surveillance Was Not Performed Because of Inappropriate Action Because of Lack of Attention to Detail.Generated WO 93047633 to Perform Required Surveillance on Unit 1 IPE CA 9010 + (ML20046B525)
- JPN-93-054, Responds to NRC Request for Addl Info Re Proposed TS Change for one-time Extension to Various Surveillance Intervals + (ML20046B526)
- ML20046B527 + (ML20046B527)
- 0CAN079302, Application for Amends to Licenses DPR-51 & NPF-6,revising ANO Unit 1,limiting Conditions for Operation,Surveillance Requirements,Bases for ECP & ANO Unit 2 Surveillance Requirements & Bases for ECP + (ML20046B528)
- ML20046B531 + (ML20046B531)
- ML20046B532 + (ML20046B532)
- ML20046B533 + (ML20046B533)
- ML20046B535 + (ML20046B535)
- ML20046B536 + (ML20046B536)
- ML20046B538 + (ML20046B538)
- ML20046B539 + (ML20046B539)
- ML20046B540 + (ML20046B540)
- BSEP-93-0122, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-324/93-28 & 50-325/93-28.Corrective Actions:Suspended Practice of Permitting Operations Personnel to self-issue Alnor Dosimeters Indefinitely + (ML20046B541)
- ML20046B542 + (ML20046B542)
- BSEP-93-0116, Special Rept SR 1-93-010:on 930623,LCO A2-93-F0517 Initiated on Fire Seal DG-2-083.Caused by Welding Lead Routed Through Seal Resulting in Inoperability.Fire Sealed Restored & LCO Cancelled on 930723 + (ML20046B543)
- ML20046B545 + (ML20046B545)
- ML20046B546 + (ML20046B546)
- 05000334/LER-1993-012, :on 930702,discovered That Hydrogen Analyzer Inoperable During Quarterly Performance of Calibration Procedure.Test Personnel Contributed to Cause of Event.Test & Calibration Procedures Will Be Revised + (ML20046B548)
- ML20046B549 + (ML20046B549)
- ML20046B550 + (ML20046B550)
- HL-3404, Forwards TS Pages Showing Original Proposed Changes & Changes Made by Unrelated Amends Re NRC Request for Clarification on Main Steamline Radiation + (ML20046B551)
- ML20046B553 + (ML20046B553)
- ML20046B554 + (ML20046B554)
- ML20046B555 + (ML20046B555)
- ML20046B556 + (ML20046B556)
- ML20046B558 + (ML20046B558)
- ML20046B559 + (ML20046B559)
- 05000324/LER-1992-004, :on 920730,RWCU Sys Isolated During Substation E7 de-energization Due to Personnel Error.Preparation of Project Plan for Development of Electrical Load List Using Plant Staff Resources Underway + (ML20046B560)
- ML20046B561 + (ML20046B561)
- RBG-38-675, Responds to Insp Rept 50-458/93-15 on 930510-14 Re follow-up Item & Weakness + (ML20046B563)
- ML20046B564 + (ML20046B564)
- JPN-93-053, Provides Response to NRC Bulletin 93-003, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Bwrs + (ML20046B565)
- ML20046B566 + (ML20046B566)
- NG-93-2347, Application for Amend to License DPR-49,incorporating Requirements of 10CFR20 Requirements + (ML20046B569)
- ML20046B571 + (ML20046B571)
- ML20046B573 + (ML20046B573)
- ML20046B574 + (ML20046B574)
- ML20046B576 + (ML20046B576)
- ML20046B577 + (ML20046B577)
- ML20046B578 + (ML20046B578)
- ML20046B579 + (ML20046B579)