Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1981-025, Forwards LER 81-025/03L-0 + (ML20009E919)
- ML20009E921 + (ML20009E921)
- 05000366/LER-1981-058-03, /03L-0:on 810622,during steady-state Operation at 2,194 Mw,Reactor Bldg to Torus Vacuum Breaker Isolation Valve 2T48-F310 Failed Open.Cause Attributed to Torus Differential Pressure Switch Setpoint Drift.Switch Recalibr + (ML20009E922)
- ML20009E924 + (ML20009E924)
- ML20009E927 + (ML20009E927)
- ML20009E934 + (ML20009E934)
- 05000336/LER-1981-025-03, /03L-0:on 810615,span Gas Voltage on Hydrogen Analyzer B Found Out of Spec.Caused by Instrument Drift Due to High Temp within Analyzer Cabinets.Temp Control Switch Reset + (ML20009E937)
- ML20009E938 + (ML20009E938)
- ML20009E941 + (ML20009E941)
- ML20009E944 + (ML20009E944)
- ML20009E946 + (ML20009E946)
- ML20009E947 + (ML20009E947)
- IR 05000267/1981006 + (ML20009E949)
- ML20009E951 + (ML20009E951)
- ML20009E952 + (ML20009E952)
- ML20009E953 + (ML20009E953)
- IR 05000445/1981008 + (ML20009E954)
- ML20009E955 + (ML20009E955)
- ML20009E956 + (ML20009E956)
- ML20009E959 + (ML20009E959)
- ML20009E960 + (ML20009E960)
- ML20009E961 + (ML20009E961)
- ML20009E963 + (ML20009E963)
- ML20009E964 + (ML20009E964)
- TXX-3370, Forwards Response to NRC Question 032.108 Re Control Sys Failures.Response Will Be Incorporated Into FSAR by Amend 25 + (ML20009E965)
- ML20009E966 + (ML20009E966)
- ML20009E968 + (ML20009E968)
- ML20009E970 + (ML20009E970)
- 05000333/LER-1981-055, Forwards LER 81-055/03L-0 + (ML20009E972)
- ML20009E976 + (ML20009E976)
- ML20009E977 + (ML20009E977)
- ML20009E978 + (ML20009E978)
- ML20009E979 + (ML20009E979)
- IR 05000482/1981009 + (ML20009E980)
- 05000333/LER-1981-055-03, /03L-0:on 810701,during Normal Operation,While Conducting Table 4.2-1 Surveillance,Condenser Vacuum Switch 33-PS-135B Found Set Below Required Height,Cause Believed to Be Instrument Drift.Switch Immediately Adjusted + (ML20009E981)
- 05000302/LER-1981-033, Forwards LER 81-033/03L-0 + (ML20009E982)
- ML20009E983 + (ML20009E983)
- ML20009E984 + (ML20009E984)
- 05000293/LER-1981-027, Forwards LER 81-027/03L-0 + (ML20009E985)
- ML20009E986 + (ML20009E986)
- ML20009E987 + (ML20009E987)
- 05000302/LER-1981-033-03, /03L-0:on 810616,lightning Struck Startup Transformer Causing Loss of Ac Power.Power Loss Tripped Air Handling Fans,Resulting in Temp Increase in Reactor Bldg. Cause Attributed to Failure of Lightning Arrestor Sys + (ML20009E988)
- ML20009E989 + (ML20009E989)
- ML20009E990 + (ML20009E990)
- ML20009E991 + (ML20009E991)
- 05000339/LER-1981-055, Forwards LER 81-055/01T-0 + (ML20009E992)
- ML20009E993 + (ML20009E993)
- 05000298/LER-1981-012, Forwards LER 81-012/03L-0.Detailed Event Analysis Encl + (ML20009E994)
- ML20009E995 + (ML20009E995)
- 05000293/LER-1981-027-03, /03L-0:on 810616,while Performing Rod Block Monitor Surveillance Test 8.M.2.3.1,step 31 High Rod Block Came on at 123% Vs 94% Power.Caused by Failed Trip Ref Card. Card Replaced in Kind + (ML20009E996)
- ML20009E997 + (ML20009E997)