ML19350D611
| ML19350D611 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/14/1981 |
| From: | Wisenburg M TENNESSEE VALLEY AUTHORITY |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8105180187 | |
| Download: ML19350D611 (1) | |
Text
TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 400 Chestnut Street Tower II May 14, 1981
<s b
{'? Qf l
Director of Nuclear Feactor Pegulation U
Attention: Mr. A. Schwencer, Chief A//ly I
Licensing Branch No. 2
'g-
- 3, 2 8 ggI A 4,
/
8' Division of Licensing s,
U.S. Nuclear Regulatory Ca mission.
\\
'o, 7 e
Washington, DC 20555
\\
WJ ;
' i,'
Dear Mr. Schweneer:
N.-
In the Matter of the Application of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 At the request of the NBC Environmental Branch Peviewer, TVA will conduct a verification review of the purge valve configuration differences between unit 1 and unit 2.
TVA will report on the results of our onsite review of the unit 2 purge valve configuration by June 1, 1981.
By review of plant design drawings and valve specifications, IVA considers that there are no differences between the purge syst m s for unit 1 and unit 2 which could significantly affect the conciuctions of IVA's review of purge valve cperability/ reliability to close in a IffA environment. The purge valve configuration for unit I was verified (see w letter to you dated January 8, 1981). If our onsite review of unit 2 defines any significant differences, this matter muld be promptly analyzed and appropriately reported.
Very truly yours, TENNESSEE VALLEY AtmlORITY s
A ald)
M. R. Wigenburg Nuclear Engineer Sworn to subscr ly3 fore me
.' thi
_ day f
/tx4/ 1981 bre
~
Nota Public
/ /r U My salon Expires Y/f/D
//
l An Equal Opportunity Employer