Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325E854 + (ML19325E854)
- TXX-8976, Forwards Endorsement 6 to Nelia Certificate NW-167 & Endorsement 7 to Maelu Certificate MW-190,for Info Re Financial Protection Requirements of 10CFR140.13 + (ML19325E856)
- ML19325E857 + (ML19325E857)
- ML19325E858 + (ML19325E858)
- ML19325E859 + (ML19325E859)
- ML19325E860 + (ML19325E860)
- ML19325E861 + (ML19325E861)
- ML19325E862 + (ML19325E862)
- 0CAN108915, Responds to NRC 890829 Request for Addl Info Re Violations Noted in Insp Repts 50-313/89-16 & 50-368/89-16.Corrective Actions:Util Currently in Process of Enhancing Existing Matls Mgt Program to Meet Guidelines of NCIG-07 + (ML19325E863)
- ML19325E864 + (ML19325E864)
- ML19325E866 + (ML19325E866)
- ML19325E867 + (ML19325E867)
- ML19325E868 + (ML19325E868)
- ML19325E871 + (ML19325E871)
- ML19325E873 + (ML19325E873)
- ML19325E874 + (ML19325E874)
- 05000245/LER-1989-019-01, :on 891003,determined That Surveillance Test for Isolation Condenser Isolation Instrument Functional & Calibr Test Done Beyond Required Time Interval.Caused by Personnel Error.Dept Procedure Revised + (ML19325E875)
- 05000336/LER-1989-008-01, :on 891002,determined That Unit Not Performing Functional Check of Control Board Annunciators During Channel Function Tests.Caused by Personnel Error.Review of Instrumentation & Control Dept Procedures Done + (ML19325E876)
- ML19325E878 + (ML19325E878)
- ML19325E879 + (ML19325E879)
- ML19325E880 + (ML19325E880)
- 05000354/LER-1989-018-01, :on 891003,determined That Two Tech Spec Required Readings Not Taken as Required When Vent Monitoring Sys Inoperable on 890929.Caused by Lack of Adequate Communication.Personnel Involved Counseled + (ML19325E881)
- ML19325E882 + (ML19325E882)
- ML19325E883 + (ML19325E883)
- ML19325E884 + (ML19325E884)
- 3F1089-28, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 175,increasing Spent Fuel Pool Storage Capacity & Allowable Fuel Enrichment to 4.2% in Fuel Pool B + (ML19325E885)
- ML19325E886 + (ML19325E886)
- ML19325E887 + (ML19325E887)
- ML19325E888 + (ML19325E888)
- ML19325E889 + (ML19325E889)
- ML19325E891 + (ML19325E891)
- ML19325E892 + (ML19325E892)
- ML19325E893 + (ML19325E893)
- NRC-89-0187, Submits Justification for RHR HX Tube Leakage Test Commitment Clarification.Commitment to Perform Periodic Leakage Test on RHR HX Tubes Necessary + (ML19325E894)
- ML19325E895 + (ML19325E895)
- ML19325E896 + (ML19325E896)
- ML19325E898 + (ML19325E898)
- ML19325E900 + (ML19325E900)
- ML19325E901 + (ML19325E901)
- BECO-89-162, Special Rept:On 890929,fire Water Supply Sys Storage Tanks Declared Inoperable.Caused by Drained Storage Tank. Fwst (T-107A) Refilled & Declared Operable on 891007 + (ML19325E902)
- ML19325E903 + (ML19325E903)
- ML19325E905 + (ML19325E905)
- ML19325E907 + (ML19325E907)
- ML19325E908 + (ML19325E908)
- IR 05000445/1989077 + (ML19325E909)
- IR 05000313/1989042 + (ML19325E910)
- ND-19-1412, Financial Assurance Requirements for Decommissioning + (ML19325E911)
- NL-19-093, Proposed Technical Specifications (TS) Changes - Indian Point Nuclear Generating Unit 3 TS SR 3.7.7.2 and TS 3.7.6, Required Action A.1 + (ML19325E913)
- ML19325E914 + (ML19325E914)
- ML19325E916 + (ML19325E916)
- ML19325E917 + (ML19325E917)