Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350D607 + (ML19350D607)
- ML19350D609 + (ML19350D609)
- ML19350D610 + (ML19350D610)
- ML19350D611 + (ML19350D611)
- ML19350D612 + (ML19350D612)
- ML19350D613 + (ML19350D613)
- 05000325/LER-1981-041, Forwards LER 81-041/03L-0 + (ML19350D614)
- ML19350D615 + (ML19350D615)
- 05000324/LER-1981-043, Forwards LER 81-043/03L-0.Detailed Event Analysis Encl + (ML19350D616)
- ML19350D617 + (ML19350D617)
- 05000260/LER-1980-053, Forwards Updated LER 80-053/03X-1 + (ML19350D618)
- ML19350D619 + (ML19350D619)
- 05000366/LER-1981-034, Forwards LER 81-034/03L-0 + (ML19350D620)
- ML19350D621 + (ML19350D621)
- ML19350D622 + (ML19350D622)
- ML19350D624 + (ML19350D624)
- 05000293/LER-1981-013, Forwards LER 81-013/04T-0 + (ML19350D625)
- ML19350D626 + (ML19350D626)
- ML19350D627 + (ML19350D627)
- 05000334/LER-1981-031, Forwards LER 81-031/01T-0 + (ML19350D628)
- ML19350D629 + (ML19350D629)
- ML19350D631 + (ML19350D631)
- 05000260/LER-1980-026, Forwards Updated LER 80-026/03X-1 + (ML19350D632)
- ML19350D633 + (ML19350D633)
- ML19350D634 + (ML19350D634)
- ML19350D635 + (ML19350D635)
- ML19350D636 + (ML19350D636)
- ML19350D637 + (ML19350D637)
- ML19350D638 + (ML19350D638)
- ML19350D639 + (ML19350D639)
- ML19350D640 + (ML19350D640)
- 05000260/LER-1980-026-03, Reactor Motor Operated Valve Board Lost Power to Normal Feeder Breaker Which Is Supplied from 3A Compartment of 2A Shutdown Board.Cause Unknown.Suspected Power Sensor Unit Tested Satisfactorily + (ML19350D642)
- ML19350D643 + (ML19350D643)
- 05000334/LER-1981-031-01, /01T-0:on 810427,free Chlorine Measured at Outfall Structure & Duration of Condenser Tube Chlorination Exceeded Tech Spec Limits.Caused by Communication Problem Re Inservice Portions of Sys.Overchlorination Stopped + (ML19350D644)
- ML19350D645 + (ML19350D645)
- A01617, Comments on NRC Draft Evaluation of SEP Topic XV-20, Radiological Consequences of Fuel Damaging Accidents, for Facility.Util Concurs W/Balance of Evaluation.Forwards Revision 2 of Operating Procedure NOP 2.15-3-C + (ML19350D646)
- ML19350D648 + (ML19350D648)
- ML19350D649 + (ML19350D649)
- ML19350D650 + (ML19350D650)
- ML19350D651 + (ML19350D651)
- ML19350D652 + (ML19350D652)
- ML19350D653 + (ML19350D653)
- 05000260/LER-1981-018, Forwards LER 81-018/03L-0 + (ML19350D654)
- ML19350D655 + (ML19350D655)
- 05000260/LER-1981-018-03, /03L-0:on 810418,xenon Transient Observed Following Control Rod Sequence Exchange.Caused by Earlier Load Reduction in Conjunction W/New Control Rod Pattern. Control Rods Inserted & R Factor Brought within Limits + (ML19350D656)
- 05000327/LER-1981-045, Forwards LER 81-045/03L-0 + (ML19350D657)
- ML19350D658 + (ML19350D658)
- 05000327/LER-1981-045-03, /03L-0:on 810409,auxiliary Feedwater Pump Tripped on Overspeed During Surveillance Test.Apparently Caused by Drift in Electronics of Speed Controls for Turbine.Turbine Adjusted,Started & Verified to Operate Properly + (ML19350D659)
- 05000306/LER-1981-005, Forwards LER 81-005/03L-0 + (ML19350D660)
- ML19350D661 + (ML19350D661)
- 05000306/LER-1981-005-03, /03L-0:on 810423,containment Vacuum Breakers Test Sp 2130 Was Discovered to Not Have Been Performed.Caused by Personnel Oversight.Preheatup Surveillance Test Scheduling Will Be Changed + (ML19350D662)