Summary of 930722 Meeting W/Util Re Civil Engineering Design Rept for New EDG Seismic Category 1 Bldg Which Will House Class 1E Which Is Being Added to Site
ML20046B573
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 07/29/1993
From: Mcdonald D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-M85222, TAC-M85223, NUDOCS 9308050176
Download: ML20046B573 (5)


Text

.

p** "%g?g y(

i E

UNITED STATES l!

NUCLEAR REGULATORY COMMISSION

'g v,/

i wassincton o.c. 20sss-oooi July 29, 1993 Docket Nos. 50-317 and 50-318 LICENSEE:

Baltimore Gas and Electric Company (BG&E)

FACILITY: Calvert Cliffs Nuclear Power Plant, Unit Nos. I and 2

SUBJECT:

MEETING

SUMMARY

REGARDING THE JULY 22, 1993, MEETING TO DISCUSS THE CIVIL ENGINEERING DESIGN REPORT FOR THE NEW EMERGENCY DIESEL GENERATOR BUILDING - CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. M85222) AND UNIT 2 (TAC N0. M85223)

BACKGROUND:

On July 21,1988, Part 50 of Title 10 of the Code of Federal Regulations was i

amended to include a new Section 50.63, entitled, " Loss of All Alternating Current Power," referred to as the station blackout (SB0) rule.

The SB0 rule requires that each light-water cooled nuclear power plant be able to withstand and recover from an SB0 of specified duration. The SB0 rule also requires l

that information defined in the rule be provided to the staff for review.

BG&E responded to the requirements of the rule and the staff approved its response by letter dated February 12, 1992. The staff's approval included the addition of a new safety-related Class-1E emergency diesel generator (EDG). A series of meetings are being held to discuss various design aspects of the EDG project. BG&E has provided a Civil Engineering Report, a Qualification Test Program, and a Mechanical Systems Design Report for NRC staff review and i

approval.

These submittals will be followed by other submittals addressing the electrical and instrumentation' design requirements for the addition of the EDGs which are being discussed during the series of meetings.

i PURPOSE This meeting focused on the Civil Engineering Design Report for the new EDG j

seismic Category I buildir which will house the Class IE EDG which is being i

added to the site. A list )f attendees is enclosed.

\\

SUMMARY

The NRC staff and the BG&E representatives discussed details related to the i

fuel oil storage tank, the EDG pedestal, the affects of nearby structures, and geotechnical issues. The geotechnical issues discussed included the design

]

i considerations and parameters for ground water level, liquefaction potential, slope stability analyses, and flotation. The maximum differential settlement calculations and methodology were also discussed.

\\, c 9308050176 930729 i

PDR ADDCK 05000317 P

PDR m..

. July 29,1993 i

BG&E indicated that the Mechanical Systems Desigt; Report dated July 20, 1993, which is in the process of being docketed, provides additional information relating to some of the structural details discussed during the meeting.

BG&E further indicated that it would provide supplemental information for both the structural and geotechnical issues discussed during the meeting to assure that all of the necessary information needed is available to allow the staff to complete its review of the Civil Engineering Design Report in a timely manner.

The information requested affects one respondent and, therefore, is not subject to the Office of Management and Budget review under P.L.96-511.

Daniel G. Mcdonald, Senior Project Manager Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Enclosure:

Attendance List cc w/ enclosure:

See next page i

};-

---L--.--.

.^

Calvert Cliffs Nuclear Power Plant Baltimore Gas & Electric Company Unit Nos. I and 2 cc:

Mr. Michael Moore, President Mr. Joseph H. Walter Calvert County Board of Engineering Division Commissioners Public Service Commission of 175 Main Street Maryland Prince Frederick, Maryland 20678 American Building 231 E. Baltimore Street D. A. Brune, Esquire Baltimore, Maryland 21202-3486 General Counsel Baltimore Gas and Electric Company Kristen A. Burger, Esquire P. O. Box 1475 Maryland People's Counsel Baltimore, Maryland 21203 American Building, 9th Floor 231 E. Baltimore Street Jay E. Silberg, Esquire Baltimore, Maryland 21202 Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW Patricia T. Birnie, Esquire Washington, DC 20037 Co-Director Maryland Safe Energy Coalition Mr. G. L. Detter, Director, NRM P. O. Box 33111 Calvert Cliffs Nuclear Power Plant Baltimore, Maryland 21218 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702 Mr. Robert E. Denton Vice President - Nuclear Energy Resident Inspector Baltimore Gas and Electric Company c/o U.S. Nuclear Regulatory Calvert Cliffs Nuclear Power Plant Commission 1650 Calvert Cliffs Parkway P. O. Box 287 Lusby, Maryland 20657 a702 St. Leonard, Maryland 20685 Mr. Richard I. McLean Administrator - Radioecology Department of Natural Resources 580 Taylor Avenue Tawes State Office Building B3 Annapolis, Maryland 21401 Regional Administrator, Regica I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406

EHCLOSURE July 22.1993 NRC-Meetino on the Civil Enoineerino Desion Report List of Attendees NRiE ORGANIZATION PHONE NO.

Michael Mikolanis Bechtel 301-417-8507 Arman Sanver Bechtel 301-417-3126 John Davie Bechtel 301-417-3167 Eugene Thomas Bechtel 301-417-3195 Guy Goddard Bechtel 301-417-8329 James Nygaard Bechtel 301-417-8421-J. V. Nessia Bechtel 301-417-8426 Chen P. Tan NRC/ECGB 301-504-3315 Raman Pichumani NRC/ECGB 301-504-2734 Daniel G. Mcdonald NRC/NRR 301-504-1408 P. S. Furio BG&E 410-260-4394 Gary J. O'Connell BG&E 410-260-4049 i

l 1

t i July 29,1993 l

t BG&E indicated that the Mechanical Systems Design Report dated July 20, 1993, which is in the process of being docketed, provides additional information relating to some of the structural details discussed during the meeting.

BG&E l

further indicated that it would provide supplemental information for both the structural and geotechnical issues discussed during the meeting to assure that all of the necessary information needed is available to allow the staff to complete its review of the Civil Engineering Design Report in a timely manner.

The information requested affects one respondent and, therefore, is not subject to the Office of Management and Budget review under P.L.96-511.

i Original signed by:

i Daniel G. Mcdonald, Senior Project Manager Project Directorate I-l l

Division of Reactor Projects - I/II 4

Office of Nuclear Reactor Regulation

Enclosure:

Attendance List cc w/ enclosure:

l See next page

{

DISTRIBUTION-Docket File D. Mcdonald NRC & Local PDRs C. Vogan PDI-l Reading OGC T. Murley/F. Miraglia,12/G/18 E. Jordan J. Partlow, 12/G/18 C. Tan, 7/H/15 S. Varga R. Pichumani, 7/H/15 J. Calvo ACRS (10) l R. A. Capra V. McCree, ED0 4

LA:PDI-1 PM:PDI-D:PDI-1 l

v CVogan 0t)

DMcDonald:smm RACapra *v E

7 /28 93 oT /*f993 o'1 /29 /93

/ /

/ /

/ /

/

OFFICIAL RECORD COPY FILENAME: CC85222.MlS i

.