Text
.
.
. p arpw*o,
UNITED ST ATES
-
- !\\ . , cf
7,
NUCLEAR REGULATORY COMMISSION
/
$, .; i "# ' E
REGION 11
o,
[
101 MARIETT A ST., N W., SUIT E 3100
ATLANTA, GEORGIA 30303
i
j
jut. 311979
In Reply Refer To:
RII:JKR
50-491/79-13
50-492/79-13
50-493/79-13
Duke Power Company
Atta:
L. C. Dail, Vice President
Design Engineering
Post Office Box 33189
Charlotte, North Carolina 28242
Gentlemen:
This refers to the inspection conducted by J. K. Rausch of this office
on July 16-18, 1979 of activities authorized by NRC Construction Permit
Nos. CPPR-167, CPPR-168 and CPPR-169 for the Cherokee Nuclear Station
facility, Units 1, 2 and 3, and to the discussion of our findings held
with J. T. Moore at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of concompliance were
disclosed.
We have examined actions you have taken with regard to previously identi-
fied enforcement matters. These are discussed in the enclosed inspection
report.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
[
Public Document Room.
g
i
1909 N ~
357160
.
.
.
.
JUL 311979
Duke Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
-
g< ,:; i s /
.
,
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-491/79-13,
50-492/79-13 and 50-493/79-13
cc w/ enclosures:
J. T. Moore, Project Manager
Post Office Box 422
Gaffney, South Carolina 29340