Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19208A667 + (ML19208A667)
- ML19208A668 + (ML19208A668)
- TXX-3037, Notifies of Potentially Reportable Deficiency Re Possible Cooling Problem W/Diesel Generators.Investigation Continues. Reportability Will Be Determined by 791006 + (ML19208A669)
- ML19208A670 + (ML19208A670)
- ML19208A672 + (ML19208A672)
- ML19208A673 + (ML19208A673)
- ML19208A674 + (ML19208A674)
- NUREG-0603, Ack Receipt of Comments on NRC Safety Research Program Budget, NUREG-0603.Research Budget for FY81 & Suppl Requests for Addl Funds in FY80 Have Been Reviewed.Offers Congratulations for Well Done Rept + (ML19208A675)
- ML19208A677 + (ML19208A677)
- ML19208A678 + (ML19208A678)
- ML19208A679 + (ML19208A679)
- ML19208A680 + (ML19208A680)
- ML19208A681 + (ML19208A681)
- ML19208A685 + (ML19208A685)
- ML19208A686 + (ML19208A686)
- ML19208A687 + (ML19208A687)
- ML19208A689 + (ML19208A689)
- ML19208A691 + (ML19208A691)
- ML19208A692 + (ML19208A692)
- ML19208A694 + (ML19208A694)
- ML19208A696 + (ML19208A696)
- ML19208A699 + (ML19208A699)
- ML19208A700 + (ML19208A700)
- ML19208A701 + (ML19208A701)
- IR 05000373/1979027 + (ML19208A705)
- ML19208A707 + (ML19208A707)
- IR 05000483/1979007 + (ML19208A709)
- ML19208A710 + (ML19208A710)
- ML19208A711 + (ML19208A711)
- ML19208A712 + (ML19208A712)
- ML19208A713 + (ML19208A713)
- ML19208A715 + (ML19208A715)
- 05000282/LER-1979-025-01, /01T-0:on 790830,during Pipe Walkdown Insp,One Pipe Hanger in Auxiliary Feedwater Sys Was Found Inoperable. Caused by Incomplete Installment During Const.Unit Repaired Immediately & Was Returned to Full Power + (ML19208A716)
- 05000315/LER-1979-041, Forwards LER 79-041/03L-0 + (ML19208A717)
- ML19208A718 + (ML19208A718)
- ML19208A719 + (ML19208A719)
- ML19208A720 + (ML19208A720)
- ML19208A722 + (ML19208A722)
- ML19208A723 + (ML19208A723)
- ML19208A724 + (ML19208A724)
- ML19208A725 + (ML19208A725)
- 05000324/LER-1979-073, Forwards LER 79-073/03L-0 + (ML19208A726)
- ML19208A727 + (ML19208A727)
- ML19208A728 + (ML19208A728)
- ML19208A730 + (ML19208A730)
- 05000277/LER-1979-040, Forwards LER 79-040/01T-0 + (ML19208A731)
- ML19208A732 + (ML19208A732)
- 05000324/LER-1979-073-03, /03L-0:on 790813,RHR Pump Breaker 2A Was Erroneously Racked Out,Making Both Loops of Sys Inoperable. Caused by Incorrect Prepration of Tag & tag-out Sheet by Control Operator.Personnel Instructed + (ML19208A733)
- ML19208A734 + (ML19208A734)
- ML19208A735 + (ML19208A735)
- 05000277/LER-1979-040-01, /01T-0:on 790821,contract Personnel Disarmed Carbon Dioxide Sys & Established Fire Watch.Caused by Personnel Error.Sys Restored to Normal & Personnel Involved Received Instruction on Work Requirements + (ML19208A736)