05000263/LER-1979-021, Forwards LER 79-021/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 79-021/03L-0
ML19256G182
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 12/19/1979
From: Mayer L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML112900956 List:
References
NUDOCS 7912270568
Download: ML19256G182 (1)


LER-1979-021, Forwards LER 79-021/03L-0
Event date:
Report date:
2631979021R00 - NRC Website

text

NSF NORTHERN STATES POWER COMPANY M I N N E A PO LI S. M I N N E S OTA 55405

("

December 19, 1979 Mr J G Keppler Office of Inspection & Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr Keppler:

MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Anchor Bolts for Snubber SS-31 Found Inadequate The Licensee Event Report for this occurrence is reproduced on the back of this letter. Enclosed are three copies.

This event is reported in compliance with Technical Specification 6.7.B.2.b.

because operation with an inoperable snubber is a degraded mode permitted by Technical Specification 3.6.H.2.

Yours very truly, wi smost L 0 Mayer, PE Manager of Nuclear Support Services LOM/DMM/j5 cc:

Director, IE, USNRC (30)

Director, MIPC, USNRC (3)

MPCA Attn: J W Ferman 1642 024 (Over) g 7912270