Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325C394 + (ML19325C394)
- ML19325C395 + (ML19325C395)
- ML19325C396 + (ML19325C396)
- ML19325C397 + (ML19325C397)
- ML19325C398 + (ML19325C398)
- ML19325C401 + (ML19325C401)
- ML19325C403 + (ML19325C403)
- 05000278/LER-1989-003-03, :on 890808,subsequent Sys Walkdown & Analysis Revealed That as-found Configuration Would Result in Piping Stresses Adjacent to Valves Exceeding Code Limits.Caused by Design & Installation Error + (ML19325C406)
- 05000344/LER-1989-018, :on 890908,both Train a & Train B of RHR Became Inoperable at Same Time.Caused by Inadequate Communication Between Shifts.Train a of Component Cooling Water Sys & RHR Restored to Svc + (ML19325C407)
- ML19325C408 + (ML19325C408)
- ML19325C409 + (ML19325C409)
- ML19325C410 + (ML19325C410)
- ML19325C411 + (ML19325C411)
- ML19325C412 + (ML19325C412)
- ML19325C415 + (ML19325C415)
- ML19325C417 + (ML19325C417)
- ML19325C418 + (ML19325C418)
- A08262, Responds to NRC Re Violations Noted in Insp Rept 50-245/89-13 on 890517-18 & Forwards Payment in Amount of $25,000 for Civil Penalty.Corrective Actions:Meeting Between Health Physics & Radiation Protection Supervisors Conducted + (ML19325C422)
- ML19325C423 + (ML19325C423)
- ML19325C425 + (ML19325C425)
- ML19325C426 + (ML19325C426)
- ML19325C428 + (ML19325C428)
- ML19325C431 + (ML19325C431)
- ML19325C433 + (ML19325C433)
- ML19325C434 + (ML19325C434)
- ML19325C435 + (ML19325C435)
- ML19325C436 + (ML19325C436)
- ML19325C437 + (ML19325C437)
- ML19325C438 + (ML19325C438)
- ML19325C439 + (ML19325C439)
- 2CAN108905, Requests Relief from Article IWC-5000 of Section XI of 1974 Edition,Summer 1975 Addenda of ASME Code for Test Pressure Value for Class 2 Sys Hydrostatic Test on Unit Main Steam Sys.Sys Should Not Be Subjected to Addl Hydrostatic Test + (ML19325C440)
- ML19325C441 + (ML19325C441)
- ML19325C444 + (ML19325C444)
- ML19325C446 + (ML19325C446)
- ML19325C447 + (ML19325C447)
- ML19325C448 + (ML19325C448)
- 05000313/LER-1989-032, :on 890906,discovered That Monthly Functional Test for Reactor Bldg Area Radiation Monitors Not Performed as Required by Tech Spec.Caused by Inadequate Procedural Guidance.Procedure Rev Request Form Revised + (ML19325C449)
- ML19325C450 + (ML19325C450)
- ML19325C451 + (ML19325C451)
- ML19325C453 + (ML19325C453)
- ML19325C455 + (ML19325C455)
- 05000483/LER-1989-010, :on 890905,ESF Containment Purge,Control Room Ventilation & Fuel Bldg Ventilation Isolation Actuations Received.Caused by Failure of 15-volt Dc Power Supply.Failed Power Supply Replaced & Event Discussed + (ML19325C457)
- ML19325C464 + (ML19325C464)
- BSEP-89-0889, Special Rept 2-SR-89-004:on 890922,7-day Time Frame for Limiting Condition of Operation Exceeded.Fire Watches Will Be Maintained Until Door Returned to Svc & Limiting Condition for Operation Canceled + (ML19325C468)
- ML19325C469 + (ML19325C469)
- ML19325C470 + (ML19325C470)
- ML19325C472 + (ML19325C472)
- 05000369/LER-1989-015, :on 890722,discovered That Neutral Pressure Was Best That Could Be Achieved in Some Required Sys Configurations.Caused by Design Deficiency Due to Design Oversight.Outside Air Ref Point Installed + (ML19325C473)
- ML19325C474 + (ML19325C474)
- 05000324/LER-1989-013-02, :on 890909,HPCI Turbine Auxiliary Oil Pump Developed Shaft Seal Leak of Approx 1 Gpm.Root Cause Not Determined.Turbine Secured & Investigation Begun.Failure Analysis of Seal Being Performed + (ML19325C477)
- ML19325C478 + (ML19325C478)