Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19208A718 + (ML19208A718)
- ML19208A719 + (ML19208A719)
- ML19208A720 + (ML19208A720)
- ML19208A722 + (ML19208A722)
- ML19208A723 + (ML19208A723)
- ML19208A724 + (ML19208A724)
- ML19208A725 + (ML19208A725)
- 05000324/LER-1979-073, Forwards LER 79-073/03L-0 + (ML19208A726)
- ML19208A727 + (ML19208A727)
- ML19208A728 + (ML19208A728)
- ML19208A730 + (ML19208A730)
- 05000277/LER-1979-040, Forwards LER 79-040/01T-0 + (ML19208A731)
- ML19208A732 + (ML19208A732)
- 05000324/LER-1979-073-03, /03L-0:on 790813,RHR Pump Breaker 2A Was Erroneously Racked Out,Making Both Loops of Sys Inoperable. Caused by Incorrect Prepration of Tag & tag-out Sheet by Control Operator.Personnel Instructed + (ML19208A733)
- ML19208A734 + (ML19208A734)
- ML19208A735 + (ML19208A735)
- 05000277/LER-1979-040-01, /01T-0:on 790821,contract Personnel Disarmed Carbon Dioxide Sys & Established Fire Watch.Caused by Personnel Error.Sys Restored to Normal & Personnel Involved Received Instruction on Work Requirements + (ML19208A736)
- 05000368/LER-1979-063-03, /03L-0:on 790806,containment Atmosphere Sample Reactor Bldg Penetration Outside Isolation Valve 2SV-8263-2 Would Not Indicate Closed During Stroke Test.Caused by Limit Switch Being Out of Adjustment.Limit Adjusted + (ML19208A739)
- 05000344/LER-1979-013-03, /03L-0:on 790807,seismic Restraint on Containment Spray Suction Piping Nonfunctional.Base Plate of Pedestal Support Slid Off Graphite Plate & Cracked Plate.Support Redesigned,Repaired & Returned to Svc + (ML19208A740)
- ML19208A741 + (ML19208A741)
- ML19208A743 + (ML19208A743)
- ML19208A744 + (ML19208A744)
- 05000029/LER-1979-020, Forwards LER 79-020/03L-0 + (ML19208A745)
- ML19208A747 + (ML19208A747)
- ML19208A748 + (ML19208A748)
- ML19208A749 + (ML19208A749)
- 05000368/LER-1979-065-03, /03L-0:on 790809,battery Charger 2D31 Failed, Rendering Dc Bus a Inoperable.Caused by Dc Output Lamp Socket Burning Up Due to Higher Voltage & Increased Resistance in Circuit.Unit Cleaned + (ML19208A750)
- ML19208A751 + (ML19208A751)
- ML19208A752 + (ML19208A752)
- 05000029/LER-1979-020-03, /03L-0:on 790813,during Leak Rate Surveillance Testing on VD-TV-202,leakage Past Upstream Isolation Valves Stopped Test.Caused by Leakage in Seat of One or More Valves.Valves to Be Tested on 790908 + (ML19208A753)
- ML19208A754 + (ML19208A754)
- TXX-3038, Informs NRC of Plans to Start Onsite Examination Activities Re Pipe Wall Thickness by 790920 + (ML19208A755)
- ML19208A756 + (ML19208A756)
- ML19208A758 + (ML19208A758)
- ML19208A759 + (ML19208A759)
- ML19208A760 + (ML19208A760)
- ML19208A762 + (ML19208A762)
- 05000271/LER-1979-020, Forwards LER 79-020/03L-0 + (ML19208A764)
- ML19208A765 + (ML19208A765)
- 05000277/LER-1979-037-03, /03L-0:on 790812,A&B Control Room Intake Air Radiation Monitors a & B Failed Downscale.Caused by Transistor Circuit Failure within Monitors.Monitor a Replaced & Monitor B Repaired + (ML19208A768)
- ML19208A770 + (ML19208A770)
- ML19208A771 + (ML19208A771)
- ML19208A773 + (ML19208A773)
- 05000313/LER-1979-012, Forwards LER 79-012/03L-1 + (ML19208A776)
- ML19208A777 + (ML19208A777)
- 05000271/LER-1979-020-03, /03L-0:on 790815,during Surveillance Testing of Msiv,Inboard Valve V2-80A in Main Steam Line Closed Properly But Did Not Fully Reopen.Caused by Spring Plate Binding on Guide Shaft + (ML19208A778)
- ML19208A779 + (ML19208A779)
- IR 05000409/1979015 + (ML19208A781)
- ML19208A782 + (ML19208A782)
- 05000312/LER-1979-009, Forwards LER 79-009/03L-0 + (ML19208A783)
- ML19208A785 + (ML19208A785)