Forwards for Info,Notice of Proposed Rulemaking to Be Published in Fr Allowing 30 Days for Public Comment.Nrc Proposing to Amend Regulations on Power Reactor Safety Re Submittal of FSARs Annually or 6 Months After Each Outage
ML20046B514
Person / Time
Issue date: 05/13/1993
From: Rathbun D
NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA)
To: Lehman R, Lieberman J, Sharp P
HOUSE OF REP., HOUSE OF REP., ENERGY & COMMERCE, SENATE, ENVIRONMENT & PUBLIC WORKS
References
FRN-58FR28523, RULE-PR-50, RULE-PR-54 NUDOCS 9308040322
Download: ML20046B514 (5)


Text

._

f* **%c

g..

1 UNITED STATES f.. ^ ^

j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20666-0001

~ %"

g May 13, 1993 i

The Honorable Joseph Lieberman, Chairman Subcommittee on Clean Air and Nuclear Regulation j

Committee on Environment and Public Works U.S. Senate i

Washington, D.C.

20510

Dear Mr. Chairman:

I Enclosed for the information of the subcommittee is a copy of a Notice of Proposed Rulemaking to be published ~in the Federal Reaister allowing 30 days for public comment. The Nuclear Regulatory Commission is proposing to amend its regulations on power reactor safety in order to consistently apply the requirement that nuclear power plant licensees submit final safety analysis i

report (FSAR) updates annually or~six months after each refueling outage.

On August 31, 1992, the NRC amended 10 CFR 50.71(e) to. allow licensees to submit the FSAR revisions annually or six months after each refueling outage.

However, paragraph (a)(3) of 10 CFR 50.54 refers to the submittal of quality.

assurance program descriptions at least annually'in accordance with the requirements of 10 CFR 50.71 and paragraph (b) of 10 CFR 54.37 refers.to the annual FSAR submittal. The amendma.nts to 10 CFR Parts 50 and 54 would' eliminate confusion and make the raferences to the requirement of FSAR update submittals in these two sections consistent with the amended 10 CFR 50.71(e).

The proposed rule would not require a backfit and would not require additional i

reporting requirements.

Sincerely, i

Dennis K. Rathbun, Director i

Office of Congressional Affairs

Enclosure:

Federal Reaister Notice l

cc:

Senator Alan K. Simpson l

%III"? '

930B040322 930513-PDR PR 50' MISC PDR 200107 h

i

1

). nc s

UNITED STATES f

l

[t j

NUCLEAR REGULATORY COMMISSION f

WASHINGTON, D.C. 20666-0001 A

o May 13, 1993 The Honorable Philip R. Sharp, Chairman Subcommittee on Energy and Power Committee on Energy and Commerce U.S. House of Representatives i

Washington, D.C.

20515 i

Dear Mr. Chairman:

Enclosed for the information of the subcommittee is a copy.of a Notice of Proposed Rulemaking to be published in the Federal Reoisty allowing 30 days for public comment.

The Nuclear Regulatory Commission is proposing to ' amend its regulations on power reactor safety in order to consistently apply the requirement that nuclear power plant licensees submit final safety analysis report (FSAR) updates annually or six months after each refueling outage.

On August 31, 1992, the NRC amended 10 CFR 50.71(e) to allow licensees to submit j

the FSAR revisions annually or six months after each refueling outage.

However, paragraph (a)(3) of 10 CFR 50.54 refers to the submittal of quality assurance program descriptions at least annually in accordance with the requirements of 10 CFR 50.71 and paragraph (b) of 10 CFR 54.37 refers to the L

annual FSAR submittal.

The amendments to 10 CFR Parts 50 and 54 would i

l eliminate confusion and make the' references to the requirement of FSAR update submittals in these two sections consistent with the amended 10 CFR 50.71(e).

The proposed rule would not require a backfit and would not require additional reporting requirements.

Sincerely, W

l Dennis K. Rathbun, Director Office of Congressional Affairs l

Enclosure:

Federal Reelster Notice cc: Representative Michael Bilirakis j

+

UNITED STATES f

I E

NUCLEAR REGULATORY COMMISSION E

f WASHINGTON, D.C. 20056-0001

\\..*/

May 13, 1993

+

l The Honorable Richard H. Lehman, Chairman Subcommittee on Energy and Mineral Resources j

Committee on Natural Resources U.S. House of Representatives f

Washington, D.C.

20515 i

Dear Mr. Chairman:

Enclosed for the information of the subcommittee is a copy of a Notice of Proposed Rulemaking to be published in the Federal Reaister allowing 30 days for public comment.

The Nuclear Regulatory Commission is proposing to amend its regulations on power reactor safety in order to consistently apply the requirement that-n'uclear power plant licensees submit final safety analysis report (FSAR) updates annually or six months after each refueling outage.

On August 31, 1992, the NRC amended 10 CFR 50.71(e) to allow licensees to submit the FSAR revisions annually or six months after each refueling outage.

However, paragraph (a)(3) of 10 CFR 50.54 refers to the submittal of quality assurance program descriptions at least annually in accordance with the requirements of 10 CFR 50.71 and paragraph (b) of 10 CFR 54.37 refers;to the annual FSAR submittal. The amendments to 10 CFR Parts 50 and 54 would~

eliminate confusion and make the references to the requirement of FSAR update submittals in these two sections consistent with the amended 10 CFR 50.71(e).

The proposed rule would not require a backfit and would not require additional reporting requirements.

Sincerely, T

Dennis K. Rathbun, Director i

Office of Congressional Affairs

Enclosure:

Federal Reaister Notice cc:

Representative Barbara Vucanovich

l May 13, 1993 The Honorable Joseph Lieberman, Chairman Subcommittee on Clean Air and Nuclear Regulation Committee on Environment and Public Works U.S. Senate Washington, D.C.

20510

Dear Mr. Chairman:

j Enclosed for the information of the subcommittee is a copy of a Notice of i

Proposed Rulemaking to be published in the Federal Reaister allowing 30 days for public comment. The Nuclear Regulatory Commission is proposing to amend its regulations on power reactor safety in order to consistently apply the requirement that nuclear power plant licensees submit final safety analysis report (FSAR) updates annually or six months after each refueling outage.

On August 31, 1992, the NRC amended 10 CFR 50.71(e) to allow licensees to submit the FSAR revisions annually or six months after each refueling outage.

However, paragraph (a)(3) of 10 CFR 50.54 refers to the submittal of quality assurance program descriptions at least annually in accordance with the l

requirements of 10 CFR 50.71 and paragraph (b) of 10 CFR 54.37 refers tc the annual FSAR submittal. The amendments to 10 CFR Parts 50 and 54 would eliminate confusion and make the references to the requirement of FSAR update submittals in these two sections consistent with the amended 10 CFR 50.71(e).

The proposed rule would not require a backfit and would not require additional l

reporting requirements.

Sincerely, original signed by/

Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Federal Reaister Notice cc:

Senator Alan K. Simpson DISTRIBUTION:

RRG R/F CCraig RRG b{

OC CCra spie DRathbun

'J/'y /93 g

/93 f//gN93

A a E c <g f$

UNITED STATES

+

j..'# ' f.,j NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 20665-0001

\\

..s

/

May 13, 1993 The Honorable Joseph Lieberman, Chairman Subcommittee on Clean Air and Nuclear Regulation Committee on Environment and Public Works U.S. Senate Washington, D.C.

20510

Dear Mr. Chairman:

l Enclosed for the information of the subcommittee is a copy of a Notice of Proposed Rulemaking to be published in the Federal Reaister allowing 30 days for public comment.

The Nuclear Regulatory Commission is proposing to amend its regulations on power reactor safety-in order to-consistently apply the requirement that nuclear power plant licensees submit final safety analysis report (FSAR) updates annually or six months after each refueling outage.

On August 31, 1992, the NRC amended 10 CFR 50.71(e) to allow licensees to submit i

the FSAR revisions annually or six months after each refueling outage.

However, paragraph (a)(3) of 10 CFR 50.54 refers to the submittal of quality assurance program descriptions at least annually in accordance with the requirements of 10 CFR 50.71 and paragraph (b) of 10 CFR 54.37 refers.to the annual FSAR submittal. The amendments to 10 CFR Parts 50 and 54 would' eliminate confusion and make the references to the requirement of FSAR update submittals in these two sections consistent with the amended 10 CFR 50.71(e).

The proposed rule would not require a backfit and would not require additional reporting requirements.

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Federal Reaister Notice cc:

Senator Alar K. Simpson l

.- - -