ML20009E960

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Westinghouse 4 Inch Through 18 Inch Motor Operated Gate Valves,Initially Reported on 810313.Valve Tests Expected to Be Complete in Early 1982. Final Rept Will Be Submitted by June 1982
ML20009E960
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 07/17/1981
From: Devincentis J
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, SBN-170, NUDOCS 8107280571
Download: ML20009E960 (1)


Text

,

,(o.

pumuc BERVICE CompanyofNew@

SF#800K STATION July 17, 1981 Engineering Office:

1671 Worcester Road SBN-170 Framingham, MA 01701 T.F. Q 2.2.2 United Sta tes Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Attention: Office of Inspection and Enforcement

References:

(1) Docket No. 50-443 and 50-444 (2) Telecon of Junc 17, 1981 between Eldon Brunner, NRC and D. Phidrand, YAEC (3) PSNH Letter SBN-159, dated May 1,1981 (4) PSNH Letter SBN-154, dated March 13, 1981

Subject:

Reportable 10 CFR 50.55 (e) Item 4" through 18" Motor Operated Gate Valves Interim Report

Dear Sir:

On June 17, 1981 we reported that Wes tinghouse 6" through 18" motor operated gate valves were considered a reportable item under 10 CFR 50.55 (e).

This interim report is being filed in accordance with the thirty-day reporting requirements.

Westinghouse has been conducting tests to determine the cause of the failure of the 3" and 4" motor operated valves to tightly seal at test P.

Reference (3) is the final report on the test results and corrective action for the 3" valves.

Reference (4) is the interim report which identified the problem with the 4" valves. Westinghouse has now expanded the test program 'o include the remaining Westinghouse EMD valve sizes (6" through 18").

Tests for valve sizes 4" through 18" are expected to be completed early in 1982.

Upon review of the test results, a corrective action will be generated. We will update this interim report upon definition of the proposed corrective action and provide a final report on 4" through 18" motor operated gate valves by June, 1982.

Very truly yours,

& 1)

A+1/

John DeVincentis Project Manager DAM /kab cc: Director of Inspection and Enforcement Y