ML20032A345

From kanterella
Jump to navigation Jump to search
Ro:Routine Testing of Pressurizer Code Safety Valves Determined That One of Three Valves Would Not Have Activated at or Near Setpoint.Possibly Caused by Damage During Surveillance Test Sequence.Valve Will Be Repaired
ML20032A345
Person / Time
Site: Haddam Neck, Oyster Creek  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/19/1981
From: Graves R
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8110290438
Download: ML20032A345 (1)


Text

LE{

CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT RR # 1, BOX 127E, EAST HAMPTON, CONN. 06424 October 19, 1981 U. S. Nuclear Regulatory Commission Region 1 Office of Inspection and Enforcement

-(@gh Qg 631 Park Avenue King of Prussia, Pennsy.'v inia 19406 l4

\\

T[f Q]d/I g Attn

Mr. Ronald C. Haynes, 57 Direc tor

?

r~

l OCT2 8 iggy g

Reference:

Facility Operating License No. DPR-61 5

W.t.nmun g Docket No. 50-213 CC""W 8

Reportable Occurrence LER 81-17/IP

.h.

M@

P

Dear Mr. Haynes:

m In accordance with Connecticut Yankee Technical Specifications Section 6.9.2.a, the following information concerning the results of pressurizer code safety valve tests is hereby provided.

Pressurizer code safety valves are tested during each refueling shutdown to verify their setpoints.

Routine testing has determined that one of three valves would not have activated at or near its setpoint. The valve will be repaired and retested prior to returning the reactor to criticality.

Preliminary information indicates the possibility that the valve may have been damaged during the surveillance test sequence.

A followup report will be submitted within fourteen (14) days.

Very truly yours, i

f%

Richard H. Graves Station Superintendent RHG/jhb cc:

Dir., Management Info & Program Control, Washington, D. C.

(2)

USNRC c/o Document Management Branch, Washington, D. C.

(1) f'V 98 0 8110290438 811019 PDR ADOCK 05000219 S