Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19261D582 + (ML19261D582)
- ML19261D583 + (ML19261D583)
- ML19261D590 + (ML19261D590)
- ML19261D591 + (ML19261D591)
- ML19261D593 + (ML19261D593)
- ML19261D594 + (ML19261D594)
- ML19261D596 + (ML19261D596)
- ML19261D597 + (ML19261D597)
- ML19261D599 + (ML19261D599)
- ML19261D601 + (ML19261D601)
- 05000323/LER-1979-035, Forwards LER 79-035/03L-0 + (ML19261D602)
- ML19261D603 + (ML19261D603)
- 05000325/LER-1979-035-03, /03L-0 on 790517:coolant Sample Line Isolation Valves Would Not Close.Caused by Solenoids Stuck in Open Position & Control Switches of Sample Station Shorted. Solenoids Were Cleaned & Returned to Svc + (ML19261D604)
- ML19261D605 + (ML19261D605)
- ML19261D606 + (ML19261D606)
- ML19261D607 + (ML19261D607)
- 05000237/LER-1979-034, Forwards LER 79-034/01T-0 + (ML19261D608)
- ML19261D609 + (ML19261D609)
- 05000237/LER-1979-034-01, /01T-0 on 790530:diesel Generator Failed to Start During Operability Test.Caused by Failure to Engage of Lower Air Start Bendix Gear.Gear Aligment Will Be Checked After Diesel Generator Tests + (ML19261D610)
- ML19261D611 + (ML19261D611)
- ML19261D613 + (ML19261D613)
- ML19261D614 + (ML19261D614)
- ML19261D615 + (ML19261D615)
- ML19261D616 + (ML19261D616)
- ML19261D617 + (ML19261D617)
- ML19261D618 + (ML19261D618)
- ML19261D619 + (ML19261D619)
- ML19261D620 + (ML19261D620)
- 05000338/LER-1979-077, Forwards LER 79-077/03L-0 + (ML19261D621)
- ML19261D622 + (ML19261D622)
- 05000338/LER-1979-077-03, /03L-0 on 790531:during Power Reduction,Axial Flux Difference Deviated Greater than 5% from Target.Caused by Rapid Reduction Necessitated by High Bearing Temp of Feedwater Pump C Boration.Corrected Problem + (ML19261D623)
- ML19261D624 + (ML19261D624)
- ML19261D625 + (ML19261D625)
- ML19261D626 + (ML19261D626)
- 05000237/LER-1979-002-01, /01X-1 on 790103:during Normal Operation,Hpci Turbine Failed to Start During Quarterly Flow Test.Caused by Partial Engagement of Interlock Dump Valve Operating Lever. Lever Adjusted.Hpci Started to Verify Operability + (ML19261D627)
- 05000219/LER-1979-017, Forwards LER 79-017/03L-0 + (ML19261D628)
- ML19261D629 + (ML19261D629)
- ML19261D630 + (ML19261D630)
- 05000219/LER-1979-017-03, /03L-0 on 790517:during Routine Surveillance of Core Spray Sys Ii,Parallel Isolation Valve V-20-21 Failed to Operate.Caused by Circuit Breaker Contacts Making Poor Contact in B Phase,Creating Overcurrent.Part Replaced + (ML19261D631)
- ML19261D632 + (ML19261D632)
- ML19261D633 + (ML19261D633)
- ML19261D634 + (ML19261D634)
- ML19261D635 + (ML19261D635)
- ML19261D636 + (ML19261D636)
- ML19261D637 + (ML19261D637)
- ML19261D639 + (ML19261D639)
- ML19261D641 + (ML19261D641)
- IR 05000346/1979004 + (ML19261D642)
- ML19261D643 + (ML19261D643)
- ML19261D644 + (ML19261D644)
- ML19261D645 + (ML19261D645)