Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19225C224 + (ML19225C224)
- 05000293/LER-1979-019, Forwards LER 79-019/01T-0 + (ML19225C226)
- ML19225C228 + (ML19225C228)
- ML19225C233 + (ML19225C233)
- 05000293/LER-1979-019-01, /01T-0 on 790705:error Discovered in Calculation Utilized to Support Amend 34 to Fsar.Model Assumed Reactor Bldg Truck Lock Door Open to Atmosphere.Erroneous Computer Runs Corrected & New Analysis Performed + (ML19225C234)
- ML19225C237 + (ML19225C237)
- 05000213/LER-1979-007, Forwards LER 79-007/01T-0 + (ML19225C238)
- ML19225C240 + (ML19225C240)
- 05000213/LER-1979-007-01, /01T-0 on 790707:one Category I Pipe Support on Svc Water Piping WS-121-5 Found Not to Be Seismic Type WS-RES-1 Specified on Drawing.Caused by Human Error.Existing Pipe Changed Immediately + (ML19225C241)
- ML19225C242 + (ML19225C242)
- ML19225C243 + (ML19225C243)
- ML19225C244 + (ML19225C244)
- 05000293/LER-1979-022, Forwards LER 79-022/01T-0 + (ML19225C245)
- 05000333/LER-1979-040, Forwards LER 79-040/03L-0 + (ML19225C247)
- ML19225C248 + (ML19225C248)
- 05000293/LER-1979-022-01, /01T-0 on 790713:during Evaluation of Seismic Restraints,Pipe Supports on HPCI Test Line Downstream of Test Valve & on RHR Crosstie Failed to Meet SSE Specs.Caused by Design Error.Supports Modified + (ML19225C249)
- ML19225C250 + (ML19225C250)
- ML19225C251 + (ML19225C251)
- 05000333/LER-1979-040-03, /03L-0 on 790630:during Cold Shutdown,Rhr Sys Not Fully Operable Due to Existence of Leak Flow Path Through Discharge Check Valve for Pump A.Caused by Valve Disc Detaching from Disc Holder.Repairs Are Continuing + (ML19225C252)
- ML19225C254 + (ML19225C254)
- ML19225C255 + (ML19225C255)
- ML19225C256 + (ML19225C256)
- ML19225C257 + (ML19225C257)
- ML19225C259 + (ML19225C259)
- ML19225C260 + (ML19225C260)
- ML19225C263 + (ML19225C263)
- ML19225C264 + (ML19225C264)
- ML19225C266 + (ML19225C266)
- ML19225C270 + (ML19225C270)
- ML19225C273 + (ML19225C273)
- ML19225C277 + (ML19225C277)
- ML19225C280 + (ML19225C280)
- NRC-2019-0145, Comment (1) of Erich Reimer on Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3 + (ML19225C295)
- ML19225C298 + (ML19225C298)
- ML19225C303 + (ML19225C303)
- ML19225C316 + (ML19225C316)
- ML19225C318 + (ML19225C318)
- 05000278/LER-1979-018-03, /03L-0 on 790630:during Surveillance Testing, Reactor Water Sample Line Isolation Valve Failed to Close. Caused by Lack of Valve Operator Spring Tension.Valve Operator Spring Tension Was Increased + (ML19225C337)
- ML19225C338 + (ML19225C338)
- ML19225C339 + (ML19225C339)
- ML19225C341 + (ML19225C341)
- ML19225C342 + (ML19225C342)
- ML19225C344 + (ML19225C344)
- ML19225C346 + (ML19225C346)
- TXX-2998, Responds to NRC Re Violation Noted in IE Insp Repts 50-445/79-11 & 50-446/79-11.Corrective Actions: Consultant Retained to Evaluate Inplace Condition of Portion of Dome Altered W/O QA Knowledge + (ML19225C348)
- IR 05000508/1979005 + (ML19225C349)
- ML19225C350 + (ML19225C350)
- ML19225C351 + (ML19225C351)
- ML19225C352 + (ML19225C352)
- ML19225C353 + (ML19225C353)
- ML19225C354 + (ML19225C354)