Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000302/LER-1981-031-04, /04L-1:on 810806,environ Monitoring Program Found to Be Not in Conformance W/Established Procedures.Caused by Contractor Failure to Follow Procedures in Eight Areas. Procedures Clarified & Corrective Actions Completed + (ML20032A268)
- ML20032A269 + (ML20032A269)
- ML20032A270 + (ML20032A270)
- ML20032A272 + (ML20032A272)
- ML20032A273 + (ML20032A273)
- ML20032A274 + (ML20032A274)
- ML20032A275 + (ML20032A275)
- ML20032A279 + (ML20032A279)
- ML20032A282 + (ML20032A282)
- ML20032A284 + (ML20032A284)
- PM-81-883, Ro:On 811001,reactor Scram Received from Group 1 Isolation, Resulting in Loss of Reactor Feed Pumps & Subsequent Reactor Water Level Reduction.Hpci Manually Started in Full Flow Test Condensate Storage Tank,Reducing Reactor Pressure + (ML20032A285)
- ML20032A286 + (ML20032A286)
- ML20032A291 + (ML20032A291)
- 05000369/LER-1981-152, Forwards LER 81-152/03L-0.Detailed Event Analysis Encl + (ML20032A293)
- ML20032A295 + (ML20032A295)
- ML20032A298 + (ML20032A298)
- ML20032A299 + (ML20032A299)
- 05000369/LER-1981-152-03, /03L-0:on 810831,steam Generator 1C Main Feed to Auxiliary Feedwater Nozzle Isolation Valve Would Not Operate Electrically from Control Room.Caused by Burned Out Motor & Flasher for Overload Heater.Motor Replaced + (ML20032A302)
- ML20032A303 + (ML20032A303)
- 05000282/LER-1981-023, Forwards LER 81-023/03L-0 + (ML20032A304)
- PNO-I-81-117, on 811021,offgas Holdup Isolation Valve Failed Closed Requiring Power Reduction & Reactor Shutdown to Avoid Condenser Vacuum Loss.Caused by Cutting nonsafety-related Instrument Control Wiring + (ML20032A306)
- ML20032A307 + (ML20032A307)
- 05000282/LER-1981-023-03, /03L-0:on 810921,during Surveillance Test,One Cooling Water Header Isolation Valve Did Not Close Fully. Caused by Wet Motor Leads in Junction Box.Wiring Renewed + (ML20032A309)
- 05000369/LER-1981-159, Forwards LER 81-159/03L-0 + (ML20032A311)
- ML20032A313 + (ML20032A313)
- ML20032A314 + (ML20032A314)
- 05000369/LER-1981-159-03, /03L-0:on 810915,while in Mode 3,boron Injection Tank Discharge Isolation Valve Began Binding While Opening After Adjustment to Packing.Cause Undetermined.Packing Loosened & Valve Cycled Manually.Motor Replaced + (ML20032A315)
- 05000296/LER-1981-050, Forwards LER 81-050/03L-0 + (ML20032A316)
- ML20032A318 + (ML20032A318)
- ML20032A319 + (ML20032A319)
- ML20032A321 + (ML20032A321)
- ML20032A322 + (ML20032A322)
- 05000296/LER-1981-050-03, /03L-0:on 810922,during Normal Operation,Generator Coupling on 3EA LPCI MG Set Became Loose.Caused by Slipping of Retainer Ring.Generator Coupling Reassembled & Lubricated + (ML20032A324)
- ML20032A325 + (ML20032A325)
- ML20032A326 + (ML20032A326)
- ML20032A327 + (ML20032A327)
- ML20032A328 + (ML20032A328)
- PNO-I-81-116, on 811021,minor Earthquake of 3.5 on Richter Scale Felt Onsite.Site in Preoperational Phase & No Fuel Onsite.No Damage Occurred + (ML20032A329)
- B10320, Criticizes NRC Release of Inaccurate Info Used in Ny Times Article Re Potential for Reactor Vessel Failure Due to Pressurized Thermal Shock.Requests That NRC Inform Util in Future of Info Released to Media for Public Disclosure + (ML20032A330)
- ML20032A331 + (ML20032A331)
- ML20032A332 + (ML20032A332)
- 05000325/LER-1981-068, Forwards LER 81-068/03L-0 + (ML20032A334)
- ML20032A336 + (ML20032A336)
- ML20032A338 + (ML20032A338)
- 05000325/LER-1981-068-03, /03L-0:on 811003,control Rod 14-43 Did Not Have Full in or 00 RTGB Position Indication While Fully Inserted.Probably Caused by Defective Rod Position Indication Probe Reed Switch.Investigation Continuing + (ML20032A339)
- ML20032A340 + (ML20032A340)
- ML20032A342 + (ML20032A342)
- ML20032A343 + (ML20032A343)
- ML20032A344 + (ML20032A344)
- ML20032A345 + (ML20032A345)
- ML20032A346 + (ML20032A346)