YANKEE ATCMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 79-08 FOR THE MONTH OF AUGUST, 1979 Lu2;i9 79091704/gy
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 700012 COhlPLETED BY R.M. Sio4ren TELEPHONE (617) 360-9011 X2281 OPERATING STATUS
- 1. Unit Name:
Yankee Rowe Notes
- 2. Reporting Period:
August 1979 600
- 3. Licensed Thennal Power (31Wt):
- 4. Na:neplate Rating (Gross 31We):
185 175
- 5. Design Electrical Rating (Net 51We):
180
- 6. Afaximum Dependable Capacity (Gross StWe):
- 7. Sf aximum Dependable Capacity (Net 31We):
175
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Lsst Report. Give Reasons-
- 9. Power Level To which Restricted. If Any (Net 11We):
None
- 10. Reasons For Restrictions.lf Any:
N/A
[
\\ -
This Sioath Yr.-to.Date Cumulative
- 11. Hours in Reporting Period 744 5,831
- 12. Number Of Hours Reactor Was Critical 744 5,633.53 136,824.43
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 744 5,622.78 132,500.78
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (31WH) 442,624 3,294,483 70,868,028.11
- 17. Gross Electrical Energy Generated (5fWH) 134,866.a,_,
1,033,954.6 _ 21,794,902.6
- 13. Net E!ectrical Energy Generated (5tWH) 126.675.64 971.887.66 20,405,768.32
- 19. Unit Service Factor 100 96.4 80.4
- 20. Unit Availability Factor 100 96.4 80.4
- 21. Unit Capacity Factor (Using 3IDC Nat) 97.3 95.2 73.6
- 22. Unit Capacity Factor (Using DER Net) 97.3 95.2 73.o
- 23. Unit Forced Outage Rate 0
3.0 1.7
- 24. Shutdowns Scheduled Over Next 6 3!onths (Type. Date.and Duration of Each):
Scheduled to meet the requirement of I & E Bulletin 79-13 September 8, 1979 three weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY C05151ERCIAL CPERATION ObD2iiO (9/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-29 UNIT ROVE DATE 790912 COMPLETED BY R.M. Siegren TELEPHONE (617) 366-9011 X2281 SIONTH August 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Netn (MWe-Net) 171.6 i
168.6 j7 168.4 33 171.6 3
13 A. 3 19 171.7 4
162.4
- o 171.4 171.6 5
168.4 73 6
169.1 22 171.7
\\
7 169.5 171.5 23 8
169.4 171.1 34 171.0 9
171.0 25 10 171.2 26 170.8 II 171.5
- 7 170.6 12 170.6 23 1.70.4 13 171.0 170.0 79 169.8 14 171.4 30 15 171 3 169.6 3g 16 171.7 INSTRUCTIONS On this fo mat.!ist the average dady unit power !evel in MWe Net for e
- ch day in the reporting month. Compute to the nearest whole me;swatt.
(o/77) v i
L
(
UNIT SilU1 DOWNS AND POWER REDUCTIONS DOCKET NO. 50-29 UNil' N AM E Rowe DA1E 790912 REPORT MON 1II August 1979 COMI't.E1ED ity R.M. Slogren g
TELI.PilONE (617) 366-9011
,/
X2281 N
i, M E Lkensee
$3,
'1 Cause & Corrective No.
Date R
Eg js5 Event gg h>o?
Action so g$ E 55c Iteport #
mU Prevent iteturience F
g o
O None N/A N/A N/A N/A N/A N/A N/A N/A N/A l
2
'3 4
IR l'ina ct)
Iteason:
Meilnul:
I:minbit G. Inst uctions S: St licif uleil A l'quipment Failure (Explain) 1-Manual for l'icpa,ation of Dai.
Il Maintenance of Test 7 Manual Scram.
Entry Sheets l'or 1.icensee C.ltclucling 3-Automatic Scram.
Evens Itcpini (1.l'Ill lite INUlti G-D.Itegulainiy Itcstriction 4 Oilict (Expl.:in) 0161) li Opceator l'eaining & l.icense Examination F Ailinini+.ieative 5
G Opesaiional I inir (1:xplain)
Exinleit 1 Same Sonese
('8/17) 11 Ilibce (lixplain)
DOCKET NO.
50-29 UNIT Rowe DATE 790912 COMPLETED BY R.M. Sjogren TELEPHONE (617) 366-9011 X2281 REPORT MONTH August 1979 SU'DtARY OF OPERATING EXPERIENCES 8/3/79 At 230,0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> a load reduction was con:=enced for turbine throttle and control valve exercises.
8/4/79 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> with plant load at 13% We the valve exercises were begun. At 0230 the turbine throttle and control valves exercises were satisfactorily co=pleted and plant load escala-tion co==enced.
At 0530 plant load had returned to full allowable power.
356'16.3 4