Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039B077 + (ML20039B077)
- 05000029/LER-1981-030-03, /03L-0:on 811111,primary Vent Stack Gaseous & Iodine Radiation Monitor Rate Meters Failed High & Channel Inoperable for Approx 9.6-h.Caused by Moisture in Detectors Due to Need to Bypass Dryers Because of Low Flow Condition + (ML20039B078)
- ML20039B079 + (ML20039B079)
- ML20039B080 + (ML20039B080)
- ML20039B081 + (ML20039B081)
- 05000278/LER-1981-017-03, /03L-0:on 811109,reactor Core Isolation Cooling High Steam Flow Isolation Switch Exceeded Tech Spec Limit. Caused by Setpoint Drift of Barton Model 288 Dpis.Instrument Recalibr + (ML20039B082)
- ML20039B083 + (ML20039B083)
- ML20039B084 + (ML20039B084)
- AECM-81-503, Forwards Response to Human Factors Engineering Branch Concerns Re Facility Control Room Review.Response to Remaining Open Items Will Be Submitted 60 Days Prior to Full Power OL Issuance + (ML20039B087)
- ML20039B088 + (ML20039B088)
- ML20039B091 + (ML20039B091)
- ML20039B093 + (ML20039B093)
- IR 05000206/1981039 + (ML20039B095)
- ML20039B096 + (ML20039B096)
- 05000271/LER-1981-031, Forwards LER 81-031/03L-0 + (ML20039B097)
- ML20039B099 + (ML20039B099)
- ML20039B100 + (ML20039B100)
- ML20039B102 + (ML20039B102)
- ML20039B103 + (ML20039B103)
- ML20039B104 + (ML20039B104)
- 05000271/LER-1981-031-03, /03L-0:on 811109,setpoint of Standby Liquid Control Relief Valve Found to Exceed Tech Specs Range.Caused by Setpoint Drift Apparently Due to Crystallization of Sodium Pentaborate on Disc/Seat Interface + (ML20039B106)
- ML20039B107 + (ML20039B107)
- 05000271/LER-1981-027, Forwards Updated LER 81-027/03X-1 + (ML20039B108)
- ML20039B110 + (ML20039B110)
- ML20039B111 + (ML20039B111)
- ML20039B113 + (ML20039B113)
- 05000271/LER-1981-027-03, MSIV-80C Failed to Close on Receipt of Group 1 Isolation Signal During Reactor Scram. Caused by Actuator Failure.Actuator Completely Overhauled & Guide Rods,Spring Plate & Bushings Replaced + (ML20039B114)
- ML20039B115 + (ML20039B115)
- ML20039B116 + (ML20039B116)
- 05000245/LER-1981-036, Forwards LER 81-036/03L-0.Detailed Event Analysis Encl + (ML20039B117)
- ML20039B119 + (ML20039B119)
- ML20039B120 + (ML20039B120)
- ML20039B121 + (ML20039B121)
- 05000245/LER-1981-036-03, /03L-0:on 811112,pressure Switch 2206-1621D Tripped Outside Allowable Band.Caused by Setpoint Drift. Switch Readjusted + (ML20039B123)
- ML20039B124 + (ML20039B124)
- 05000271/LER-1981-033, Forwards LER 81-033/01T-0 + (ML20039B125)
- ML20039B127 + (ML20039B127)
- 05000271/LER-1981-033-01, /01T-0:on 811125,reactor Bldg Roof Hatch Opened by Work Crew W/O Notice to Supervisor Until Fire Permit for Welding Requested.Caused by Personnel Error.Personnel Reinstructed Re Procedural Requirement + (ML20039B128)
- AECM-81-481, Forwards Revised Process Control Program, in Response to Discussions W/Nrc & 811208 Telcon Re Proposed Program Changes.Revision Includes Instructions for Solidification of Radwaste Slurry & Evaporator Botton Concentrates + (ML20039B129)
- ML20039B131 + (ML20039B131)
- ML20039B132 + (ML20039B132)
- ML20039B133 + (ML20039B133)
- ML20039B135 + (ML20039B135)
- ML20039B137 + (ML20039B137)
- 05000318/LER-1981-051, Forwards LER 81-051/03L-0 + (ML20039B138)
- IR 05000133/1981004 + (ML20039B140)
- ML20039B141 + (ML20039B141)
- ML20039B142 + (ML20039B142)
- ML20039B144 + (ML20039B144)
- IR 05000285/1981019 + (ML20039B145)
- ML20039B147 + (ML20039B147)