Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19325C093 + (ML19325C093)
- ML19325C094 + (ML19325C094)
- ML19325C101 + (ML19325C101)
- ML19325C109 + (ML19325C109)
- ML19325C110 + (ML19325C110)
- ML19325C112 + (ML19325C112)
- ML19325C114 + (ML19325C114)
- ML19325C115 + (ML19325C115)
- 05000440/LER-1987-009, :on 870227,failure of Two Control Air Solenoid Valves Rendered Div I & II Diesel Generators Inoperable. Cause Unknown.Solenoid Valves Replaced & Plant Administrative Procedure PAP-1705 Revised + (ML19325C117)
- ML19325C128 + (ML19325C128)
- ML19325C131 + (ML19325C131)
- ML19325C134 + (ML19325C134)
- ML19325C135 + (ML19325C135)
- ML19325C137 + (ML19325C137)
- ML19325C138 + (ML19325C138)
- ML19325C139 + (ML19325C139)
- ML19325C140 + (ML19325C140)
- ML19325C142 + (ML19325C142)
- ML19325C143 + (ML19325C143)
- ML19325C145 + (ML19325C145)
- ML19325C146 + (ML19325C146)
- ML19325C147 + (ML19325C147)
- ML19325C148 + (ML19325C148)
- ML19325C149 + (ML19325C149)
- ML19325C151 + (ML19325C151)
- ML19325C152 + (ML19325C152)
- ML19325C156 + (ML19325C156)
- ML19325C157 + (ML19325C157)
- ML19325C158 + (ML19325C158)
- ML19325C160 + (ML19325C160)
- ML19325C161 + (ML19325C161)
- ML19325C163 + (ML19325C163)
- ML19325C165 + (ML19325C165)
- ML19325C166 + (ML19325C166)
- ML19325C170 + (ML19325C170)
- ML19325C173 + (ML19325C173)
- ML19325C174 + (ML19325C174)
- ML19325C175 + (ML19325C175)
- ML19325C177 + (ML19325C177)
- ML19325C180 + (ML19325C180)
- DD-89-07, Notice of Issuance of Directors Decision DD-89-07,denying Nuclear Energy Accountability Project 890903 Petition for NRC to Intervene & Stop 891012 Launch of Galileo Spacecraft + (ML19325C184)
- ML19325C185 + (ML19325C185)
- ML19325C188 + (ML19325C188)
- 05000336/LER-1988-010-01, :on 880921,observed That Test/Operate Switch for Each of Containment Atmosphere Gaseous Radiation Monitors Was in Test Position.Caused by Operator Error. Switch Placed in Operate Position + (ML19325C194)
- ML19325C195 + (ML19325C195)
- 05000413/LER-1989-026, :on 890823,tested Breaker Replaced W/Traceable Breaker in Response to Bulletin 88-010.Breaker Tripped. Caused by Mfg Deficiency.Work Request Written.Item Reportable Per Part 21 + (ML19325C196)
- 05000282/LER-1989-014, :on 890905,operations Personnel Recalled That SP1093.1 Performed Two Wks Previously Instead of SP1093.2. Caused by Personnel Error in Selecting Incorrect Procedure. Proper Notifications Made & SP1093.2 Performed + (ML19325C198)
- 05000282/LER-1989-015-01, :on 890905 & 23,special Ventilation Sys of Control Rooms 122 & 121 Actuated Automatically.Caused by False High Chlorine Signal & Broken Chlorine Sensitive Paper Tape,Respectively.Detectors Repaired + (ML19325C199)
- ML19325C201 + (ML19325C201)
- ML19325C203 + (ML19325C203)
- ML19325C204 + (ML19325C204)