Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19256G156 + (ML19256G156)
- ML19256G157 + (ML19256G157)
- 05000325/LER-1979-103-03, /03L-0:on 791205,root Valve to Instruments 1-ES1-PS-N012B & D Found Closed.Cause Unknown.Penetrant Test Completed Successfully & Valves Left in Proper Position + (ML19256G158)
- 05000324/LER-1979-105-03, /03L-0:on 791201,while Replacing Indicating Light Bulb During Rod Block Monitor Rod Block Test,Bulb Broke & Rod Block Monitor B Tripped.Caused by Base of Broken Bulb Coming in Contact W/Ground.Bulb Replaced + (ML19256G159)
- 05000325/LER-1979-091, Forwards LER 79-091/03L-0 + (ML19256G160)
- ML19256G161 + (ML19256G161)
- 05000325/LER-1979-093-03, /03L-0:on 791127,while Performing High Steamline Radiation Channel Alignment & Functional Test,Main Steamline Drawer B Was Out of Specs.Caused by Instrument Drift.Drawer Recalibr + (ML19256G162)
- 05000245/LER-1979-034-03, L-0:on 791115,while Performing Routine Surveillance,Electrical Fault in Motor Controller Rendered Lcpi Inboard Isolation Stop Valve Inoperable.Caused by Contactor Arcing + (ML19256G163)
- ML19256G164 + (ML19256G164)
- ML19256G165 + (ML19256G165)
- 05000324/LER-1979-098, Forwards LER 79-098/03L-0 + (ML19256G166)
- ML19256G167 + (ML19256G167)
- 05000324/LER-1979-101, Forwards LER 79-101/03L-0 + (ML19256G168)
- ML19256G169 + (ML19256G169)
- 05000325/LER-1979-091-03, /03L-0:on 791201,seal Staging Flow High Annunciator Was Received on Recirculation Pump 1B & Drywell Floor Drain Pump Started Pumping.Caused by Excessive Packing Leakage of Recirculation Pump 1B Suction + (ML19256G170)
- ML19256G171 + (ML19256G171)
- ML19256G172 + (ML19256G172)
- ML19256G173 + (ML19256G173)
- ML19256G174 + (ML19256G174)
- 05000324/LER-1979-098-03, /03L-0:on 791129,while Replacing Section of Flex Conduit Leading to Flow Switch,One Lead Came in Contact W/ Case,Shorting Itself & Causing RHR Logic a Power Failure. Caused by Blown F-1 Fuse.Fuse Replaced + (ML19256G175)
- 05000324/LER-1979-091, Forwards LER 79-091/03L-0 + (ML19256G176)
- ML19256G177 + (ML19256G177)
- 05000324/LER-1979-101-03, /03L-0:on 791120,during Normal Reactor Startup, Intermediate Range Monitor D Did Not Indicate Proper Overlap on Range 7.Caused by Preamplifier Maladjustment.Preamplifier Adjusted Per Maint Instruction 3-15J + (ML19256G178)
- 05000325/LER-1979-106, Forwards LER 79-106/03L-0 + (ML19256G179)
- ML19256G180 + (ML19256G180)
- ML19256G181 + (ML19256G181)
- 05000263/LER-1979-021, Forwards LER 79-021/03L-0 + (ML19256G182)
- ML19256G183 + (ML19256G183)
- 05000324/LER-1979-091-03, /03L-0:on 791126,during Normal Plant Operation, Operator Noticed Containment Atmospheric Monitor CAC-AR-1259 Was Reading Upscale on Oxygen Channel.Caused by Blocked Sample Flow While Monitor Was Sampling Torus + (ML19256G184)
- 05000325/LER-1979-106-03, /03L-0:on 791207,during Core Spray Sys,Component Test, Core Spray/Rhr Pump Running Annunciator Not Received.Caused by Shut Root Valves Not Returned to Normal Position After Testing on 791130 + (ML19256G185)
- 05000325/LER-1979-107, Forwards LER 79-107/01T-0 + (ML19256G186)
- ML19256G187 + (ML19256G187)
- ML19256G188 + (ML19256G188)
- 05000206/LER-1979-022, Forwards LER 79-022/01T-0 + (ML19256G189)
- 05000338/LER-1979-158, Forwards LER 79-158/01T-0 + (ML19256G190)
- ML19256G191 + (ML19256G191)
- 05000325/LER-1979-107-01, /01T-0:on 791212,while Performing Visual Insp of Inaccessible Snubbers,Several Snubbers Found on Safety Relief Valve F013H Tailpipe.Caused by Reactor Scram When Safety Relief Valves F013F,G & H Automatically Lifted + (ML19256G192)
- 05000338/LER-1979-158-01, /01T-0:on 791211,during Mode 5,S&W Notified Util That Nonseismically Qualified Pressure Differential Switch (PDS-HV1228A & B) Had Been Used in Condenser Water Controls in Control Room Air Conditioners + (ML19256G193)
- ML19256G194 + (ML19256G194)
- 05000346/LER-1979-113, Forwards LER 79-113/03L-0 + (ML19256G195)
- ML19256G196 + (ML19256G196)
- 05000346/LER-1979-113-03, /03L-0:on 791121,hourly Surveillance Requirements Not Performed for 5.5-h While Incore Instrumentation Was Inoperable.Caused by Procedural Deficiency.Equipment Status Board Not Updated.Procedure Pp 1102.02 Revised + (ML19256G198)
- ML19256G199 + (ML19256G199)
- ML19256G200 + (ML19256G200)
- IR 05000395/1979031 + (ML19256G202)
- ML19256G203 + (ML19256G203)
- ML19256G205 + (ML19256G205)
- ML19256G206 + (ML19256G206)
- ML19256G207 + (ML19256G207)
- ML19256G208 + (ML19256G208)
- IR 05000498/1979017 + (ML19256G210)